1 What is tube ‘n lube? How can it help our hose manufacturing? Presentation by RELEASE COATINGS OF NEW YORK 125 South Brooklyn Avenue Wellsville, New.

Slides:



Advertisements
Similar presentations
Product Overview. Diaphragm Pumps – Basic Features Self-Priming Abrasives/Slurries High Viscosity Fluids No Electric Motor Run Dry Capability Variable.
Advertisements

Unit C: Agricultural Power Systems
AUTOMOTIVE COOLING SYSTEMS
Pneumatic Cylinders Chapter 3.
Pneumatic Principles.
CM-22 Magnet Issues, 6 June MICE Magnet Cool Down and Other Issues Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
Sectional Assembly and Installation
Automotive A/C systems
VOC Emissions Reduction from Photolithographic Processes
Service Tips April COOLING SYSTEM To check and/or fill the cooling system it is necessary to remove the rear fender, the fuel tank (photo 1) and.
Understanding Extrusion Chapters 2 and 3
Flammable and Combustible Liquids
Let’s watch a DVD… DVD Instructor Notes
Landstown High School Governors STEM & Technology Academy
Corning Cabelcon 1. 2 To begin with – we need some tools… Cable cutter Cabelcon Rotary Stripper Mounting tool Compression tool Please read the instructions.
Engineer Training UV Lamp Head TJ8300 / TJ8500 UV Lamp Head.
HOUSEHOLD HAZARDOUS WASTE (HHW) Volunteer Safety Awareness
A How To on choosing the correct filter for your needs.
Dept. of Chemistry, SCSVMV University
HT Series – High Temperature Technology 1 INTERPUMP GROUPS NEW PUMP LINE FOR CAR WASH AND INDUSTRIAL APPLICATIONS UP TO 85°C (185° F)
BeginningNext SlideBack End Program AVADAL 1 of 21 SK-1 Roller Apron Segment Overview.
Engine Cooling And Lubrication
P R E S E N T.  We appreciate the opportunity to introduce you to our water based, (not petroleum or acid based), chemicals that dissolve the paraffin.
Complete Quiz You have 10 minutes to complete the quiz The Quiz is Open-Book (use it) Get help from your neighbor.
CLAY BRICKS.
Safe Use and Operation of Vacuum Lines
Yamaha oil pump rebuild
0 HIGHLY CONFIDENTIAL UV Handling & Safety Seminar.
Bellow valve (trap&pump) Inside glove box. (Note: Ar glove box is not necessary, if you work with single crystalline organic materials like rubrene that.
DISTILLATION Imelyn will show you how to set up for distillation. Scroll down.
Plastic Process AS Graphics.
SHAPING PROCESSES FOR PLASTICS Chapter 13- Part 2 Injection Molding
C. Grozis Production Of NOvA PVC Extrusions WBS 2.4 June 5, 2007 Chuck Grozis.
Blow Molding.
Unit 204: Common plumbing processes
Safe Facilities and Equipment
The Cooling System.
P H S A U T O M I V E ALS Lubrication.
Optimizing your handpiece life! By The Dentist’s Choice.
INTRODUCTION Definition:
Cell Culture Stirrer for YSI Design overview: past and present New features Manufacturability improvements.
Automotive Algebra Maintaining the cooling system Using Algebra for a simple solution Joe Agruso,Xochitl Molina.
Manufacturing Processes
Cleaning & Sanitizing for Food Plants. 22 Dec 07Effective Cleaning2 Introduction All equipment must be cleaned and sanitized prior to use and following.
1 Automotive Service & Repair Compounds R. Bortignon.
COOLING SYSTEM IN IC ENGINES
Chapter 15 Extrusion and Drawing of Metals. Topics Introduction The Extrusion Process Extrusion Practice Hot Extrusion Cold Extrusion Impact Extrusion.
Processing & Converting of Plastic Polymers
Manufacturing Plastics
Hydraulic System Components
Automotive Engines Theory and Servicing
Automotive Heating And Air Conditioning
Under floor heating Designing underfloor heating (UFH) system must always comply with the system suppliers instructions.
Welcome To Astec Paints Paint With Pride
Lubrication of Circuit Breaker Mechanisms
Mould Maintenance Presented By S.K Mandal.
14 Refrigerant Recovery, Recycling, and Recharging.
SoluTube® THE PREFERED SURFACTANT DELIVERY METHOD
Customer Presentation
Why do we study manufacturing?
Chapter VI, Digital Storage: Lesson II Disc Manufacturing
Food-Tek Synfood EP2 A food grade, synthetic, tacky, water resistant, high temperature grease for food, beverage, pharmaceutical and other clean industries.
Scotsman Ice Systems Essential Ice New Ice Maker Series
Cold Process Soap, Lip Balms, Lotion Bars & Salves
Gasket Fabricators Association Technical Committee Presentation
TRENTON Casing Filler Presentation
SHAPING PROCESSES FOR PLASTICS
Cold Process Soap, Lip Balms, Lotion Bars & Salves
Presentation transcript:

1 What is tube ‘n lube? How can it help our hose manufacturing? Presentation by RELEASE COATINGS OF NEW YORK 125 South Brooklyn Avenue Wellsville, New York Wellsville, New York 14895

2 DEFINITION Tube and Lube is a process designed to increase productivity, reduce cost, and ease operations for the rigid curved hose manufacturing.

