Federal Aviation Administration HEAT RELEASE RATE Updates 2014 June Materials Meeting Switzerland Materials Working Group Michael Burns, FAA Tech Center.

Slides:



Advertisements
Similar presentations
Residential Gas – Honeywell Valve - Thermopile Powered Series 300/301
Advertisements

Conduction Conceptests
Threads and Fasteners Thread Symbols.
Extrusion-Based Processes
Objective - Develop a test method that is: Representative of Actual Conditions Repeatable and Consistent Obtainable by All Labs in All Parts of the World.
HEAT FLUX GAUGE CALIBRATION UPDATE (CHAPTER HF DRAFT) 2014 June Materials Meeting Switzerland Materials Working Group Michael Burns, FAA Tech Center June,
Federal Aviation Administration Radiant Panel Updates 2014 June Materials Meeting Switzerland Materials Working Group Michael Burns, FAA Tech Center June,
International Aircraft Materials Fire Test Working Group Meeting
Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Meeting Test Results for Proposed Cargo.
Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Developing an In-flight Fire Condition.
Federal Aviation Administration Evacuation Slide Test Method: Round Robin 3 Results 0 Evacuation Slide Test Method: Comparison Test Results Federal Aviation.
Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Meeting Task Group Session on Revised.
Performance measurement
HVAC523 Soldering.
Lesson Working with Copper Tubing. Interest Approach n Why is copper tubing only used for water and fuel lines?
Installation. Indoor Unit Installation Typical Installation.
Click on this image to open the full PDF document.
Oxyacetylene Torches.
Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Meeting Task Group Session on Revised.
OSU & NBS March Materials Meeting
KSVAS LTD1 WORLD CONGRESS OF STERILIZATION COMBINED MEETING WFHSS / AIOS Small Steam Sterilizers BS EN 1360:2004.
1- Pipsqueak Engine Millwork on uprights and base.
Introduction: Standard Test Method for Density (unit weight), Yield, and Air Content (Gravimetric) of Concrete –Apparatus –Sample –Procedure ACI Certification.
3- Pipsqueak Piston and Cylinder. Work holding in the Lathe Collets have definite advantages over chucks in gripping work pieces in the lathe. They apply.
Installation. Indoor Unit Installation Typical Installation.
Seat Cushion Testing Methods Fire Test FAA Hand Book Regulation Lab A Lab F Lab B Lab G Lab C Lab D Lab E.
Federal Aviation Administration AVIATION HEAT FLUX CALIBRATION STANDARD 2013 Triennial International Fire & Cabin Safety Research Conference Philadelphia,
Federal Aviation Administration Revised Rate of Heat Release Test Method 2013 December Triennial Conference Philadelphia, PA USA Michael Burns, FAA Tech.
Federal Aviation Administration OSU & NBS Updates 2010 March Materials Meeting Boeing Facility - Renton, WA Materials Working Group Michael Burns, FAA.
AIR QUANTITY REQUIRED TO TRANSFER HEAT IN A FORCED AIR SYSTEM In all four mechanical systems considered, the transfer of heat, either by taking it out.
Kinetic Energy and Heat Transfer
Installation. Indoor Unit Installation Typical Installation.
International Aircraft Materials Fire Test Working Group Meeting
1 HVACR316 - Piping Soldering. 2 Soldering Copper Tubing The most common method of joining copper tubing in hydronic heating systems is soft soldering.
Types of Threaded Fasteners.  Used to hold parts together  Clearance holes in parts  Nut on other end  Can also be used with a threaded hole.
© 2011 Pearson Education, Inc. All Rights Reserved Automotive Technology, Fifth Edition James Halderman FASTENERS AND THREAD REPAIR 8.
Presented to: By: Date: Federal Aviation Administration In-Flight Burn- Through Tests Aluminum vs. composite materials Aircraft Systems Fire Working Grp.
Federal Aviation Administration HRR 2 Development Task Group 2011 March Materials Meeting Savannah, GA Materials Working Group Michael Burns, FAA Tech.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
Toulouse Aeronautical Test Centre (CEAT)
Fasteners and Thread Repair
Federal Aviation Administration OSU & NBS Updates 2009 March Materials Meeting Materials Working Group Michael Burns, FAA Tech Center March 4 th & 5 th,
Federal Aviation Administration OSU & NBS March Materials Meeting Materials Working Group Michael Burns, FAA Tech Center June 17 th & 18 th, 2008.
PF3W Series 3-Color Display Digital Flow Switch Planned release date: May 2012.
Federal Aviation Administration HEAT FLUX CALIBRATION STUDY 2010 March Materials Meeting Boeing Facility - Renton, WA Materials Working Group Michael Burns,
Fasteners and Thread Repair 08 Introduction to Automotive Service James Halderman Darrell Deeter © 2013 Pearson Higher Education, Inc. Pearson Prentice.
Federal Aviation Administration 0 Composite Wing Tank Flammability May 19 th, Composite and Aluminum Wing Tank Flammability Comparison Testing Steve.
Federal Aviation Administration 0 Composite Wing Tank Flammability May 20, Composite and Aluminum Wing Tank Flammability Comparison Testing Steve.
Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Meeting Task Group Session on Revised.
Federal Aviation Administration OSU & NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st &
Federal Aviation Administration 0 Composite Wing Tank Flammability May 11, Composite and Aluminum Wing Tank Flammability Comparison Testing Steve.
Federal Aviation Administration OSU & NBS Updates 2010 June Materials Meeting Koeln, Germany Materials Working Group Michael Burns, FAA Tech Center June.
Federal Aviation Administration OSU & NBS Updates 2009 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st &
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Meeting Test Cell Airflow Study For Cargo.
Air condition installation
Date of download: 9/17/2016 Copyright © ASME. All rights reserved. From: A Stepped-Bar Apparatus for Thermal Resistance Measurements J. Electron. Packag.
6832 –09 Oxy- Fuels Welding and Cutting.
FASTENERS AND THREAD REPAIR
Oxyacetylene Welding Processes
Fire Study in Multiple Compartments
T-6B On-Board Oxygen Generation System (OBOGS)
What is CONCRETE SLUMP TEST –
TRENTON Casing Filler Presentation
T-6B On-Board Oxygen Generation System (OBOGS)
Presentation transcript:

Federal Aviation Administration HEAT RELEASE RATE Updates 2014 June Materials Meeting Switzerland Materials Working Group Michael Burns, FAA Tech Center June, 2014

Federal Aviation Administration Heat Release Rate Test Apparatus June 2014 AGENDA  OSU Orifice Meter Discussion (Static Pressure Taps)  CHAPTER HR UPDATE (HR2) Combined Supplement with Test method

Federal Aviation Administration Heat Release Rate Test Apparatus June 2014 Protruding pressure taps (beyond the pipe inner wall) vs. surface pressure taps (flush with inner wall) may have a influence on pressure readings Could have an influence on total airflow OSU:

Federal Aviation Administration Heat Release Rate Test Apparatus June 2014 Supplemental material moved to Test Method as follows:  Added BTU/ft 2 *sec units  Environmental Chamber – Added Radiation Door Assembly Figure  Radiation Source Power Supply Capacity – 12 kVA is sufficient Diamond-Shaped Mask Mounting – ½ inch diameter machine screw (approximately 4 inches in length) Mask Position – Approximately 3 inches from the reflector plate Mask shaft-head or nut only on side facing specimen (no threads extending towards specimen) HR2: HEAT RELEASE TEST METHOD

Federal Aviation Administration Heat Release Rate Test Apparatus June 2014  Thermopile Wiring Color coding differences - Chromel yellow/green; Alumel red/white  Upper Pilot Burner Caution Statement – Do not disturb burner position once set Flame Profile – To increase orange tip, reduce air from the mixture  Drill hole sizes added for: Upper Pilot Burner (#59 Drill) Air Distribution Plate (# 4 Drill) Second Stage Plate (# 28 Drill)  Drip Pan - Foil can be used to line the drip pan to facilitate cleaning after use HR2: HEAT RELEASE TEST METHOD

Federal Aviation Administration Heat Release Rate Test Apparatus June 2014  Heat Flux Gauge (HFG) Cooling Water Tubing – Rigid due to the high temperatures Cleaning – Gently wipe with soft, water-dampened sponge Caution Statement – Damage done to the coating during the cleaning process will affect the measurement accuracy of the sensor  Specimen Preparation Added recommended specimen foil wrapping technique Foil trimming – no scoring or incisions permitted Spring Plate Pressure – Recommended applying equal pressure to specimens of equal thickness by inserting the specimen retaining rod in the same holes for each specimen tested HR2: HEAT RELEASE TEST METHOD

Federal Aviation Administration Heat Release Rate Test Apparatus June 2014  Heat Flux Calibration Procedure (Corner) Caution Statement – Do not disturb burner position when rotating calibration fixture 90 degrees Added options for improving 4-corner uniformity: Adjust power settings Reposition globars - Hottest to coolest (bottom to top) Move mask – Closer to or further from HFG Move globars – Adjustment left or right Reflector plate – Adjust slope (top and bottom)  Added Rounding, Accuracy and Units section HR2: HEAT RELEASE TEST METHOD

Federal Aviation Administration Heat Release Rate Test Apparatus June 2014  Calculation of Calibration Factor Kh – Added example assuming 60 mV baseline; 7 mV rise for each change in flow HR2: HEAT RELEASE TEST METHOD

Federal Aviation Administration Heat Release Rate Test Apparatus June 2014  Test Preparation Thermopile – Baseline mV observed daily as an indicator of developing problems Variations in heat flux (heat flux gauge malfunction) Defects in thermopile Air leakage – Environmental chamber/lower plenum, exhaust stack or holding chamber door seal  Test Performance The use of an externally positioned mirror may assist in viewing upper pilot flames during testing HR2: HEAT RELEASE TEST METHOD

Federal Aviation Administration Heat Release Rate Test Apparatus June 2014  Heat Release Rate – Added example for calculating HRR (Peak HRR) HR2: HEAT RELEASE TEST METHOD

Federal Aviation Administration Heat Release Rate Test Apparatus June 2014  Total Heat Release – Added example for calculating Total HR (2-Min. THR) HR2: HEAT RELEASE TEST METHOD

Federal Aviation Administration Heat Release Rate Test Apparatus June 2014  Test Report Laboratory Fully identify the material tested Graphically report the heat release rate (kW/m 2 ) as a function of time (in seconds) for each test Maximum heat release rate and time (in seconds) it occurs during each test Total heat released during the first 2 minutes of each test Radiant heat flux to the specimen HR2: HEAT RELEASE TEST METHOD

Federal Aviation Administration Heat Release Rate Test Apparatus June 2014  Test Report (Continued) Calibration factor Kh (kW/mV ) Average mV baseline for each specimen tested Melting, sagging, delaminating, or other behavior that affected the exposed surface area or mode of burning that occurred and the time(s) at which such behavior occurred Total number of materials tested Total number of materials passed HR2: HEAT RELEASE TEST METHOD

Federal Aviation Administration Heat Release Rate Test Apparatus June 2014  Requirements Quantity of Samples – Minimum of three samples must be tested and 80% or greater must pass HR2: HEAT RELEASE TEST METHOD

Federal Aviation Administration Heat Release Rate Test Apparatus June 2014 QUESTIONS? What is full of holes, but can still hold a lot of water? Answer: Sponge