Eastern Africa Power Pool (EAPP)

Slides:



Advertisements
Similar presentations
EUEI Partnership Dialogue Facility ACP-EU Energy Facility Energy Governance Support Brussels, 4 November 2009 Ray Holland, EUEI PDF.
Advertisements

WHO STRATEGY FOR WORKING WITH COUNTRIES:REGIONAL AND COUNTRY PERSPECTIVE TECHNICAL BRIEFING SEMINAR,Geneva,19-23 September 2005 Dr. Jean-Marie TRAPSIDA.
AFRICAN COMPETITIVENESS:A FOCUS ON INFRASTRUCTURE AFRICAN DEVELOPMENT BANK SYMPOSIUM ON MONITORING AND EVALUATION IDENTIFYING INDICATORS FOR MONITORING.
AFD support to geothermal development
THE ROLE OF AUC IN DEVELOPMENT OF GEOTHERMAL ENERGY IN EAST AFRICAN COUNTRIES Regional Geothermal Working Group Meeting September 2011, Kampala,
BI Marketing Analyst input into report marketing Report TitleElectricity in Zambia Report Subtitle Country profile of power sector, market trends and investment.
Regional Energy Markets Assistance Program Kazakhstan November 8-11, 2010.
Doing More With Less: Mitigation in a Changing Environment Experience in the Nile Basin Larry Brazil Riverside Technology, inc. Doing.
Infrastructure Investment Outlook
SOUTHERN AFRICAN POWER POOL 1 BRIEF ON SAPP POWER PROJECTS by Eng. Musara Beta Chief Market Analyst SAPP Coordination Centre Zimbabwe Mining Indaba, Harare,
Southern African Power Pool
SOUTHERN AFRICAN POWER POOL SAPP REPORT TO 5 TH COORDINATION MEETING OF POWER POOLS IN AFRICA Harare, ZIMBABWE 6-7 May 2010.
Central Africa Power Pool (CAPP)
LIBYA OIL In AFRICA.
For more information visit:
Promoting Energy Efficiency In Buildings in Developing countries.
MINI PROJECT Mission 2017 September 30, 2013 The Grand Ethiopian Renaissance Dam ( formally known as Millenium Dam and Hidase Dam)
Draft Energy Policy for Nairobi City County An Initiative of UN-Habitat in Collaboration with Nairobi City County Rose Muema Chief Officer, Urban Planning.
F. Matambalya / Cotton Marketing1 State of Play of the EAC-EU EPA Negotiations By Prof. Francis Matambalya University of Dar es Salaam
EASTERN AND SOUTHERN AFRICA
Overview of the SAPP and the Energy Network in Southern Africa
INITIATIVES ON MEASURING GOVERNANCE, PEACE AND SECURITY STATISTICS May 2012 Nairobi, Kenya.
COMELEC SESSION 3: OVERVIEW.
FY Preliminary AssessmentQuick Wins by 2015 National Sector Strategy ● Need the mid- to long-term Power M/P based on demand forecast.
Opportunities to Invest (Infrastructure)
Major information Basin area: 3.1 million km2, including 81,500 Basin area: 3.1 million km2, including 81,500 km2 of lakes and 70,000 km2 of swamps Basin.
The Nile Equatorial Lakes Subsidiary Action Program (NELSAP) A New Approach to the Joint Management of River Basins in the NEL Region.
The River Nile By Adam and Jack.F.
Nile Basin Conflict And Its Commercial Impact Mahmoud ElMassry Tarek El Rayes Ahmed Abd Tawab Dalya Nayal.
World Bank Water Week – 2004 Jerson Kelman. Hydroelectric power accounts for more than 90% of the total electric energy produced in Brazil.
Kenya: an opportunity Jeff Gable UK/ Kenya Trade & Investment Forum 3 rd December 2013.
BY PROF. BEN KIREGYERA CHAIRMAN, UBOS 5 OCTOBER 2001 BY PROF. BEN KIREGYERA CHAIRMAN, UBOS 5 OCTOBER 2001 A REPORT OF THE PARIS21 WORKSHOP FOR EAST AFRICA.
The 5th Coordination Meeting of the African Regional Power Pools Harare, Zimbabwe: 6-7 May, African Energy Commission (AFREC) AFREC Presentation.
EPAs and regional integration – what future for SADC and COMESA? TIPS Workshop, Pretoria 4-5 March Dr Mareike Meyn.
