on Congestion Management (IG)

Slides:



Advertisements
Similar presentations
EU funds’ evaluation plan , Latvia
Advertisements

Draft Cross-regional Roadmap for Day-Ahead Price Coupling NWE Day-ahead price coupling project meeting 15 June 2011.
4th CSE ERI Stakeholders Group meeting AEEG – European regulatory affairs 15 maggio 2012 Overview of the regional work programme towards 2014.
Day-Ahead Market Coupling Proposal for algorithm approval process 8 th ACER Coordination Group for ERI Brussels, 9 th January 2012.
Draft cross-regional roadmap for Day-Ahead Market Coupling Work in progress, This version: 22 September 2011 updated after 5 th AESAG, 20 September 2011,
Evaluation Plan in Hungary Dr. Tamás Tétényi Head of Department for Strategy and Evaluation National Development Agency.
TITRE 28/03/2012 NWE IG meeting – Amsterdam Schiphol NWE day-ahead price coupling – cost issues.
SWE IG Meeting Paris, CRE XBID Overview Supported by.
NWE Day-ahead price coupling project Cost Issue 2 nd IG Meeting 26 October APX ENDEX.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Cross-regional roadmap for Capacity Calculation XXI Florence Forum Florence 5 December 2011.
2 nd IG-Meeting Preparation of the Coordinated Physical Transmission Right (PTR) Allocation Scheme for the CEE – Region Vienna
8 th IG-Meeting Coordinated Auctioning, Auction Office and Organisational Issues Christian Todem Vienna
Disclaimer Some elements of the following presentation are extracted from documents approved by the 11 CWE Project Parties. However, this presentation.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Click to edit Master title style TITRE CEE IG – 20/02/2014 ACER Long-Term Rights Task Force Current status of the discussion with ENTSO-E.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
IFE-CASC long term auctions Project status Implementation Group Meeting - Lisbon,
Table of contents 1 Manual of Operational Procedures (MOP) 2
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3 rd December th Implementation Group meeting.
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
1 page 1 C O U P L E D NWE Day-Ahead Project 1 st NWE Stakeholder Workshop London 9 th December 2011 ENTSO-E Regional Group Northwest Europe.
Draft Cross-regional roadmap for Capacity Calculation Still work in progress, for discussion 27 June 2011.
Day-Ahead Market Coupling Algorithm approval coordination NWE IG, Schipol, 28. March 2012.
1 TITRE Update on approval processes for NWE price coupling NWE IG on DA and ID Copenhagen, 9 May 2012.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Project Status Update 2 nd IG meeting NRA meeting October 26 th Joint Presentation from.
SWE Day- Ahead market coupling 7 April 2014 Implementation Group meeting – Paris.
Deliverable I.4 Cross-border balancing model among TSOs -BALIT project- (7 th SG SWE, Lisbon, December 3 rd 2013)
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Internal Auditing and Outsourcing
SWE Day- Ahead market coupling 25 February 2014 Implementation Group meeting – Madrid Draft.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
PCR Status report AESAG, September Supported by:
Second expert group meeting on Draft fiche on delegated act on the European code of conduct on partnership (ECCP) Cohesion Policy
Market Design of SE Europe: Reflections from the 3rd Forum on the Way Forward 6 th Permanent High Level Group Meeting Athens, 07 December 2003.
Actions for establishing a Single Auction Office for CSE 9 th IG Meeting Milan, 18 th July 2008.
1 Auction Office establishment, antitrust issues and Project Plan IG Meeting, Vienna January 30 th 2008.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
The Status Report for IG meeting Wojciech Jarosz February 13 th 2009.
Brief status on key on-going PCR activities NWE Regulators IG Meeting 28 Mar March 2012.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Expert group meeting on draft delegated act on the European code of conduct on partnership (ECCP) under cohesion policy
PCR Status Date: 5 December Content Achievements Revised planning outlook Reasons for delays Remaining risks.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
3 rd Stakeholders Group Meeting Project status and details of the ongoing development of the load-flow based capacity calculation/allocation system CEE.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
European Commission views on intra-day and balancing markets
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
C O U P L E D NWE Day Ahead Price Coupling Handling of losses in the algorithm IG meeting, December 5 th, 2012, DERA premises, Copenhagen.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
Croatia: Result orientation within the process of preparation of programming documents V4+ Croatia and Slovenia Expert Level Conference Budapest,
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
1 16 th February 2016 Videoconference 35 th IG Meeting South Gas Regional Initiative.
NWE Day-Ahead Price Coupling
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
Supported by: PCR Status report AESAG, September
SWE Day- Ahead market coupling
NWE Day-Ahead Price Coupling
Supported by: PCR Status report AESAG, September
The role of the ECCP (1) The involvement of all relevant stakeholders – public authorities, economic and social partners and civil society bodies – at.
Activity on Eutrophication
Presentation transcript:

on Congestion Management (IG) 34rd meeting of the Implementation Group on Congestion Management (IG) Presentation of the CEE TSOs 20 February 2014 Vienna 2014 – 2 – 20 CEE TSOs - IG meeting Vienna

