Certification for the Installation of Post-tensioning Systems

Slides:



Advertisements
Similar presentations
FACILITIES & EQUIPMENT
Advertisements

East Carolina University Compressed Gas Safety Training Program
ARC313 Building Code II. Review What is the minimum bearing pressure allowed for soils to support foundations? 75 kPa How can you tell by looking at the.
ISO 9001:2000 Documentation Requirements
SHOTCRETING K.V.SUBBA RAO.
Chp12- Footings.
Fall Protection Falls 4,628 fatal work injuries were recorded in the United States in deaths a week or 12 deaths every day 806 construction related.
Lecture 9 - Flexure June 20, 2003 CVEN 444.
Bridge Engineering (6) Superstructure – Concrete Bridges
JAB Plastic Products Corp. Technical Information.
MNM Fatal Falling Material Accident Falling Material Accident August 17, 2012 (Florida) August 17, 2012 (Florida) Victim Recovered September 4,
Pre-stressed Steel System Post Tensioned Slab Case Study: K- Financial Tower.
By: “The Slackers” Danny Efland Maria Cuellar Joel Irvine.
BS9990 : 2015 Updates and/or Changes
Concrete Pre Cast Panel By Peter Spence ID:
2E8 Materials (Civil Engineering Component) Civil Engineering Materials Department of Civil, Structural and Environmental Engineering Trinity College Dublin.
Section 3 design of post-tensioned components for flexure Developed by the pTI EDC-130 Education Committee lead author: trey Hamilton, University of.
Masonry. Terms –F > 15-5 –Go thru all figures –Joints between brick = ¼ inch.
Twinning Project RO2006/IB/EN/09 1 Saxony-Anhalt State Environmental Protection Agency Wolfgang GarcheBukarest Wolfgang Garche Saxony-Anhalt.
The Good, the Bad, and the Ugly 2 May 2008 Sacramento, CA Alan Macnab
CE7005 Prestressed Concrete
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
ISO 9000 Certification ISO 9001 and ISO
CRACK CONTROL IN CONCRETE MASONRY WALLS
Concrete Construction
Placing Quality Concrete
SELECTION AND INSTALLATION OF BRIDGE EXPANSION JOINTS
COLUMNS. COLUMNS Introduction According to ACI Code 2.1, a structural element with a ratio of height-to least lateral dimension exceeding three used.
Cracks in Concrete. 2-Classifications 2-Classifications 3-Concrete removal, preparation 4-References Cracks in Concrete 1-lntroduction.
1Furmanite Confidential - 1/9/04 Motor and Pump Base Foundational Repair.
Note: Moment Diagram Convention
Introduction Advantages Dis-advantages Methods of Pre-stressing Mix Design Curing Laboratory Test Visit Report.
Appendices Subpart R Steel Erection
World Health Organization
The new technology for watertight construction joints
SUMMARY FROM ACI 224.1R-93. When anticipating repair of cracks in concrete, it is important to first identify the location and extent of cracking. The.
BondChem TECHNICAL DATA Roll-a-crete ( Three Component Cementitious Waterproof Coating ) Page 1 / 2. DESCRIPTION BondChem’s Roll-a-crete is a three component.
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
Bridge Design to AS 5100 Sydney May 25th 2005 Using High Strength Concrete with AS 5100 opportunities and restrictions.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
I-99 HPC Initiative: Upcoming Work. Phase II Testing  25 Phase II Mixes –Control, silica fume, fly ash, slag, ternary, Aquron, Ipanex  Phase II Testing.
Sampling and Testing Concrete Mixes MATERIAL TESTING LABORATORY
Mechanical Design of Process Equipment FUNDAMENTAL PRINCIPLES AND EQUATIONS Principal stresses Theories of failure
FALL PROTECTION. Duty To Have Fall Protection Protection at or above 6’ level Walking/working surfaces inspected before work begins Employees can only.
LONG TERM GEODETIC MONITORING OF THE DEFORMATION OF A LIQUID STORAGE TANK FOUNDED ON PILES P. Savvaidis Laboratory of Geodesy Dept. of Civil Engineering.
Mechanical Properties of Materials
BILBOND H 4545 Formerly Bhavi International Ltd.
Patented Technology – Quality Results Ulti-Pave 3 Pavement Repair Mix 30-Minute Workability 3,000 PSI 3-Hour Set ® “A One Component, Rapid Hardening Cementitious.
Concrete Inspection Construction Inspection for Field Office Activities.
EAS 453 Pre-stressed Concrete Design
CE UNIT 1  Maintenance is the act of keeping something in good condition by checking or repairing it regularly.
Concrete Repair presented by: Amirhossein Jodeiri Mapua Institute Of Tecnology.
5. FERROCEMENT.
Design and Control of Concrete Mixtures CHAPTER 11
Concrete Repair.
Visit for more Learning Resources
METHODS OF CRACK REPAIRS
DURABILITY OF CONCRETE STRUCTURES RURAL POLYTECHNIC TARIHAL
REPAIR AND REHABILITATION OF STRUCTURES
G.GUNA….SRVEC DEPARTMENT OF CIVIL ENGINEERING
Cast in Place 2 way Flat slabs Basically joists in both directions
Subpart M Fall Protection.
UTILITY VAULTS: THE PRECAST ADVANTAGE
Durability and Post-Tensioning
RCC UNIT-12 Prestressed Concrete
Structure II Course Code: ARCH 209 Dr. Aeid A. Abdulrazeg
Document Development for Metro Project: Performance-based Procurement Asphalt Overlay for Programmed Maintenance 17/01/2019.
ASSESSEMENT AND REHABILITATION OF STRUCTURES
By: Clarence Fragoso and Jonathan Lopez
Fiber Reinforced Polymer Systems
Presentation transcript:

Certification for the Installation of Post-tensioning Systems by Richard Digman

PT Certification Overview CARES is a certification body which is accredited by the UK Government via UKAS (United Kingdom Accreditation Service). The Crown and Tick in the CARES logo indicates Government accreditation and the registration number 0002 indicates that CARES was the second certification body to be accredited. CARES is a specialist certification body operating in the construction industry covering: Reinforcing and prestressing steels Ancillary products: couplers, continuity systems, punching shear systems. Post-tensioning contractors, post-tensioning kits.

Post-tensioning Contractor Certification CARES has two main schemes for PT contractors: CARES PT1. for highway structures (bridges). PT2. for flat slab construction. Initial CARES certification requires an audit of the head office QMS and audits of all PT site activities. Maintenance of certification requires one audit of head office and a minimum of three site audits per year.

PT Office Requirements Quality management system to ISO 9001 Contract review – to ensure contract requirements are met. Purchasing – to ensure products comply with contract specification and relevant standards. PT operative training – to ensure that only skilled operatives undertake key PT operations. Qualified Post-tensioning system (kit). Site quality plan and method statements covering all PT activities.

Post-tensioning Operative Training Post-tensioning operations must be carried out by operatives with appropriate knowledge, training and proven experience. The PT contractor must train and certify supervisors and operators to meet the requirements given in CARES Appendix PT9. The number of inexperienced personnel (labourers for example) should be limited and be balanced according to circumstances but normally not exceed 50% of the post-tensioning personnel.

Site Requirements Compliance with contract specification, quality plan and best practice. Receipt and storage of materials/products. Installation processes compliant with method statements. Inspection and testing. Site records.

Installation: Storage of Materials on Site Materials must be stored on site in a way that prevents damage or deterioration. Bagged materials have a specified shelf life and the bags are normally date marked. The material must be used by the specified date. Strand must not be corroded!

PT System Qualification Whole PT kit should comply with BS EN 13391 or ETAG013 which ensures: Load efficiency of >= 95%. Fatigue resistance >= 2 million cycles. Anchorage can carry a load of 1.1 fpu. Evidence of PT kit qualification should be obtained such as a product conformity certificate or test report. The evidence should also detail the PT kit specification, it is not acceptable to mix components from different kits particularly strand types.

Strand Requirements Strand to comply with BS 5896 and be relaxation class 2. BS 5896 has three strand types (a) seven-wire standard strand, (b) seven-wire super strand, (c) seven-wire drawn strand. Strand should be designated in accordance with BS 5896 for example seven-wire super strand, nominal diameter 12.9 mm and nominal tensile strength 1770, class 2 relaxation is designated: BS 5896/3 super strand - 1770 - 12.9 - relax 2.

Unbonded Tendons Unbonded tendons are enclosed in a plastic sleeve which must be at least 1.0mm thick and made from high density polyethylene or polypropylene. PVC should not be used. High density polyethylene is more flexible and less liable to embrittlement at extremely low temperatures, while polypropylene is more stable at high temperatures. The friction between the coating and the strand should be no more than 60N/metre.

Duct and Vent Requirements Duct, vent and connection material should be: Smooth galvanised steel with a minimum wall thickness of 0.35mm. Corrugated galvanised steel with a minimum wall thickness of 0.30mm. High density polyethylene or polypropylene with a minimum wall thickness of 2.0mm. PVC should not be used.

Installation: Duct, strand, anchorages …. The duct system/tendon must be adequately fixed to resist movement and floatation during concrete placement. Tendons should be installed to an accuracy of 5mm vertically (t/40 for slabs less than 200mm thick) and 50mm horizontally in beams and 150mm horizontally in floor slabs. Unbonded tendons can be deviated to avoid obstructions with the agreement of the Contract Administrator (CA). Tendons with flat ducts are relatively stiff in the transverse direction and cannot usually be deviated around obstructions. Tendon profiles should be smooth. Bursting Reinforcement must be concentric with the tendon.

Bursting Reinforcement (Photo by Balvac) Bursting reinforcement must be concentric with the tendon in order to be effective (the above is awaiting fixing).

Concreting (Photo by Balvac) Tendons need to be fixed to avoid displacement or flotation during concrete placement.

Location of Vents Vents should be fixed at injection and exit points and should extend approximately 500mm above the slab surface. Where tendon drape exceeds 500mm, intermediate vents should be fixed at tendon high points. Intermediate vents should normally be used on tendons over 15m-20m in length.

