The Energy Efficiency Commitment 2005-2008 - overall progress and emerging issues Charles Hargreaves 4 September 2007.

Slides:



Advertisements
Similar presentations
WAPECS - A more flexible spectrum management approach Isolde Goggin Chairperson of COMREG, Ireland, and RSPG Rapporteur on WAPECS.
Advertisements

TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Welcome to Who Wants to be a Millionaire
Slide 1 Insert your own content. Slide 2 Insert your own content.
Global Business Today 7e
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Achieving the MDGs: RBA Training Workshop Module 1: How to Meet the MDGs May 9-12, 2005.
Integrating the Three Pillars of Sustainable Development:
For APNOMS Managing Pervasive Computing and Ubiquitous Communications Challenges Ahead Graham Chen.
The Africa Action Plan An IEG Evaluation CSO Forum April 15, 2011.
Regional responses to the Europe 2020 Strategy with particular focus on energy efficiency – Hungarian case.
the European Union policy
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
A presentation to the Board of Education
1 R-2 Report: Read and write at the end of third grade Review of Progress and Approval of Targets A presentation to the Board by Vince.
You will need some paper!
0 - 0.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
ALGEBRAIC EXPRESSIONS
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING Think Distributive property backwards Work down, Show all steps ax + ay = a(x + y)
Teacher Name Class / Subject Date A:B: Write an answer here #1 Write your question Here C:D: Write an answer here.
Addition Facts
Transport for London Supplier Diversity Stonewall Presentation Clive Saunders Equality & Inclusion Delivery Manager Group Services.
Construction Fatalities (Workers, Jan 1981 to March 2007 )
Empty Box Problems Subtraction = 3 If you start on 6 and jump back 3 spaces you land on
Welcome to Who Wants to be a Millionaire
Welcome to Who Wants to be a Millionaire
Energy Efficiency Innovation Review (2005) Summary report: Summary report: pbr05_energy_675.pdf
Micro Focus Research 1 As far as youre aware, how does your organization plan to drive business growth over the next three years? (Respondents' first choices)
© 2005, Itron Inc. Residential Market Share Tracking Study Rachel Harcharik Itron, Inc Richard Pulliam, Project Manager Southern California Edison.
THE GREEN DEAL Alan Lupton. THE STORY SO FAR 1996 Introduction of the Home Energy Conservation Act (HECA) – local authorities to report annually on the.
SMART CITY SIBIU –PILOT PROJECT. CONTENT 1.SMART CITY, element of SMART GRIDS 2.City of SIBIU - Statistics 3.Optimising Energy Systems 4.Pilot Project.
The Growth of Grandview The Growth of Grandview VENABLES STREET FIRST AVENUE PARK/COMMERCIAL DRIVE.
O X Click on Number next to person for a question.
© S Haughton more than 3?
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
1 Directed Depth First Search Adjacency Lists A: F G B: A H C: A D D: C F E: C D G F: E: G: : H: B: I: H: F A B C G D E H I.
Twenty Questions Subject: Twenty Questions
Take from Ten First Subtraction Strategy -9 Click on a number below to go directly to that type of subtraction problems
Energy & Green Urbanism Markku Lappalainen Aalto University.
CERT: Priority Group Flexibility Option Emily Flatt Energy Efficiency Manager, Ofgem 4 th September 2007.
Evaluation of an intervention to increase online filing of individuals’ tax returns Peter Lumb September 2009.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Employment Ontario Program Updates EO Leadership Summit – May 13, 2013 Barb Simmons, MTCU.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
11 = This is the fact family. You say: 8+3=11 and 3+8=11
Week 1.
Let’s take a 15 minute break Please be back on time.
We will resume in: 25 Minutes.
1 Ke – Kitchen Elements Newport Ave. – Lot 13 Bethesda, MD.
Partial Products. Category 1 1 x 3-digit problems.
O X Click on Number next to person for a question.
Online  Trade shows  Magazines  Research (NASDAQ-GS: GSOL) Global Sources’ 2009Importer Survey.
CERT implementation Charles Hargreaves 11 December 2007.
Changes to the accreditation of measures between EEC2 and CERT Urszula Kulpinska 4 September 2007.
EEC3 – The Way Forward Presentation to NIA Annual Conference 12 December 2006 By Iris Rooney, Defra.
AIE Task Force Energy Services Wednesday 27 April 2011.
Certificate Trading for the UK’s Energy Efficiency Commitment John Costyn Ofgem.
Presentation to EU & ECEEE Expert Seminar on Measurement & Verification EU Proposed Directive on Energy Efficiency and Energy Services “The UK Energy Efficiency.
Presentation transcript:

The Energy Efficiency Commitment overall progress and emerging issues Charles Hargreaves 4 September 2007

2 Presentation outline The EEC2 target Supplier progress and activity Targeting the Priority Group Key issues moving forward

3 The Energy Efficiency Commitment Suppliers were set an overall target of 130 TWh At least 50% of which has to be met in the low income Priority Group Suppliers carried forward 35 TWh of energy savings from EEC1 into EEC2, just over half of which were in the Priority Group

4 Supplier progress Suppliers had made good progress towards meeting their targets by the end of the second year of the EEC2 Two suppliers had achieved enough energy savings to have complied with their obligations By the end of the second year year, suppliers had met nearly 95% of the overall target

5 Supplier progress

6 Activity to date Energy savings achieved to date have been dominated by the delivery of insulation measures However, large numbers of other measures have been promoted, including nearly 45 million low energy lamps Some suppliers have been innovative and have brought new products into the EEC

7 CFL delivery

8 Activity to the end of the second year of EEC2

9 Activity to the end of the second year, including carryover

10 Meeting the Priority Group target Suppliers are on track to meet at least half of their energy saving targets in the Priority Group However, in EEC2 so far, more of the activity has been targeted on the non-Priority Group Priority Group activity has been heavily dominated by the delivery of insulation measures

11 Energy savings achieved by consumer type

12 Innovative action Suppliers are promoting a range of innovative products These include: –Heating measures such as ground source pumps and small scale CHP –Consumer electronics such as integrated digital appliances –Very efficient cold appliances

13 Progress towards meeting the Priority Group target

14 Progress towards meeting the non-Priority Group target

15 Progress towards meeting the overall target

16 Key points Suppliers have made good progress towards meeting their targets including meeting at least 50% in the Priority Group At the end of the ninth quarter of EEC2, of the 130TWh target only 5 TWh is remaining Given current trends it seems all suppliers will have energy savings to carry forward to CERT

17