PILOT PROJECT FOR CAM HARMONISATION 16 th SG meeting Madrid 31 st May 2012.

Slides:



Advertisements
Similar presentations
Advanced Piloting Cruise Plot.
Advertisements

REQ Enrollment in Demand Response Programs Process Flow Engineering Firm Retail Customer Demand Response Service Provider (DRSP) Distribution Company.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
Allocation of Capacity in Portugal Under the New Regulation 24th IG meeting S-GRI, Madrid September 23, 2013.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
ZMQS ZMQS
Madrid, 13 th November th SG Meeting South Gas Regional Initiative.
VOORBLAD.
8 th IG-Meeting Coordinated Auctioning, Auction Office and Organisational Issues Christian Todem Vienna
15 November th SG meeting Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
1 DELAYED LAST STATE AID - BORROWING PROCESS
© 2012 National Heart Foundation of Australia. Slide 2.
15 th September 2013 Enagás and TIGF Information to NRAs.
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
CMP PROPOSAL FOR HARMONISATION 17 th IG meeting Madrid 2 nd November 2011.
2013 Auction between Spain and Portugal 23 rd IG meeting 19 th June 2013.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
15 th November th SG meeting 2013 VIP Auction Results.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Addition 1’s to 20.
25 seconds left…...
26 th IG meeting 23 th January 2014 Enagás, REN and TIGF Issues to be discussed.
15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative.
1 Madrid, 19 th November th IG Meeting South Gas Regional Initiative.
PILOT PROJECT ON CAM 17 th SG meeting Madrid 27 th September 2012.
1 Madrid, 27 th February st IG Meeting South Gas Regional Initiative.
Allocation of capacities between Portugal and Spain Madrid 30 th April 2013.
1 Madrid, 07 th February th SG Meeting South Gas Regional Initiative.
1 Madrid, 30 th April th SG Meeting South Gas Regional Initiative.
Directie Toezicht Energie, Bonn WS 8 february Bonn 1 SG Workshop: Secondary markets for interconnection capacity: way to adress contractual congestion.
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
PSSA Preparation.
Weekly Attendance by Class w/e 6 th September 2013.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
Draft CMP ROADMAP 19 SG meeting 30 th April 2013.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Madrid, 7 th May th SG Meeting South Gas Regional Initiative.
25 th IG meeting 13 th December 2013 Enagás, REN and TIGF Issues to be discussed.
Madrid, May 21 st th SG Meeting South Gas Regional Initiative Working Group 4B: Open Seasons.
OS 2015: Information Memorandum Draft proposal 12 th SG meeting Madrid 7 th May 2010.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
Capacity Allocation Mechanism Iberian overview 13 th SG meeting Madrid 7 th Feb 2011 DRAFT – Portugal / Spain.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
OS 2015: Allocation Rules Proposal by TSOs 11 th SG meeting Paris 16 th March 2010.
Madrid 16 th February 2009 TSOs presentation 8 th IG meeting.
29th November 2016 Teleconference
Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
21st IG Meeting South Gas Regional Initiative
25th IG meeting 13th December 2013
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
26th IG meeting 23th January 2014
29th November 2016 Teleconference
Presentation transcript:

PILOT PROJECT FOR CAM HARMONISATION 16 th SG meeting Madrid 31 st May 2012

2 Information Memorandum

3 Information Memorandum – contents (I) 1.Background Auctions 3.Description of capacity products 1.Bundled Capacity 2.Virtual Interconnection Point 3.Products 4.Units 4.Qualification Process 1.Pre-qualification Phase 2.Qualification Phase for the firm Yearly Products Auction 3.Qualification Phase for the firm Monthly Products Auction 4.Capacity Application Guarantees 5.Capacities offered 1.Existing contracts 2.Calculation of capacities Tentative Calendar

4 Information Memorandum – contents (II) 7.Auction Process 1.General principles 2.Bidding Windows 3.Bidding Forms 4.Allocation Methodology 5.Emergency Procedure 8.Price 1.Revenue split: capacity premium payments 9.Other 1.Fee to cover auction costs 2.Nominations 3.Gas day 4.Secondary market 5.Anti-hoarding mechanism 6.Allocation of spare capacities after the Auction Process 10.Coordinated Auction Office 11.Contact 12.APPENDICES

