1 California: Nuts & Bolts Lessons from the “School of Hard Knocks” Susan R. Schneider July 6 th, 2014.

Slides:



Advertisements
Similar presentations
Energy in Todays Economy: Challenges and Opportunities Dr. Kenneth L. Lay Chairman, Enron Corp. Economy Roundtable Austin, Texas January 3, 2001 For further.
Advertisements

PG&Es 2009 Participating Load Pilot. 2 Overview Regulatory Context Pilot Characteristics Lessons Next Steps.
Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
Energy in the U.S. - Why Wind? Financing Wind Power: The Future of Energy Institute for Professional and Executive Development Santa Fe, N.M. July 25,
Electricity and Natural Gas Supply, Reserves, and Resource Adequacy CMTA Energy Conference Energy: Growing Californias Economy William J. Keese California.
The Midwest ISO from a Transmission Owner Perspective.
MISO Day 2: A Transmission Users (Marketers) Perspective Leon White August 8, 2007.
Planning for a Low-Carbon Future at San Diego Gas & Electric Rob Anderson Director of Resource Planning San Diego Gas & Electric Western Resource Planners.
The Federal Reserve System Chapter 14 Copyright © 2010 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 4 Supply Contracts.
An Introduction to International Economics
The Single Electricity Market in Ireland
APPAs Competitive Market Plan: A Reform Proposal Susan Kelly VP, Policy Analysis and General Counsel, APPA AAI 9 th Annual Energy Roundtable March 3, 2009.
EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
High Spiking Prices Are Harming Low Income New York Utility Customers Gerald Norlander Executive Director Public Utility Law Project of New York, Inc.
Highlights of the 2003 New York ISO State of the Market Report David B. Patton, Ph.D. Potomac Economics Independent Market Advisor April 14, 2004.
Capacity Planning For Products and Services
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
Legal Framework, Investment Opportunities and Technical Innovation in the Electricity Sector Security of Supply through competitive markets: Design of.
California Roundup: Summary of DR Activity in California John Goodin Lead, Demand Response 2008 National Town Meeting on Demand Response June 3, 2008.
New England Developments in Demand Response and Smart Grid 2010 National Town Meeting on Demand Response and Smart Grid Henry Yoshimura, Director, Demand.
1 Establishing Efficient Marketplaces - lessons learned Presentation by: Kjell Asserlind APEx Annual Conference Cartagena, October.
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. Merchandising Activities Chapter 6.
EDISON INTERNATIONAL® SM Green Technology and Renewable Energy Opportunities 4 th Annual India Trade Conference, June 23, 2011 Cerritos CA Gary Barsley.
Directie Toezicht Energie, Bonn WS 8 february Bonn 1 SG Workshop: Secondary markets for interconnection capacity: way to adress contractual congestion.
Antitrust/Competition Commercial Damages Environmental Litigation and Regulation Forensic Economics Intellectual Property International Arbitration International.
Congestion Management Settlement Credits December, 2002.
Cost Ranges for the Development and Operation of a Day One Regional Transmission Organization PL
Gloria Godson VP, Federal Regulatory Policy Reliability Pricing Model Part 2.
Roles and Responsibilities network owners system operator(s) regulators Infrastructure brokers power exchange(s) Market Places generatorsconsumerssupplierstraders.
CPUC Procurement Policies Robert L. Strauss California Public Utilities Commission Energy Division - Procurement Section.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
The Yellow Book and the Blue Book 1993: PUC staff produces Yellow Book –Blames high prices on regulation and planning –Proposes alternative forms of competition.
A Primer on Electric Utilities, Deregulation, and Restructuring of U.S. Electricity Markets W.M. Warwick July 2000 Revised May 2002.
Solutions to California’s Energy Crisis: Real-Time Pricing by Frank Wolak Chairman, Market Surveillance Committee March 17, 2001.
1 RELIABILITY AND COMPETITIVE ELECTRICITY MARKETS POWER Research Conference UC Berkeley March 19, 2004 Paul Joskow MIT, CEEPR, CMI and Jean Tirole IDEI,
Market Overview in Electric Power Systems Market Structure and Operation Introduction Market Overview Market Overview in Electric Power Systems Mohammad.
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
The California energy crisis Introduction (Wolak March ‘01) –Wholesale: averaged $33 MWH in 1999, $116 MWH in 2000, $310MWH Jan –Natural gas $3-$4.
Energy Production and Use in California Source: California Energy Commission
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
Retail Competition: Managing a Difficult Transition David L. O’Connor Commissioner Massachusetts Division of Energy Resources (DOER) Presentation to National.
The Texas Renewable Energy Program National Governors Association Scottsdale, Arizona April 29, 2004.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
ENERGY REGULATORY AND MARKET DEVELOPMENT FORUM November 4, 2010 The Honorable Philip D. Moeller Commissioner Federal Energy Regulatory Commission “ENERGY.
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
Review of CAISO Wholesale Electricity Market Trends APEX Sydney Conference California Electricity Wholesale Market Trends October 13, 2008 Anjali Sheffrin,
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
SOUTHERN CALIFORNIA EDISON SM Southern California Edison Company’s Proposal to Participate in Convergence Bidding August 23, 2010.
Illinois Wholesale Market Update December 10, 2003.
To Buy or To Build Is it really one or the other? APPA New Generation Workshop Portland, Oregon August 1, 2007.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Renewables Portfolio Standard Status Report California Public Utilities Commission February 26 th, 2008.
1 Dr. Ahmed Kaloko Chief Economist Pennsylvania Public Utility Commission Harrisburg, Pennsylvania Transition from Public Service to Competitive Markets.
Community Choice Aggregation Demonstration Project Marin County Base Case Feasibility Analyses Overview April 5, 2005.
CPUC Resource Adequacy Program – LAO briefing May 25, 2009.
Wind Management at MISO
Asia-Pacific Energy Regulatory Forum
The New Texas Wholesale/Retail Market
The Future of Demand Response in New England
New England Electricity Restructuring Roundtable
Forecasting and Operations CAISO Case
Wholesale Electricity Costs
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