Installation: Stressing Equipment Stressing jacks and their load measuring system should have an appropriate and current calibration certificate, which is traceable to national standards, and no more than 6 months old at the time of stressing. The calibration certificate should be provided by a qualified laboratory and should include a calibration curve. The stressing equipment should be capable of establishing a tendon load to an accuracy of +/-2%.

Installation: Stressing The post-tensioning contractor should calculate the theoretical tendon extension. Stressing should not commence without prior agreement on theoretical extensions nor before the concrete has achieved the specified transfer strength. The jacking force should not normally exceed 75% of the tendon’s characteristic strength At transfer, initial prestress should not normally exceed 70% of the tendon’s characteristic strength, and in no case should exceed 75%. Tendons should be stressed in the specified sequence and load increments.

Installation: Stressing Tendon Elongation The prime measurement of tendon load is through the stressing jack and recorded on the stressing record. Tendon extensions are a secondary indicative measure. For slabs load/extensions are normally measured prior to stressing, and after stressing and locking off to an accuracy of 2% or 2mm and take into consideration the possible strand movement at the dead end anchor. For long complex profiles such as bridge decks, multiple measurements are usually taken to allow extrapolation to determine both the elastic and non-elastic extension. The actual extensions should normally be within +/-6% of the theoretical extensions for groups of tendons and +/-15% for individual tendons.

Extension Measurement Measurement of tendon extension at the stressing jack.

Extrapolation of Extensions Tendon extensions are usually measured at two loads points and plotted on a graph and the extension extrapolated back to the zero load point. The above graph shows approximately 25mm displacement at zero load which represents the initial slack with the system.

Installation: Grout Steel in a stressed state is subject to accelerated corrosion, it is therefore important that tendons are quickly and correctly protected from corrosion. It is recommended that grout is made from pre-bagged material requiring only the addition of a measured amount of water. Grout should be batched to an accuracy of +/-2% for dry materials and +/- 1% for mixing water. Grout made from bagged cement is non preferred because of the variability of material properties and bag weight.

Installation: Grout Properties Grout should have the following properties, determined in accordance with the test procedures of ETAG 013 Annex C clause C.4.3.3.2. Extract from CARES Model Specification

Installation: Grout w/c Ratio The w/c ratio should be kept as low as possible as bleed water is excess water in the grout that is not chemically bound and can lead to low density grout, grout cracking, shrinkage and porosity. The necessary grout properties can be achieved with a properly formulated grout and the addition of minimum quantities of water.

Installation: Grouting It is recommended that ducts are blown through with oil free compressed air prior to grouting. Grout injection should be continuous at an agreed rate and be slow enough to avoid segregation of the grout. The method of injecting grout should ensure filling of the ducts and complete surrounding of the steel.

Grouted Tendon (Photo Balvac) Section through grouted duct

Installation: Grout Venting Grout should be vented from each intermediate and exit vent until it is of the same consistency as that of the injected grout. All vented grout should be discarded. All vents should be closed one after another in the direction of grout flow and the injection sealed off under a nominal pressure of 0.1MPa (14psi).

Installation: Post Grout Inspection The level of grout in the injection and the vent tubes should be inspected after the grout has set. If the level of grout has fallen below the required final level or the material is degraded, all defective grout should be removed from the vent and topped up. Grouted ducts should be protected to ensure that there is no damage to the grout due to shock or vibration for 24 hours after injection of the grout and that the temperature in the ducts does not fall below 5°C for 24 hours after injection of the grout. Two days after grouting, the level of grout in the injection and vent tubes should be inspected and if the grout level has fallen below the top of the slab, remedial measures should be agreed with the Contract Administrator (CA). On completion of grouting, grout vents should be cut off to slab level and positively sealed to ensure the encapsulation to the tendons is complete.

Installation: Grout Testing Grout suitability tests should be undertaken prior to contract. Grout acceptance tests should be undertaken during contract at the following frequencies: Extract from CARES Model Specification

Installation: Grout Testing (Photo Balvac) Fluidity testing of grout

Installation: Sealing of Anchorages Anchorage components must be sealed against the ingress of water or aggressive agents likely to cause corrosion of the steel or anchorage. In the case of grouted tendons, special mortars/renders and bonding agents are recommended, as mortar/render can be permeable and subject to shrinkage. The chosen method of sealing shall be capable of resisting the specified grout pressure. For unbonded tendons it is recommend that anchorage components are coated with grease of similar specification to that used in the tendon and that a watertight cap be applied over the coated area. The minimum concrete end cover to the cap should be 25mm.

Installation: Sealing of Anchorages (Photo Balvac) Sealing of PT anchorages against corrosion

Specification The key to a good PT installation is a good PT specification. The lack of guidance to specifiers has lead to some inappropriate and out of date PT specifications. For this reason CARES has produced “Model specification for bonded and unbonded post-tensioned floors” to give guidance to specifiers. The model spec is available for free download from www.ukcares.com

CARES Model Specification