Day-Ahead Market Coupling Algorithm approval coordination NWE IG, Schipol, 28. March 2012.

Slides:



Advertisements
Similar presentations
Draft Cross-regional Roadmap for Day-Ahead Price Coupling NWE Day-ahead price coupling project meeting 15 June 2011.
Advertisements

Cross-regional roadmap for Day-Ahead Market Coupling XXI Florence Forum Florence, 5 December 2011.
4th CSE ERI Stakeholders Group meeting AEEG – European regulatory affairs 15 maggio 2012 Overview of the regional work programme towards 2014.
Day-Ahead Market Coupling Proposal for algorithm approval process 8 th ACER Coordination Group for ERI Brussels, 9 th January 2012.
Draft cross-regional roadmap for Day-Ahead Market Coupling Work in progress, This version: 22 September 2011 updated after 5 th AESAG, 20 September 2011,
IG meeting TITRE 04/04/2013 IG meeting Coordination of the (early) implementation of network codes Programme Office.
TITRE 28/03/2012 NWE IG meeting – Amsterdam Schiphol NWE day-ahead price coupling – cost issues.
SWE IG Meeting Paris, CRE XBID Overview Supported by.
NWE Day-ahead price coupling project Cost Issue 2 nd IG Meeting 26 October APX ENDEX.
Cross-regional roadmap for Capacity Calculation XXI Florence Forum Florence 5 December 2011.
Action plan covering 2008 activities for the implementation of day-ahead implicit auction in Central-South Europe as a mean to allocate cross border capacity.
New structure of GRI NW following revised road map Stakeholder Group meeting Brussels, 26 November 2010 Peter Plug Chairman GRI NW.
RCC meeting Assessing market liquidity within GRI NW TITRE 18/10/2012 RCC meeting First thoughts on project approach for assessing market liquidity within.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
Vision EC on future role Regional Initiatives RCC The Hague, 18 February 2011 Programme Office GRI NW.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
09/12/2011 NWE Stakeholders Group meeting-London Getting to 2014 A contribution from the Regional Initiatives Process Christophe Gence-Creux Head of the.
Click to edit Master title style TITRE CEE IG – 20/02/2014 ACER Long-Term Rights Task Force Current status of the discussion with ENTSO-E.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
3. Update on status and implications of NWE intraday project (selection of the solution for the platform) 11 th Implementation Group Meeting 1 st March.
RCC meeting Monitoring implementation of network codes TITRE 18/10/2012 RCC meeting First thoughts on project approach for monitoring implementation of.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
ACER’s view on the future role of the Gas Regional Initiative Dennis Hesseling Head of the Gas Department, ACER 11 th Stakeholders group meeting of GRI.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3 rd December th Implementation Group meeting.
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
1 page 1 C O U P L E D NWE Day-Ahead Project 1 st NWE Stakeholder Workshop London 9 th December 2011 ENTSO-E Regional Group Northwest Europe.
Implementation of PCR for Day-Ahead Price Coupling in NWE Andrew Claxton NWE Stakeholders’ Workshop 9 December 2012.
Draft Cross-regional roadmap for Capacity Calculation Still work in progress, for discussion 27 June 2011.
on Congestion Management (IG)
1 TITRE Update on approval processes for NWE price coupling NWE IG on DA and ID Copenhagen, 9 May 2012.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Project Status Update 2 nd IG meeting NRA meeting October 26 th Joint Presentation from.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting March 28 th 2012 Amsterdam Joint Presentation from TSOs and PXs.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
SWE Day- Ahead market coupling 7 April 2014 Implementation Group meeting – Paris.
Status of Implementation of PCR for Day-Ahead Price Coupling Florence Forum 5 December 2012.
Draft cross-regional roadmap for Day-Ahead Market Coupling - Work in progress - NWE day-ahead price coupling project IG meeting 26 October 2011.
Draft cross-regional roadmap for Long-Term Transmission Rights Still work in progress, for discussion 27 June 2011.
Madrid Forum 15 October 2014 Massimo Ricci Chairman.
SWE Day- Ahead market coupling 25 February 2014 Implementation Group meeting – Madrid Draft.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
PCR Status report AESAG, September Supported by:
Brief status on key on-going PCR activities NWE Regulators IG Meeting 28 Mar March 2012.
Continuous Cross-Border Implicit Intraday Trade Status update XXI. Florence Forum Dec 05th, 2011.
GRI NW Investment - Update on project Common effort on making regional investment happen 21 September 2010.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 1 October, 2010 Jurmala ACER and regulatory empowerment.
C O U P L E D NWE Day Ahead Price Coupling Handling of losses in the algorithm IG meeting, December 5 th, 2012, DERA premises, Copenhagen.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
Status of Implementation of PCR for Day-Ahead Price Coupling
19th GRI Coordination Group meeting
Supported by: PCR Status report AESAG, September
NWE Day-ahead price coupling project Cost Issue
SWE Day- Ahead market coupling
43th IG Meeting South Gas Regional Initiative
Continuous Cross-Border Implicit Intraday Trade Status update
NWE Day-Ahead Price Coupling
KORRR INFORMAL STAKEHOLDER WORKSHOP
ACER’s view on the future role of the Gas Regional Initiative
Assessment of the Indaba by Steering Committee
Coordination of the (early) implementation of network codes
First thoughts on project approach for monitoring implementation of network codes Programme Office RCC meeting TITRE 18/10/2012.
Supported by: PCR Status report AESAG, September
First thoughts on project approach for assessing market liquidity within GRI NW Programme Office RCC meeting TITRE 18/10/2012.
43th IG Meeting South Gas Regional Initiative
Gas Regional Investment Plan project
First thoughts on project approach for monitoring implementation of network codes Programme Office RCC meeting TITRE 18/10/2012.
Coordination of the (early) implementation of network codes
Coordination of the (early) implementation of network codes
ACER’s view on the future role of the Gas Regional Initiative
Update developments in Core CCR
Presentation transcript:

Day-Ahead Market Coupling Algorithm approval coordination NWE IG, Schipol, 28. March 2012

2 Background. Cross-regional roadmap: ACER shall coordinate “NRAs’ “endorsement” of the starting point of the PCR algorithm”. All NRAs shall “agree on a common, coordinated approval/review process for the algorithm”. This agreement shall also be finalised in Q and it is dedicated also towards the final algorithm to be used in operation in NWE and EPC.. NWE Day-Ahead Cross-Regional Coordination Committee (CRCC) drafted common approval process for the algorithm with the aim to align as far as possible aspects of national processes and to limit duplication of work.. The CRCC also established a Task Force to deal with this subject

3 Endorsement in the Letter of Comfort. NRAs and ACER welcome ENTSO-E’s positive assessment of the starting point algorithm. Encourage further and fast development of the PCR algorithm by Power Exchanges. General TSO requirements, once finalized, subject to NRA approval. Specific use of requirements / functionalities, subject to NRA approval. Need to ensure stakeholder involvement (PXs). Provide endorsement of the choice of algorithm starting point (COSMOS)  Condition: necessary governance and cooperative arrangements can be made in due time. Ongoing communication and cooperation between NRAs and PXs about the algorithm development

4 Further process. ACER letter of comfort. Task Force involvement under the industrialization phase of the PCR algorithm (discussions on side constraint, simulation results, etc.)  more detailed assessment of the algorithm. Task Force will give a recommendation for approval of algorithm (to the NWE CRCC and ACER). Recommendation and Assessment can be used as input to national approval processes

5 Thank you for your attention