1 California: Nuts & Bolts Lessons from the “School of Hard Knocks” Susan R. Schneider July 6 th, 2014

2 CALIFORNIA EXPERIENCE California/CAISO market overview Restructuring motivation & “horsetrading” How things actually worked Lessons & reflections Challenges ahead

CALIFORNIA MARKET OVERVIEW 3

4 CALIFORNIA REGIONAL SYSTEM OPERATORS

5 CAISO STATISTICS Combined service areas of PG&E, SCE, SDG&E, and several municipal utilities Peak demand >50,000 MW 124,000 square miles 25,000 circuit-miles (~75% of California grid) 1,400 power plants (~55,000 MW), more than England and France combined Serves ~12% of U.S. population (30 million people)

6

TRANSMISSION CONGESTION CONSTRAINS ECONOMIC DISPATCH 7

8 CAISO FEATURES Structure: Non-profit “public benefit corporation” (not a state agency) Funding: Surcharges (Grid Management Charges) on market schedules, transactions, & other grid use (first call on funds) Governance: 5-member independent Board appointed by the California Governor

9 CAISO ACTIVITIES Forward schedule management: Day Ahead (10am), Hour Ahead, Fifteen Minute Congestion management & market optimization (energy, unit commitment, reserves), based on economic bids Real-time (RT) operations: 15-minute unit commitment, 5-minute economic dispatch After-the-fact settlements and billing Transmission/generation outage coordination Transmission & grid planning Generation interconnection studies/contracts Market monitoring

MARKET PRICING STRUCTURE Market-clearing prices for energy: Maximum bid and clearing prices Zonal pricing structure first Nodal pricing now (3,300 pricing nodes) Ancillary Services Regulation, Spinning Reserve, Non-Spinning Reserve Includes opportunity costs for energy if not dispatched Real-time differences from forward schedules billed/paid at RT price 10

OTHER KEY MARKET ENTITIES Government entities California Public Utilities Commission: Oversees energy procurement & contracting (IOUs), transmission siting/permitting, retail rates California Energy Commission: Oversees generation siting & permitting, long-range planning & policy Other entities Participating Transmission Owners (3 large IOUs, 13 others) Scheduling Coordinators (100+) Load-Serving Entities (LSEs) – Utilities, Community Choice Aggregation, others Suppliers – Generators & import suppliers/traders 11

11/23/ L L L EACH LSE & SUPPLIER (generator or import) MUST HAVE A CERTIFIED SC CAISO LSE SC GEN SC L L L L L L L L L L LL LSE GEN LSE SC LSE LSE GEN IMPORT

RESTRUCTURING – MOTIVATION & “HORSETRADING” 13

14 RESTRUCTURING DRIVERS (1980s – Early 1990s) Trend toward deregulation (“Reagan revolution,” airlines, natural gas (30% of market)) – “Government is part of the problem.” Utility monopoly under fire (cost overruns, high rates, capacity surplus, modular technology) – perception of utility inefficiency, “Markets can do better.” Muni pressure for transmission access Business pressure for retail competition (natural gas deregulation, high costs, bad economy, relocation threats) – competition as a way to “do something” without hurting others.