3 HOW DOES IT WORK? This process gives you the ability to add the lubricant for formed hose directly into the hose as the hose is being extruded. Lube is applied at room temperature (no heat required). As the lube enters the dye goes through the pin it begins to form a gel where it attaches itself to the inside of the tube wall. After going through a cooling bath the lubricant sets up in a soft paste film. The green or uncured hoses can be cut to the designated length and stored in inventory until that hose part needs to be formed. The Lubricant will not soften and run out of the hose if exposed to humidity.

4 WHAT DO WE NEED TO INCORPORATE TUBE AND LUBE INTO OUR PROCESSES? I. Engineering this process: One of the wonderful benefits of Tube ‘n Lube is how easy it is to modify your existing process. A simple modification to the extruder die, use of proper lubricant and a ram & pump assembly is all you need. On the next two slides are diagrams of a typical modified extruder die. Then starting on slide #7 is a simple ram & pump assembly recommendation.

5 Breaker Plate Mandrel Lube Port Air Input Lube Port INTERRUPTION OF FLOW LINES BY SPIDER MANDREL SPIDER SCREW ADJUSTMENT

6 Spider Screw Adjustment An modification of a simple screw adjustment can altered the typical spider extrusion die. This task can be performed on a new die or an older die can be modified. 100 mm.20 mm 20 mm. 3 mm 2 mm Lube Air CAP SCREWS INTO HEAD OF DIE

7 The Pump The proper pumping of the lubricant into the extruder die is essential to achieve optimal results. As a rule of thumb, Release Coatings recommends applying 2 grams of lubricant per every 6 square inch of hose. The better the application ~ the better the results. A. Single Post Ram B. Basic Pump C. Follower Plate

8 Ram and Pump Assembly The Ram/Pump Assembly shown is an IR ARO® NP 322R01-1 & NP 322R02-1* Models for 5 gallon pails, models are also available for 55 gallon drums. Models for 5 gallon pails, models are also available for 55 gallon drums. *DISCLAIMER: Release Coatings of New York has no affiliation with IR. Other pumps are available that will sufficiently meet the requirement. This is only a recommendation.

9 Benefits to this type of Assembly ARO systems are totally enclosed, sealing the material from air and moisture. ARO systems are totally enclosed, sealing the material from air and moisture. This system prevents premature cure-out of the material during use. This system prevents premature cure-out of the material during use. Allows for continuous or intermittent use of the system and reduces the need for daily system clean up. Allows for continuous or intermittent use of the system and reduces the need for daily system clean up. The built-in lift capability allows for quick drum change over and easy lifting of pump assembly from the container. The built-in lift capability allows for quick drum change over and easy lifting of pump assembly from the container.

10 II. Just add the lube ~ A. The proper lubricant for your applicant is essential. The necessary criteria are that: necessary criteria are that: 1. It must use the existing heat from the extrusion process to flow easily into the hose. 2. The lube must have a very rapid set point. This is the point in which it solidifies and the flow process ends. 3. It must have excellent release or lubricant properties and be compatible with a variety of compounds. Continued

11 II. Just add the lube ~ (Continued) 4. It must not cause any build-up on the mandrel or other parts. 5. It must wash off of the hoses after curing without any residual residue. 6. It must be environmentally safe for workers and water treatment facilities. That’s a lot of “it musts”, but where do we find a lube that will do “all that……..” that will do “all that……..”

12 Presenting RELEASE COATINGS TM-919-N Series of Lubricants DESCRIPTION TM-919N Series are a water-soluble release coating for formed rubber hose. These viscous paste formulation are based on polyol ethers. Applied to the hose tube at the time of extrusion, TM-919N Series are currently being used as a curved mandrel release for formed hose lined with both peroxide and sulfur cured EPDM, CPE (CM), NBR, Vamac®, FKM and silicone rubber compounds.FEATURES Reduces build-up on surface of the curved mandrel (pin) with both peroxide and sulfur cure systems. Easy to wash from the curved mandrel; warm water without soap is sufficient. Environmentally safe, water-based product. Resistant to thermal and oxidative degradation. Unique inhibitor package for peroxide and sulfur cure systems. Continued

13 RELEASE COATINGS TM-919-N Series of Lubricants Continued BENEFITS TM-919N Series does not contain silicone oils. Excellent water solubility. Excellent lubricating and anti-stick properties. Nonflammable. May be recovered in an aqueous recycling system.APPLICATION TM-919N Products are used undiluted ("as is"). TM-919N Series Products are usually applied to the inside of the green rubber hose at extrusion with either a grease pump or pressurized pot through a port in the spider ("tube and lube" application).

14 Take a look at the hoses STRIPS OF LUBRICANT INSIDE OF HOSE

15 Take a look at your processes… Is the Tube and Lube Process right for your hose manufacturing process? For More Information Contact: RELEASE COATINGS OF NEW YORK 125 South Brooklyn Avenue Wellsville, NY US Phone * Int’l Phone* US Fax * Int’l Fax* * website