INTERFACE BETWEEN COMPETITION LAW AND SECTOR REGULATION (A BRIEF ON EXPERIENCE OF THE COMESA REGION ) George K. Lipimile Director & Chief Executive Officer.
Economic Commission for Africa (ECA) Sub-Regional Office for Eastern Africa Energy Planning and Capacity Needs in Eastern Africa.
DCA Structure Secretary-General InternationalCommunicationNational Secretariat.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Biofuels at the level of the Common Market for Eastern and Southern Africa (COMESA) Presented to First High Level Biofuels Seminar in Africa Addis Ababa,
TANZANIA ELECTRIC SUPPLY COMPANY LIMITED
EASTERN AFRICA POWER POOL EAPP 5 th Coordination Meeting Of African Regional Power Pools 6 th – 7 th May 2010 Harare, Zimbabwe.
Doing Business in Africa African Development Bank Group AfDB International Economic Forum of the Americas ( June 7-10, 2010) Nkosana Moyo, Vice President.
Presented by: Dr Sam G. Kanyarukiga CAADP Coordinator -COMESA Presented by: Dr Sam G. Kanyarukiga CAADP Coordinator -COMESA
Consortium for Barcode of Life (CBOL) Eastern Africa Conference, Nairobi, Kenya, October 2006 EAFRINET LOOP as a CBOL Partner in the Eastern Africa.
1 West African Power Pool (WAPP). 2 West African Power Pool Members SBEE (Benin) SONABEL (Burkina Faso) SOGEPE (Côte d’Ivoire) SOPIE (Côte d’Ivoire) NAWEC.
2nd February 2007CHF best practice WS, Golden Tulip Hotel, DSM0 CHF best practices workshop The CHeFA-East Africa Network Sr. Rita Toutant, TNCHF, CHeFA.
KETRACO’S PRESENTATION TO WEPEX PRESS CONFRERENCE By MR. RAPHAEL MWORIA On 19TH OCTOBER 2015 – FAIRMONT NILE- CAIRO.
The Southern African Power Pool
Trends of Selected Agriculture & Rural Development Indicators in the COMESA Region By Joseph Karugia and Stella Massawe ReSAKSS Africa-wide conference,
SOUTHERN AFRICAN POWER POOL PPP Power Projects in Southern Africa
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
SEMINAR ON ENERGY: ELECTRICITY TRANSMISSION A presentation to the KENYA – SPAIN MULTILATERAL PARTNERSHIP MEETING By Dr. (Eng.) John M. Mativo Chief Manager.
An Overview of Energy Sector Activities in EAC Dr. Nyamajeje Calleb Weggoro Director Productive & Social Sectors June 8, 2009.
Youssef Arfaoui Youssef Arfaoui Danida development Days June 2009 Developing the Energy Sector in Africa Private Sector involvement.
Dr. Nyamajeje C. Weggoro Director, Productive and Social Sectors EAC Secretariat THE DAR ES SALAAM-TANGA- MOMBASA NATURAL GAS PIPELINE AND EAST AFRICAN.
AFRICAN DEVELOPMENT BANK KENYA- SPAIN Multilateral Partnership Meeting Nairobi, 9 December 2013.
Renewable Energy Resource Assessment and Planning Tijana Radojičić IRENA – Country Support and Partnerships Dar es Salaam, 9 March 2016.
UbuntuNet Alliance Updates Implementation Updates, CORENA Phase 2 FEAST meeting - Brussels F F Tusubira, CEO -
Resettlement Submissions / Total Refugee Population
Agenda The Food Crisis Situation in East Africa
Ethiopian Renewable Energy Sector Development program
PIDA Rolling-Out the PAP
THE REPUBLIC OF MALAWI MALAWI PRESENTATION AT
Electricity Sector in Egypt.
Regional Agriculture Trade-Their Challenges and Opportunities
Highlights of the Ethiopian Energy Sector
Report to the UPDEA 39th General Assembly
Trade Facilitation and its Contribution to Food Security
Inter-University Council for East Africa (IUCEA)
INCREASING INVESTMENTS IN AFLATOXIN CONTROL THROUGH CAADP
Presentation transcript:

Eastern Africa Power Pool (EAPP) SESSION 3: OVERVIEW

Content of the overview Power members Key activities undertaken so far Key activities planned Specific projects

