1 Analysis of NGMN Requirements REQ 1: Quality and Quantity of Alarms.

Slides:



Advertisements
Similar presentations
HUAWEI TECHNOLOGIES CO., LTD. :32-35pt : R153 G0 B0 : FrutigerNext LT Medium : Arial :30-32pt : R153 G0 B0 : :20-22pt (2-5 ) :18pt : FrutigerNext LT Regular.
Advertisements

Huawei Devices Presentation
3 Part Shaded Triangle 20 Point Text 20 Point Text up to 3 lines long here 20 Point Text up to 3 lines long here too as you can see.
The 4 T’s of Test Automation:
1 The design of presentation slides Stephen Bostock.
Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners.
HUAWEI TECHNOLOGIES CO., LTD. Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers.
Week 2 The Object-Oriented Approach to Requirements
Towards Software Defined ICN based Edge Cloud Services
Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners.
[Organisation’s Title] Environmental Management System
PaceSetter in HMRC Competitive Dialogue Procurement Invitation to Participate in Dialogue Supplier Outline Solution Template NB: This is intended only.
Screen 1 of 20 Reporting Food Security Information Reporting for Results Learning Objectives At the end of this lesson you will be able to: understand.
Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners : Arial Copyright©2011.
1 Analysis of NGMN Requirements REQ 4: LTE Automatic Neighbor Relation (ANR) and Self Organizing Networks (SON) Operation.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Slide title :32-35pt Color: R153 G0 B0 Corporate Font : FrutigerNext LT Medium Font to be used by customers.
1 Analysis of NGMN Requirements REQ 9: LTE Parameter Optimization.
Requirements Engineering n Elicit requirements from customer  Information and control needs, product function and behavior, overall product performance,
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Ericsson satsning på Public Safety - National Security HIØ Personalseminar – 9. mai 06 - Ed.
1 Analysis of NGMN Requirements REQ 6: Substitution of Monitoring Probes by Infrastructure Inherent Trace Functionality.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Proactive fault management in mobile core network Niko Isotalo Instructor: Ira Antikainen Supervisor:
Honeywell Guidelines for PowerPoint
Overall Design Standards
1 Analysis of NGMN Requirements REQ 2: Automatic Software Management.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Security Level: Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext.
Insights into Future Video Codec Huawei Technologies
1 Analysis of NGMN Requirements REQ 3: Energy Saving.
HUAWEI TECHNOLOGIES CO., LTD. Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers.
Information Services, Griffith University Problem Management Implementation Service Desk Project Phase 2 Project
1 Analysis of NGMN Requirements REQ 10: Automatic Inventory.
1 Analysis of NGMN Requirements REQ 5: Performance Management in Real-time.
Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners.
Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners.
2  Presentation Guidelines  Q & A Agenda KPI Partners Slide Template 3.
Slide title :32-35pt Color: R153 G0 B0 Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners : Arial Slide text :20-22pt Bullets.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font.
HUAWEI TECHNOLOGIES CO., LTD. Public document Security Level: Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Security Level: Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext.
HUAWEI TECHNOLOGIES CO., LTD. Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Security Level: Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext.
HUAWEI TECHNOLOGIES CO., LTD. Slide title :32-35pt Color: R153 G0 B0 Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners.
1 Analysis of NGMN Requirements REQ 7: eNodeB Plug & Play Self Commissioning.
HUAWEI TECHNOLOGIES CO., LTD. Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers.
HUAWEI TECHNOLOGIES CO., LTD. Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to.
HUAWEI TECHNOLOGIES CO., LTD. Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers.
Objectives Understand Corrective, Perfective and Preventive maintenance Discuss the general concepts of software configuration management.
Content Page Title 35-40pt Color: R153 G0 B0 Corporate Font: FrutigerNext LT Medium Font to be used by customers and partners: Arial Content Page Text.
Security Level: HUAWEI TECHNOLOGIES CO., LTD. Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT.
Security Level: Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt RTSP draft-ietf-mmusic-rfc2396bis-10 Magnus Westerlund Co-auhtors: Henning Schulzrinne, Rob Lanphier,
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Improvement of Software Delivery Process in the Telecommunications Industry Xian Sun
Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners.
Slide title :32-35pt Color: R153 G0 B0 Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners : Arial Slide text :20-22pt Bullets.
1 Huawei Mass Transit eLTE Multi-Service and Unified Bearer Solution provides broadband, secure, and reliable train-to-ground communication in high-speed.
HUAWEI TECHNOLOGIES CO., LTD.Huawei Confidential Page 1 Slide title :32-35pt Color: R153 G0 B0 Corporate Font : FrutigerNext LT Medium Font to be used.
Константин Солопов, Руководитель направления UC&C IP Телефоны Huawei серии eSpace 7900.
Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners : Arial HUAWEI.
Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners : Arial
Formal Report Strategies. Types of Formal Reports Informational Presents Info Analytical Presents Info Analyses info and draws conclusions Recommendation.
Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners : Arial Copyright©2012.
Security Level: Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers.
Security Level: Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers.
Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners : Arial HUAWEI.
HUAWEI TECHNOLOGIES CO., LTD. Author/ Zhuo Feng / Version: V2.0( )
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Security Level: 英文标题 :40-47pt 副标题 :26-30pt 字体颜色 : 反白 内部使用字体 : FrutigerNext LT Medium 外部使用字体.
Fairchild Semiconductor PowerPoint Best Practices
Template Guidelines: Keep the title and important information (who, what, when, where) in large font (32 pt. or larger) Add a picture to grab viewer interest.
Presentation transcript:

1 Analysis of NGMN Requirements REQ 1: Quality and Quantity of Alarms

Slide title :32-35pt Color: R153 G0 B0 Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners : Arial Slide text :20-22pt Bullets level 2-5: 18pt Color:Black Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners : Arial Top right corner for field-mark, customer or partner logotypes The following nine groups of colors are an example of how our design colors can be used, please take note that you should only use one design color group per slide. For specific usage details, refer to the “Typesetting Standard”. 2 Specifications Related 3GPP SA5 specifications Alarm IRP: TS , , , , Advanced Alarm Management (AAM) IRP: 32.12x Current Status of the specifications Specifications have been in place in 3GPP. These have been used by operators for a long time for 2G and 3G and are expected to use it for 4G.

Slide title :32-35pt Color: R153 G0 B0 Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners : Arial Slide text :20-22pt Bullets level 2-5: 18pt Color:Black Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners : Arial Top right corner for field-mark, customer or partner logotypes The following nine groups of colors are an example of how our design colors can be used, please take note that you should only use one design color group per slide. For specific usage details, refer to the “Typesetting Standard”. 3 Quality and Quantity of Alarms RequirementsExisting 3GPP Standards Status Overall alarming concept The supplier and their R&D departments are the owner of the detailed system know-how and are responsible for the overall alarming concept. Today the supplier’s development departments for network elements and OSS are working often autonomously in that area. The basis to design an overall alarm concept needs to be established between the different vendor’s product lines before the start of development phase. Concept not a requirement Alarm quantity Only alarms that fulfill the quality requirements and which have an additional benefit to solve abnormal conditions should be forwarded by the NE. Meaningless events must be avoided This should be always the requirement. It is a requirement on the NE and the EMS. Out of Scope of this requirement. Nevertheless on the principle aspect of “Alarm Quantity”, the 32.12x (AAM IRP) providing some related capabilities on this topic.

Slide title :32-35pt Color: R153 G0 B0 Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners : Arial Slide text :20-22pt Bullets level 2-5: 18pt Color:Black Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners : Arial Top right corner for field-mark, customer or partner logotypes The following nine groups of colors are an example of how our design colors can be used, please take note that you should only use one design color group per slide. For specific usage details, refer to the “Typesetting Standard”. 4 Quality and Quantity of Alarms RequirementsExisting 3GPP Standards Status Alarm correlation To fulfill the quality requirements and to reduce the event number correlation must be implemented on all levels (network element & element manager). Correlation rules which cover the whole product including all composed components must be part of the product solution and should not be project specific. FM agents on NE level (e.g. IT-systems) should be used to reduce the number of unwanted events. NE and EMS have to support correlation. Requirement are already defined in the Alarm IRP, but the product may take it as far as they want to. So there may be a need to study and refine this further. Number of alarms In general per incident there should not be more than 10 alarms on the instance which caused the failure. Alarm floods of instances which did not cause the failure need to be blocked in any case. EMSs should have built in control for alarm flood. Iterators can be used to control the alarms sent. In addition AAM IRP may be considered as well.

Slide title :32-35pt Color: R153 G0 B0 Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners : Arial Slide text :20-22pt Bullets level 2-5: 18pt Color:Black Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners : Arial Top right corner for field-mark, customer or partner logotypes The following nine groups of colors are an example of how our design colors can be used, please take note that you should only use one design color group per slide. For specific usage details, refer to the “Typesetting Standard”. 5 Quality and Quantity of Alarms RequirementsExisting 3GPP Standards Status Focus on customer and service impact In incident situations the following question need to be answered by the system alarms, without the need for any additional optional tooling: “What does this incident mean for the customer and the service at all?” Focus on the NE level. Prioritization of alarms Criteria for Critical alarms: Total disturbance of the system or significant service impact for customers Performance, capacity, throughput restrictions Accounting disturbed Criteria for Major alarms: Outage of a redundant component (e.g. outage of a redundant power supply) Introduction of retaliatory actions required, to ensure the service availability Alarm Severity defined in Alarm IRP follows the ITU-T alarm severity.

Slide title :32-35pt Color: R153 G0 B0 Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners : Arial Slide text :20-22pt Bullets level 2-5: 18pt Color:Black Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners : Arial Top right corner for field-mark, customer or partner logotypes The following nine groups of colors are an example of how our design colors can be used, please take note that you should only use one design color group per slide. For specific usage details, refer to the “Typesetting Standard”. 6 Quality and Quantity of Alarms RequirementsExisting 3GPP Standards Status Alarm maintenance manuals Alarm maintenance manuals must contain a clear repair action for the dedicated malfunction. Wherever possible event-based automated repair actions to solve standard error situations without manual interaction should be implemented, if not already implemented on the Network Element level. This is a documentation requirement. The intent here is to add repair action. When the alarm is raised in most cases the repair action may not be known. Additional text, additional info along with help files provide this information. Alarm text Alarm text should contain description of abnormal condition, probable cause, service impact, root cause and a clear short repair action or reference to online maintenance manual. Meaningless events have to be avoided. Additional text, additional info, specific problem, probable cause can be used to determine the root cause of the alarm. Maintenance manual are provided.