Pipeline Qra Seminar Title slide Title slide.

Slides:



Advertisements
Similar presentations
An Intellectual Joust - Challenge - - Are you willing to confront propositions that jolt your safety management comfort zone ?
Advertisements

1 Acceptable Levels of Safety Severity Classification Likelihood Classification Risk Classification Scheme Safety Objective Classification Scheme Regulations.
Integra Consult A/S Safety Assessment. Integra Consult A/S SAFETY ASSESSMENT Objective Objective –Demonstrate that an acceptable level of safety will.
5th Module: Evaluating Information Systems: Structure: 1.Reasons for IS Evaluation 2.Difficulty of IS Evaluation 3.Evaluation Techniques 4.Evaluation in.
New Nuclear Build - Economic Regulation? Gregg Butler Director: Integrated Decision Management Ltd Professor of Science in Sustainable Development, University.
Risk Management Introduction Risk Management Fundamentals
Determining the Significant Aspects
4/2003 Rev 2 I.1.1 – slide 1 of 13 Session I.1.1 Part I Review of Fundamentals Module 1Introduction Session 1Learning Objectives, Course Table of Contents.
Note: Lists provided by the Conference Board of Canada
1 Setting Target Reliabilities by Marginal Safety Returns Rolf Skjong Strategic Research Det Norske Veritas JCSS Workshop on Code.
SEPTEMBER 8-12, 2014 INOGATE PIPELINE QRA SEMINAR Title slide PIPELINE QRA SEMINAR.
Please read this before using presentation This presentation is based on content presented at the Industry Forum on Reducing.
Case Study in Successful Risk Management – The Oil and Gas Industry in Norway Some critical reflections Terje Aven University of Stavanger, Norway.
Pipeline Qra Seminar Title slide Title slide.
PPRT PREVENTION DES RISQUES ET LUTTE CONTRE LES POLLUTIONS Safe Communities & a Sustainable Hazaedous Industry : Present and Future Discussion.
Topic 4 - Risk Assessment Textbook pages 72–77. Learning outcomes By the end of the topic learners will have: Greater familiarity with risk assessment.
Assessment of Systems Effort Factors Functionality Impact Factors Functionality Interface Usability What it does Collection Value to task Effectiveness.
1 Risk evaluation Risk treatment. 2 Risk Management Process Risk Management Process.
Please read this before using presentation This presentation is based on content presented at the Industry Forum on Reducing.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT RISK ACCEPTANCE CRITERION 2.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO RISK IDENTIFICATION 2.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO HAZID 2.
1 SKJ©DNV Cost Effectiveness of Hull Girder Safety Rolf Skjong & EM Bitner-Gregersen Det Norske Veritas OMAE, Oslo, June 24-28, 2002.
BY Muhammad Suleman MBA MIT BSC (COMPUTER).  What is decision Making  Why decision Making  Conditions under which decision are made  What is Rational.
Implementing a Risk Management Process Compliant with ISO 14971:2007 & How to Address the Seven Deviations Identified in EN ISO 14971:2012 Before I start.
Hazard Analysis Critical Control Point (HACCP)
Pipeline Qra Seminar Title slide Title slide.
Business Planning for a Successful Project Jason Karszes, Jeff Perry, Cathy Wickswat, Kyle Getty, Joan Petzen.
Introduction to Risk Management C7 Slide 1. The Concept of Safety  ‘Safety’ refers to the reduction of risk to a tolerable level  Risk = Likelihood.
Presentation 4: How can I know if nanomaterials are used in my workplace?
National Public Health Institute, Finland Open risk assessment Lecture 7: Evaluating assessment performance Mikko Pohjola KTL, Finland.
PREPARED BY MS. ROSITA ARMAN MICHAEL ANNIAH MBA IN STRATEGIC MANAGEMENT (UTM) BA. ESTATE MANAGEMENT (UITM)
Risk Management Approaches to Hydrogen Safety. Risk Assessment, Limbo Dancing, and ALARP Les Shirvill.
HU151: Industrial Safety Prof. Abdelsamie Moet Fall 2012/13 Pharos University in Alexandria Faculty of Engineering Lecture 3: Risk Acceptance.
Classification: Internal Understanding and Handling Residual Risks SPE Annual Technical Conference, Denver 2011 John Zhao, MSc.
hansen – managing safely Risk Assessment - An Appreciation Mark Mallen Health and Safety Manager Fenlock-Hansen Ltd.
An overview of multi-criteria analysis techniques The main role of the techniques is to deal with the difficulties that human decision-makers have been.
Jacques Vanier ICAO EUR/NAT Regional Officer Almaty, 5 to 9 September 2005 SAFETY MANAGEMENT SYSTEMS RISK VERSUS SAFETY.
Assurance service/engagement
SAFETY REPORTS Reg 4 Every operator shall take all measures necessary to prevent major accidents and limit their consequences to persons and the environment.
RISK BASED DECISIONS – THE ROLE OF SCIENTIFIC EXPERTISE AND JUDGEMENT PAUL DAVIES HSE’s Chief Scientist & Director Of the Hazardous Installations Directorate.
Risk Estimation Two distinct categories of Risies Voluntary Risks e.g. driving or riding in an automobile, and working in an industrial facility. Involuntary.
Module 3 Understanding and planning under uncertainty
IAEA Training Course on Effective and Sustainable Regulatory Control of Radiation Sources Strategies for Effective and Sustainable Regulatory Control –
5 th May 2009 Assurance, Confidence and Software Safety Dr. Richard Hawkins.
SINGING FROM THE SAME HYMN SHEET Address to SATS Study Day 29 June 2013 Dr Sue Armstrong.
SHEC Training Standards in Explosives Manufacturing Eurodyn Sprengmittel GmbH, Wuergendorf/Germany Panchyrz, Walter – Eurodyn Sprengmittel GmbH September.
RER/9/111: Establishing a Sustainable National Regulatory Infrastructure for Nuclear and Radiation Safety TCEU School of Drafting Regulations November.
Danish Institute for Quality and Accreditation in Healthcare; februar 2016 The Danish Healthcare Quality Programme.
OHS RISK ASSESSMENT PROCEDURE Title: OHS Risk Assessment Procedure Document Unique Identifier: (Revision 2) Effective date: July 2014.
Trade Union Training on the Validation of the training manual entitled “Union Training on Occupational Safety and Health” Risk Assessment.
© Food – a fact of life 2009 Hazard Analysis Critical Control Point (HACCP) HACCP is a system which looks for and prevents potential problems before they.
Please read this before using presentation
Auditoria Interna e Gestão de Risco Operacional
Workshop on CSM-DT, November 2016
Project Management – PTM721S
Landpower Project Zero Harm Learning Series Module:. #7a Module Title:
A Risk-based Approach to Training Paul Cheeseman & Kerry MacDonald
Regulation (EU) No 2015/1136 on CSM Design Targets (CSM-DT)
ALARP: when is enough, enough?
SAFETY MANAGEMENT SYSTEMS RISK VERSUS SAFETY
DEFINITIONS.
Landpower Project Zero Harm Learning Series Module:. #7a Module Title:
C. Richard Donnelly and M. O’Mara, Hatch – Canada
מערכות ניהול בטיחות ובריאות בתעסוקה - דרישות
HSE Case: Risk Based Approach.
The Importance of Project Risk Management
תקציב הבטיחות והבריאות בתעסוקה וניהולו בארגון
IAEA General Conference Regulatory Cooperation Forum Regulatory Approach Prescriptive vs Performance Based David Senior Executive Director -
Presentation transcript:

Pipeline Qra Seminar Title slide Title slide

Introduction to ALARP Content slide Description ALARP = As Low As Reasonably Practicable The ALARP principle is that the residual risk shall be as low as reasonably practicable Intolerable Tolerable if ALARP Content slide Broadly acceptable Content slide

Risk reducing measure (risk reduction) Introduction to ALARP Risk reducing measure (risk reduction) Description ALARP = As Low As Reasonably Practicable The ALARP principle is that the residual risk shall be as low as reasonably practicable Original risk Residual risk Content slide Content slide

Introduction to ALARP Usually talking about: - Tolerable (acceptable - green) - Intolerable (unacceptable - red) And then… - ALARP (control to ALARP/acceptable if ALARP - yellow) What is ALARP?

Introduction to ALARP Content slide, two columns with image When is a risk tolerable (acceptable)? What is a risk intolerable (unacceptable)? How much risk reduction is possible? How safe is safe enough? Content slide, two columns with image Content slide, two columns with image. Image size: 8,46 cm x 10,76 cm or 320 x 407 pixels

Intolerable risk In the intolerable risk region the risk cannot be accepted and it is thus necessary to reduce the risk and make it tolerable through implementation of risk reducing measures (RRMs) or re-design.

Tolerable if ALARP In the tolerable risk region (often referred to as the ALARP region) attempts should be made to reduce risk. Risk in this region can only be accepted if it can be demonstrated that risk is ALARP, i.e. that all reasonably practicable measures have been implemented to reduce risk.

Broadly acceptable In the broadly acceptable region the risk is acceptable and no further risk reduction is required. It should be noted that in some countries there is no lower limit defining acceptable risk. Consequently, risks below the intolerable limit shall be demonstrated to be ALARP. According to the ALARP principle risks that are in the tolerable region must be reduced further if not disproportionally costly, compared to the risk reduction. The ALARP principle is applicable both in relation to qualitative risk acceptance criteria (e.g. a risk matrix) and quantitative acceptance criteria (used e.g. in QRAs).

Introduction to ALARP - workflow

ALARP Sheet

Introduction to ALARP

Introduction to ALARP Risk matrix Content slide Content slide

Operator interface with design hazid

Introduction to alarp Origin from the U.K. where it is a legal requirement Different approaches through the world In Denmark offshore Health and Safety Cases need to present ALARP justification For a risk to be ALARP it must be possible to demonstrate that the cost involved in reducing the risk further would be grossly disproportionate to the benefit gained. The ALARP principle arises from the fact that infinite time, effort and money could be spent on the attempt of reducing a risk to zero.

Introduction to ALARP In the great majority of cases, we can achieve ALARP by referring to existing ‘good practice’. For high hazards and complex situations, we build on “good practice”, using more formal decision making techniques, including cost-benefit analysis, to present ALARP.

Introduction to ALARP In essence, making sure a risk has been reduced ALARP is about weighing the risk against the cost (or effort or time or technical difficulties) needed to further reduce it. The decision is weighted in favour of health and safety because the presumption is that the stakeholder should implement the risk reduction measure. The majority of risks we face are already at this ALARP level and we accept them relatively unconsciously. For most of us in our everyday lives, the risk of being pick-pocketed is so low, that we don’t feel the need to carry cash in separate pockets or hidden money belts. We similarly manage slightly higher risks, such as crossing the road, by routine procedures that we were taught as children.

Introduction to ALARP

Introduction to ALARP In the end, two conflicting objectives need to be balanced: We have a desire to do everything physically possible to remove all risks. The reality is that we have limited resources and that it is nearly always not practical (nor physically possible) to remove all risk. The question is then: How much risk do we remove before we stop? How do we balance the two objectives? The level where we stop is defined by an acceptance criterion OR the ALARP principle!

End ALARP End slide Endslide