Power Pool Members Burundi, DRC, Total actual population: 310 Mio Egypt, Ethiopia, Kenya, Rwanda and Sudan. Total actual population: 310 Mio

Power Pool Overview (I) Pool set up in February 24th, 2005; EAPP is special institution of COMESA for electrical Energy Main objective: To make available for the Eastern Africa Region an affordable and reliable electricity, by pooling together all available electrical energy resources in the Region in an optimised and coordinated manner, in order to increase the access rate to electricity by the population of the Region and thereby promote regional integration; Key activities undertaken so far: EAPP Strategic Plan: financing pledged by EC-Energy Facility; EC-appraisal mission completed in November 2006; Capacity building: financing pledged by EC-Energy Facility and by AfDB; EC and AfDB-appraisal missions completed in November 2006; EAPP Master Plan: financing pledged by AfDB; AfDB-appraisal mission completed in November 2006; Data base and power market rules: financing pledged by EC-Energy Facility; EC-appraisal mission completed in November 2006;

Power Pool Overview (II) Next key activities planned: Lessos (Kenya) to Jinja (Uganda) transmission project: duplication of the existing 132 kV line with a parallel 230 km and 230 kV line;FS expected to complete in the second quarter of 2007; Mbara (Uganda) to Kigali (Rwanda) transmission project: 135 km and 220kV line; FS expected to complete in the second quarter of 2007; Ethiopia-Kenya Interconnection:1200 km and 400 kV line; FS will start in the second Quarter of 2007; Rwanda-Burundi interconnection: 109 km and 132 kV line; FS expected to complete in the second quarter of 2007; Ethiopia-Sudan-Egypt Interconnection: FS expected to complete in the 1st quarter of 2007; Zambia-Tanzania-Kenya interconnection: 250 km of 220 kV and 670 km of 330 kV; FS completed; Agreements-Negotiations between countries still ongoing; Rusizi III Power Plant: 82 MW-200MW hydro between Rwanda and DRC; PFS completed; Gil Gilbe III Power Plant: 870 MW hydro (Ethiopia); Construction ongoing; EPC-Contract;

Upcoming Key Projects in Pool Area (I) Nr. Project name Country (ies) Type(1) Est. cost ($M) Est. Readiness 1 Lssos (Kenya) to Jinja (Uganda) transmission project with 230 km and 230 kV line. KENYA UGANDA TRANS ? FS expected to complete in the 2nd quarter of 2007. 2 Mbara (Uganda) to Kigali (Rwanda) transmission Project 135 km and 220 kV line. UGANDA RWANDA TRANS ? FS expected to complete in the 2nd quarter of 2007. 3 Ethiopia-Kenya Interconnection:1200 km and 400 kV line ETHIOPIA KENYA TRANS ? FS expected to complete in the 2nd quarter of 2007. 4 Rwanda-Burundi interconnection: 109 km and 132 kV line RWANDA BURUNDI TRANS ? FS expected to complete in the 2nd quarter of 2007. (1) Key: REHAB: rehabilitation and expansion project – HYD GEN: hydropower plant – GAS GEN: gas-fired generation project DIV GEN: other type of power plant – TRANS: transmission project – DIST: distribution project – OTHER: other type

Upcoming Key Projects in Pool Area (II) Nr. Project name Country (ies) Type(1) Est. cost ($M) Est. Readiness 5 Ethiopia-Sudan-Egypt Interconnection: ETHIOPIA SUDAN EGYPT TRANS ? FS expected to complete in the 1st quarter of 2007 6 Zambia-Tanzania-Kenya interconnection ZAMBIA TANZANIA KENYA TRANS ? Negotiations between countries still ongoing. 7 Up grading of the existing 110 kV aand 70 kV transmission systems between Rwanda, Burundi and East DRC BURUNDI RWANDA DR CONGO TRANS ? FS expected to complete in the 2nd quarter of 2007. 8 Rusizi III Power Plant: 82 MW hydro between Rwanda and DRC; PFS completed BURUNDI RWANDA DR CONGO TRANS ? PFS completed; financing of the FS required (1) Key: REHAB: rehabilitation and expansion project – HYD GEN: hydropower plant – GAS GEN: gas-fired generation project DIV GEN: other type of power plant – TRANS: transmission project – DIST: distribution project – OTHER: other type