Table of contents Recent Developments Status report CEE TSOs II. CEE FB MC Project Development and Implementation II.1 Status report II.2 Project structure, project management II.3 Cooperation CWE/NWE and CEE II.4. Roadmap elaboration II.5. Further steps 2014 – 2 – 20 CEE TSOs - IG meeting Vienna

Status Report of CEE TSOs (1/3) I. Recent Developments Status Report of CEE TSOs (1/3) Governance Workstream: CEE TSOs have taken note of the final version of the MoU and the signature process started by the Lead Regulator ECA CEE TSOs have approved on 31 January to start immediately with the initiation of the NWCE MC project by setting up the project structure from the TSO-side (JSC and JWG MC) and invite CEE PXs to do the same Call for nomination of TSO members and potential chairpersons have been sent out PXs have been invited to do the same CEE TSOs nominated members and voted on a chairperson FP will organise the first JSC meeting as soon as PX members have been communicated to FP 2014 – 2 – 20 CEE TSOs - IG meeting Vienna

Status Report of CEE TSOs (2/3) I. Recent Developments Status Report of CEE TSOs (2/3) Technical Workstream: CEE TSOs achieved consensus on how to continue the work on the two options in order to take better into account unscheduled flows in the FB methodology Security Oriented Option (SOO) Based on today´s bidding zones, considering/mitigating the influence of loop flows - limitation (cap) of exchange schedules between DE and AT by redispatching/countertrading measures, considering this limitation in the FB capacity calculation mechanism. Progress was achieved on the SOO. The CEE TSO HLM stated that the preparatory step was finalized and step 1 can be started. Finalisation of dBFRM assessment was achieved, WG FBA started with calculation for 120 timestamps of the year 2013 Final results for step 1 are expected for end of July 2014 2014 – 2 – 20 CEE TSOs - IG meeting Vienna

Status Report of CEE TSOs (3/3) I. Recent Developments Status Report of CEE TSOs (3/3) Technical Workstream: Financial Compensation Oriented Option (FCOO) Based on today´s bidding zones, considering the influence of loop flows – focusing on social welfare differences between situations with/ without prioritized schedules for DE-AT, define a compensation mechanism. Out of several sub-options, the CEE TSO HLM agreed on selecting sub-option 1A (social-welfare-oriented, no DE-AT market splitting) for further elaboration. Letter to PCR will be sent in order to get support for the simulations Both options (COO Step 2) and FCOO need a market simulation tool and a market coupling simulation tool: CEE TSOs are exploring the market and giving recommendations to the WGs. Market simulation for bidding zone will be assessed if it is available timely. 2014 – 2 – 20 CEE TSOs - IG meeting Vienna

II. CEE FB MC Project Development and Implementation II.1. Status Report CEE TSOs have started to initiate the project structure – see status report under agenda point I. ToRs for JSC and JWG MC received from PXs commented and sent back for approval Assessment of PCR algorithm Negotiations on NDA/CD with PCR parties still ongoing In the mean time PCR has published information on Euphemia algorithm, CEE TSOs are assessing the public information on Euphemia CEE TSOs are looking for a meeting of experts with PCR in order to assess whether this public information is sufficient to go on Regional NDA for TSOs and PXs for the NWCE FB project has priority 2014 – 2 – 20 CEE TSOs - IG meeting Vienna

II. CEE FB MC Project Development and Implementation II.2. Project structure, project management JSC CEE TSO HLM WG CA WG Scheduling JWG MC STF Reg /Com STF Legal CEEE Forum (Ministries, EC, ACER, TSOs, PXs, NRAS, Market Parties) IG Meeting (NRAs, EC, ACER, TSOs, PXs) PMO TF Algorithm & FB Validation TF Shipping TF Operational Procedures TF Testing WG FBA PXs MM PX WG MC governance communication exchange 2014 – 2 – 20 CEE TSOs - IG meeting Vienna

II. CEE FB MC Project Development and Implementation II.2. Project structure, project management – ToRs JSC Main decision making body Binding approval of design concepts, agreements, reports and other documents which are elaborated by respective working groups; Delegation of tasks and engagement of external support (e.g. the Project Manager (PMO)); Changes to the Project and the Project roadmap; Joint external communication on the Project including quality and quantity of information provided on the Project and timing of the delivery of such information to other stakeholders/ the public; Establishment of Task Forces and Supportive Task Forces, setting and amendment of terms of reference for Joint Working Group Market Coupling Budgeting and costs approval , Presentation of costs to relevant decision bodies including request for relevant costs comfort. Decision on and definition of the modalities of the involvement of other relevant stakeholders. Supportive Task Forces work on ad-hoc basis in order to support different workstreams. Each partner one vote – unanimous decision Each TSO, PX one member + substitute, guest can be invited without voting power Co-Chairs from both TSOs – PXs – elected for a term of 12 month JSC may engage a PMO 2014 – 2 – 20 CEE TSOs - IG meeting Vienna