AB1890 – The “Steve Peace Death March” CPUC examination of open markets in , but legal authority for change not clear Big battles in California State Legislature between utilities, business/competition advocates, labor/unions, & consumer interests Grand bargain struck between these interests, and legislation passed both houses of the legislature unanimously in late

ORIGINAL BARGAIN – SOMETHING FOR EVERYONE! Retail customer protection (especially small ones) All customers get “choice” at the same time (1/1/1998) 10% rate reduction (bonds), then rates frozen Consumer protection rules for new retail suppliers & education effort Independent System Operator (CAISO) Transmission control – IOUs still own assets (and earn returns) but don’t control them operationally Open-access system – transparent tariffs & operating procedures (corporate doc on CAISO Web site –

ORIGINAL BARGAIN (2) Instant competition, labor protection - multiple suppliers immediately through utility divestiture 50% of gas capacity required, incentives to divest more Buyers required to keep existing workforce for 2 years Cost coverage: Use “headroom” between frozen retail rates & lower market energy costs to: Recover utility “stranded” & transition costs (including labor severance, retraining, early retirement, and outplacement) and rate-reduction bond payments Continue “Public Purpose” programs (low-income, conservation/energy efficiency, renewables) 17

SO WHAT COULD GO WRONG? 18

IMPLEMENTATION Implementation was difficult, expensive, and rushed. Design details took years – not enough time for 1/1/98 “start-from-scratch” effort Late market start – 4/1/98, just before peak season Had to use off-the-shelf software, multiple vendors – interface issues, high costs ($200m) Some elements (e.g., market monitoring) not sufficiently addressed 19

CONSUMER PROTECTION Many consumer protections did not work as expected. All got 10% discount Large customers were courted by suppliers Small customers were mostly not, and only got additional real and sustainable options later Reliability suffered, and rolling blackouts were called in northern California in winter

RECOVERY OF STRANDED & TRANSITION COSTS Insufficient “headroom” – wholesale energy costs exceeded frozen retail rates. Wholesale energy prices fell initially but then rose: $29/MWh in 1998, $31/MWh in 1999, $110/MWh in 2000 Generation surplus became shortage Annual demand growth 1-2% in early 1990s, 3-4% in , >5% in 2000 (demand growth also in surrounding import markets) Lack of new capacity – no entity would sign contracts; utilities stopped building for several years, and no one stepped in right away Questionable maintenance & forced outages Market power issues with congestion & market structure – extensive litigation for refunds from private & public suppliers 21

INSTITUTIONAL FAILURES One of the two largest utilities declared bankruptcy Utilities couldn’t pay bills – wholesale power exchange failed Recall of California governor (out went Gray Davis, in came the “Governator”) – energy crisis an important factor 22

EVENTUAL RECOVERY (1) New resources came on-line State stepped in to execute long-term contracts for new generation (creditworthy counterparty) Contracts were expensive, rushed, & not well-negotiated, but they did bring on new capacity Improved market monitoring & rules, e.g.: Imposition of bid-price caps, other conduct rules Establishment of conduct rules, performance metrics Institution of generation maintenance and outage standards & practices Settlement of much crisis-era litigation 23

EVENTUAL RECOVERY (2) – LSE Procurement Obligations LSE “obligation to serve” clarification: Must procure (own/contract) resources for their loads Resource Adequacy (RA) Requirements Capacity to serve peak load + Planning Reserve Margin Specific RA requirements in “load pockets” Bilateral PPAs with performance incentives & penalties Must-offer obligations for RA Resources (key feature) Return of integrated resource planning (CPUC): Procurement separated from transmission functionally but considers transmission “adders” 24

REFLECTIONS & LESSONS LEARNED 25

TRANSITION, TRANSITION! The journey can be as important as (or more important than) the destination With multiple complex changes all at once, things will not turn out as expected – flexibility and contingency plans are needed in case problems arise  “Trust, but verify.” (RR) Market roles & rules must be clear throughout – don’t leave gaps, especially for obligation to serve and conduct rules 26

IMPLEMENTATION MECHANICS Small details can take a lot of time to address (e.g., meter-data sharing, billing procedures & disputes) Consider building on existing software, processes Consider phased implementation (e.g., wholesale before retail, critical changes in stages, large customers before small customers, gradual granularity improvements) Don’t deploy major changes before peak season Provide authority/process to reverse or delay changes if problems arise 27

