August, 2009 ACARP project C18023 CM2010 – Continuous Miner automation Update.

Slides:



Advertisements
Similar presentations
6 August 2009 OOR Some Questions Todd Schneider. 6 August 2009 Ontology Driven Development What are the impacts of ontology driven development? Can the.
Advertisements

Mobile Capture and Reporting System (MCR)
© Copyright, 2009, S. Leigh Geiger & Associates, Inc. Using MsProject for Earned Value Calculations Advanced MsProject Course Dr. Leigh Geiger.
Roadway Development Operators’ Workshop ACARP project C18023 CM2010 – Continuous Miner automation Dr David Hainsworth Dr David C. Reid 3-6 March, 2009.
FAQ Frequent Asked Questions about PLM and PFS. Start.
TDPS Wireless v Enhancements E1 - Multi load E2 - Driver time scheduler.
Research Update Automated Bolting and Meshing Project - C17018.
Linenweb ® Laundry Information System Customer Internet Portal The New Customer Internet Portal Improves Customer Service:  Separate Log-in for each Laundry.
Back to Components High Capacity Underground Coal Mining (L15) A joint project (Scoping Study) between CSIRO Exploration & Mining and University.
ACARP KEY FINDINGS - DECEMBER 2006 BENCHMARKING STUDY Gary Gibson, ACARP.
ACARP Australian Roadway Development Improvement Project CM2010 IMPLEMENTATION STRATEGY August/September 2009 Guy Mitchell, BMA Coal Bob Miller, Centennial.
Presenter- Dan Carey August 11 and 12, 2009.
Phase Difference = Phase Difference = 0.05.
Highwall Mining. Presentation outline l Highwall mining systems l Geotechnical issues & rating l Guidance Control l Failures and causes l Conclusions.
1 times table 2 times table 3 times table 4 times table 5 times table
Auto-txt Locator Fleet Management| Tracking | Journey History | Stolen Vehicle Monitoring Excellence in Automotive Product Design.
ONLINE CLAIMS TRACKING
Research Update Automated Bolting and Meshing Project.
ROADWAY DEVELOPMENT IMPROVEMENT PROJECT
Company Profile ► Our Expertise Here at SIEMSTECH we have a passion for designing and implementing integrated, network-centric technology solutions across.
1 Peru Minerals Sector Update Trade and Investment Group London 30 January
ACARP Australian Roadway Development Improvement Project ROADWAY DEVELOPMENT OPERATORS’ WORKSHOPS March 2009.
This material is approved for public release. Distribution is limited by the Software Engineering Institute to attendees. Sponsored by the U.S. Department.
New Hanover County 2017 Revaluation Update Roger Kelley Tax Administrator Tax Administration September 14, 2015.
Display time for Project having around 25,000 entities of each type Display time for Project having around 25,000 entities of each type Table loading.
PARALYMPIC GAMES 29 August – 9 September. SPORTS IN THE PARALYMPICS.
FHWA Office of Operations Research and Development Executing the Vehicle-to-Infrastructure Research Program: Enabling Technology September 25, 2013 Deborah.
© 2007 Railinc. All rights reserved. Equipment Assets Management Working Committee.
Precision Agriculture Technologies for the Australian Nut Industries Presentation to the Australian Nut Industry Research Forum Brisbane, 21 st September.
Dr David C. Reid Dr Mark Dunn RDTG Operator’s Workshops Sept 2010 ACARP project C18023 CM2010 – Continuous Miner Automation.
Dave Alexander – August 2010 Developing a Sustainable Maintenance Strategy A Living Program ACARP Roadway Development Operators Workshop September 2010.
DEVELOPMENT AND APPLICATION OF VEHICLE GUIDANCE SYSTEMS FOR PRECISION AGRICULTURE.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
1 IntelliDrive SM Vehicle to Infrastructure Connectivity for Safety Applications Greg Davis FHWA Office of Safety RD&T U.S. Department of Transportation.
Smart Card based Location Tracking System By Saltriver Infosystems.
Performance Measures Used in the DFW Region – How to Track and Report the M & O Investment and Results AMPO Management and Operations Work Group September.
Tables Learning Support
ACARP Australian Roadway Development Improvement Project OPERATORS’ WORKSHOPS August 2008.
NUMI MINOS MINOS Far Detector Installation & Commissioning Jeff Nelson MNHEP DoE Visit September, 2002.
Visit:
GPS Vehicle Tracking System A Virtual Assistant to the Sales Team.
Kate Chow Carol Wilson, Lisa-Harvey Smith, Balt Indermuehle, and MWA The MRO, Australia’s radio-quiet site: enabling world-class radioastronomy CSIRO ASTRONOMY.
DBM 380 Week 3 DQ 1 Wang and Gong (2007) explain how database management systems (DBMS) and data mining can help a motor vehicle maintenance center improve.
AC AUTO ELECTRICAL ABOUT US At A C Auto Electrical & Mechanical we always try to remain ahead of any potential issue. To accomplish.
SmartTraxx Go & OverSight Updates
GSM+GPS Based School Kids Tracking System
MineDash 2.0 Using MineDash to Optimise your Operations Revision A
Ministry of Health Maputo Mozambique
Receive Data in Zurich, CZ
Godrej Prakriti Sodepur | Godrej Prakriti Kolkata
Table Amortized cost: $3 Insert 5 Actual cost: $1.
Hire Toyota Innova in Delhi for Outstation Tour
Times Tables.
Use of Gps Tracking Devices
Giftalove Best Cake Offers
Tracking new discoveries using file history
Children’s Hospital Update
Forest Management Planning Content or Process
Best Home Automation Company
Constellation New ideas: Impact: Schedule:
Standard Deduction Schedule L.
The Administration Console - Dashboards
Objectives Identify functions.
3 times tables.
6 times tables.
Modified at -
Sales operations Project support overview Presenter's Name
Visit us:
Arrivalist Seasonal Maps of Actual Visits
Complete Vehicle Systems.
Presentation transcript:

August, 2009 ACARP project C18023 CM2010 – Continuous Miner automation Update

Inertial navigation bench testing Benchmark testing of latest inertial navigation technology on a calibrated rotary table - complete

Inertial navigation test track testing Units under test on the CSIRO inertial test track - complete

Inertial navigation field testing Next phase inertial testing on modified (radio remote) Numbat skid-steer vehicle - scheduled for September

Process mapping and field characterisation Mine visits currently underway across15 mines in NSW and Queensland to review roadway development process models against actual operating models utilising a range of differing mining equipment and practices in a variety of mining conditions