II. CEE FB MC Project Development and Implementation II.2. Project structure, project management – ToRs JWG MC (1/2) Main tasks (to be defined by JSC) Algorithm and FB validation Development of Market Design Development and implementation of shipping concept Preparation and performance of testing Continuous budget planning and monitoring (as long as PMO has not been established) Supervision of the budget planning and monitoring after PMO has been established Development of cost-sharing and cost-recovery principles for implementation and operation phase Decision on what costs may be shared (Costs of PMO, time of the Chairmen, Conveners and Co-Conveners etc.) Provision of drafts for the necessary contracts and organization of signing procedures Press release management Identification of required regulatory approvals and their timing Organization of timely regulatory approval processes Monitoring of and reporting on implementation Preparation and performance of PMO selection procedure and recommendation of (selected) PMO to JSC 2014 – 2 – 20 CEE TSOs - IG meeting Vienna

II. CEE FB MC Project Development and Implementation II.2. Project structure, project management – ToRs JWG MC (2/2) Deliverables Drafting and negotiation of the FPA for the design phase ; Unambiguous and measurable acceptance criteria for Go-Live; Penalties/indemnity clauses, liability; Development of cost sharing principles etc.; Budget planning for the Project; Drafting and negotiation of the NDAs necessary for the design phase; Description of individual TFs responsibilities and deliverables Supported by Task Forces (TF) and ad-hoc groups (sTF) Each partner one vote – unanimous decision Each TSO, PX one member + substitute, guest can be invited without voting power Co-Chairs from both TSO – PXs 2014 – 2 – 20 CEE TSOs - IG meeting Vienna

II. CEE FB MC Project Development and Implementation II.3. Cooperation CWE/NWE and CEE NWE TSOs have been busy in the past due to NWE MC project NWE structures may change with the finalisation of the project Some TSOs and PXs are involved in other regions and can bring in their experiences and knowledge (without disclosing protected information) CEE TSOs recommend to start with the project on regional level and address NWE TSOs on issues where we need their information/involvement WG RMDT identified indicative issues where we might need cooperation of NWE TSOs High priority issues related to the design phase: Bilateral energy exchange calculations; Operational procedures connected to the coupling phase Medium priority: PCR algorithm assessment; Testing Lower priority: Cross-regional operational agreements Harmonisation with CWE FB – after CEE have common understanding of FB methodology in CEE There might be the need discuss with NWE resources and timing as there are other regions (SWE, CSE, NBI) are heading for a coupling at the same time Highly depending on the final Roadmap to be amended by JSC asap 2014 – 2 – 20 CEE TSOs - IG meeting Vienna

II. CEE FB MC Project Development and Implementation II.4. Roadmap elaboration (1/2)   2014 2015 2016 2 3 4 5 6 7 8 9 10 11 12 1 MoU preparation and signing NDA preparation and signing Creation of CEE project structure Budget planning Cost Sharing principles Framework Project Agreement Validation of MC Algorithm PCR - involvement CEE/CWE FB harmonization CEE FB capacity calculation mechanism Cross-border clearing and settlement process Congestion income distribution Other postcoupling processes Fallback procedures Operational contracts FB MC testing - Internal FB MC testing -External CEE + NWE testing - Acceptance Evaluation and consultation of FB MC Initiation Go Live Design Implementation (& Testing/Approval) Testing Final Approval for Go Live 2014 – 2 – 20 CEE TSOs - IG meeting Vienna

II. CEE FB MC Project Development and Implementation II.4. Roadmap elaboration (2/2) CEE TSOs have drafted the Roadmap based on the Project Initiation Document elaborated between CEE TSOs and PXs, but without involvement of NWE Current Roadmap sees a period of 27 month after MoU signature for the finalisation of the project Regulators have asked to revise the roadmap CEE TSOs have made the decision to hand this over to the JSC/JWG MC as involvement of PXs is needed for the revision 2014 – 2 – 20 CEE TSOs - IG meeting Vienna

II. CEE FB MC Project Development and Implementation II.5. Further steps Agreement with PX’s on ToRs of JSC and JWG MC Organisation of first JSC meeting by FP JSC has then to take the next steps according ToRs 2014 – 2 – 20 CEE TSOs - IG meeting Vienna