5 Products and Auctions ProductsAuctions Firm Yearly ProductsFirm Yearly Products Auction Firm Monthly ProductsFirm Monthly Products Auction Interruptible Yearly ProductsInterruptible Products Auction Interruptible Monthly Products 4 capacity products. A Product consists on capacity which may be bid for, allocated and contracted in a given amount at the VIP, characterised by:  A predefined duration, with a starting and finishing date (Monthly: natural month; Yearly: from 1 st Oct to 30 th Sep).  A flow direction. Two flow directions are possible: from Portugal to Spain (POR->SPA) and from Spain to Portugal (SPA->POR).  A Firm or interruptible character. 3 Auctions.

6 Capacities Interruptibility conditions will be defined in the Access Contract Provisional data – final capacities to be announced

7 Shipper Pre- qualified Shipper Qualified Shipper Bidder Winning Bidder Any licensed shipper or eligible customer in Spain and/or Portugal Has already sent all documentati on for pre- qualification and has been accredited Is allowed to participate in the interruptible Products Auction Has completed the whole Qualification Process for a particular firm Auction Is allowed to participate inthe firm Products Auctions Has sent a Bidding Form to the CAO in a particular Auction Has been allocated capacity in the Auction Shippers Qualification process Auction process

8 Documentation (I) Pre-qualification Phase  Pre-qualification Form to participate in the Auction Process.  Agreements to participate in the Auction Process.  Confidentially and non-collusion Agreements.  Statement of Single Shipper.  Adhesion Agreement.  Access contract.  Copy of sufficient powers, valid and in force of the person signing the Adhesion Agreement.  Document accrediting the powers of the person signing as attorney.

9 Documentation (II) Qualification Phases  Qualification Form to participate in the Auction.  Capacity Application Guarantee

10 Tentative calendar (I) DateMilestone 31 st May15th S-GRI SG meeting: Presentation of draft materials TBD by NRAsApproval of relevant regulations in Spain and Portugal TBD according to previous milestone TSOs notify to Shippers about the amount of capacity to be offered for each month in the Auction Process TBD (June)Open Information Sessions for Shippers (Lisboa, Madrid) 2 nd - 6 th JulyPre-qualification Window Shippers will sign and send the relevant documentation to the CAO 9 th JulySubmission to NRAs of a copy of all Pre-qualification Forms and Statements of Single Shipper received at the CAO until 16:00 CET 12 th JulyAnalysis from regulators of relationship of “control” between Shipper-POR and Shipper-SPA 13 th JulyIndividual letters from CAO with pre-qualification confirmation to Shippers (incl. PQSIN) Pre-qualification Phase

11 Tentative calendar (II) DateMilestone 16 th – 17 th JulyQualification Window for firm Yearly Products Auction Pre-qualified shippers will sign and send the relevant documentation to the CAO 20 th JulyIndividual letters from CAO with qualification confirmation (Qualified Shippers for firm Yearly Products Auction) 23rd July – 24th JulyFirm Yearly Capacity Bidding Window 27 th JulyCAO will publish the aggregated results of the firm Yearly Products Auction. CAO will send individual letters to Bidders with their results. CAO will publish the capacity available for firm Monthly Products. Qualification Phase for firm Yearly Products Auction Firm Yearly Products Auction

12 Tentative calendar (III) DateMilestone 3 rd – 4 th SeptemberQualification Window for firm Monthly Product Auction Pre-qualified shippers will sign and send the relevant documentation to the CAO 7 th SeptemberIndividual letters from CAO with qualification confirmation (Qualified Shippers for firm Monthly Products Auction) 10 th – 11 th SeptemberFirm Monthly Capacity Bidding Window 14 th SeptemberCAO will publish the aggregated results of the firm Monthly Products Auction. CAO will send individual letters to Bidders with their results. CAO will publish the capacity available for interruptible Products. Qualification Phase for firm Monthly Products Auction Firm Monthly Products Auction

13 Tentative calendar (IV) DateMilestone 17 th – 18 th SeptemberInterruptible Capacity Bidding Window 21 st SeptemberCAO will publish the aggregated results of the Interruptible Products Auction CAO will send individual letters to Bidders with their results. Interruptible Ptroducts Auction

14 Bidding forms (I)

15 Bidding forms (II)

Thank you for your attention!