DIVESTITURE REQUIRES CAREFUL CONSIDERATION Added suppliers but also problems Quick, low-risk California market entry by buying removed the need for new entrants to build Divested assets (gas gen) were market-critical Utilities divested 100% (40% of total nameplate capacity) “Pairing” of divested plants reduced buyer diversity Natural gas was the supply “at the margin,” i.e., set market prices and needed for system balance Plants located in critical areas (load pockets) – that’s why they were sited there in the first place 28

LONG-TERM, SECURE FUNDING CRITICAL FOR NEW INVESTMENT Short-term markets don’t facilitate long-term investments - financing new plants requires: Coordinated resource procurement & transmission – requires coordination by multiple oversight entities Creditworthy counterparties, secure revenue sources Limitation of long-term market risks to generators Short-term price signals don’t necessarily incent the “right” new resources, in the “right” place 29

RISK MANAGEMENT BY LSEs – Typical PPA provisions LSEs & suppliers execute bilateral PPAs LSE receives all capacity benefits (RA credit) and any renewables credits for project PPAs provide for: Payment terms for project output Availability & production guarantees Any curtailment provisions LSE is Scheduling Coordinator for project Bids project output into CAISO markets, receives revenues Manages market revenue-PPA difference 30

PRICING STRUCTURE – Short-term Market Clearing Price Theoretically efficient for dispatch and encourages bidding at marginal cost, but has shortcomings Bidding prices/practices (and outages) for one plant can affect revenues suppliers receive for others Inflexible demand can cause price spikes Other thoughts Tradeoffs between accuracy and simplicity (80-20 rule) Negative prices needed for market solutions 31

MARKET MONITORING Clear market conduct rules & consequences Transparent & regularly reported metrics – how do you know the market is working well? Congestion/load pockets and MCP structure require additional monitoring Diverse monitoring staff is desirable, including personnel with actual market experience 32

ELEMENTS THAT WORKED (1) Open transmission access: Posted tariffs, operating/interconnection procedures, etc. Open stakeholder processes Standard, open decision-making process Decisions take longer, but all parties have a say, and hopefully the decisions are better 33

ELEMENTS THAT WORKED (2) Generator interconnection process reform Private investment & financing requires defined study processes & timelines Applications may increase greatly – consider cluster studies, diverse cost allocation, up-front upgrade funding Transparent transmission planning process Publicly available study plans & study results Stakeholder meetings & comment opportunities Recent institution of competitive construction 34

SMALL-CUSTOMER OPTIONS Significant transaction costs prevented mass- market penetration of third-party energy marketing to individual customers (a la Enron) Most consumer benefits via other means: Energy efficiency – appliance & building standards, audits/retrofits, and rebates/tax credits Community Choice Aggregation: “Opt-out” community- based energy procurement programs, usually offering higher renewable-energy service/options “Behind-the-meter” applications like rooftop solar (highly subsidized) 35

“UNCONVENTIONAL” RESOURCES CAN HELP “Intermittent” resources can be predictable and dispatchable with the right data & forecasting tools Flexible demand can be a viable resource Can mitigate market power, lower peak supply costs Works best under same structure as new generation – long-term programs or contracts Is usually undervalued – credit not given for MCP reduction or infrastructure impacts 36

ARE “WE” BETTER OFF NOW? Difficult to know – there is no control group or objective standard. The market is more open, broader, and possibly more efficient – larger operational areas, strong incentives to run plants efficiently, greater procurement planning/oversight There are more options available in the market Restructuring is probably not the only way to obtain these benefits (80-20 rule) 37

CHALLENGES AHEAD 38

SELECTED CHALLENGES AHEAD Integration of renewable resources Renewable Portfolio Standard: 33% of retail sales must come from specific renewables (wind, solar, geothermal, biomass, biodiesel, small hydro) by % & 50% RPS under consideration Flexible RA requirement, new “ramping” product Storage valuation & deployment Now expensive but helps energy production follow load, and costs may decline over time 1,300 MW CPUC-mandated procurement Pumped-storage proposals 39

THE “TRANSITION” IS NEVER REALLY FINISHED New generation technologies New end-use technologies New societal/market objectives & tradeoffs “The only constant is change.” - Anonymous 40

Susan Schneider Founder & Principal of Phoenix Consulting, Inc. Former CAISO VP (at start-up) Former PG&E executive supervising retail electric & gas market restructuring Published newsletter on CAISO wholesale market issues for 10 years Advises generation clients in interconnection process, PPA negotiations, CAISO stakeholder processes 41