Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.

Slides:



Advertisements
Similar presentations
Biomethane connections – current developments Biomaster Network Meeting Norwich 11 th November 2011 David Pickering.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 0508 Revised Distributed Gas Charging Arrangements  Proposed change to take into account that flows from DN Entry points to DN Supply Points should.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
CSEP Transportation Charges 11 th August Background Action NEX0604 from 18 th June PN UNC requested Xoserve to provide a presentation on how Supply.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
A layman’s guide to the structure of LDZ gas charges 27 July 2009 Please note – in the interests of clarity and accessibility, simplifications have been.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 116B Steve Rose - on behalf of RWE Trading. 2 Background Mod 116 B was raised after discussion with a number of shippers about aspects Mod 116 which.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
Offtake Arrangements Document – An Overview Paul Roberts 12 th May 2005.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
LDZ System Charges – Structure Methodology 26 April 2010.
DNPC06 LDZ NEC Charges Denis Aitchison 25 th January 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
DNPD04 LDZ Exit Capacity Charges- Discussion Report Denis Aitchison 27 th July 2009.
Distribution Network Interruption - Initialisation 28 September 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
The calculation of the NTS Optional Commodity tariff (NTS Shorthaul) in the Enduring Exit Period Richard Hounslea/Debra Hawkin National Grid NTS, Gas Charging.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
DNPC08 Review of Standard LDZ System Charges Consultation Responses 25 October 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DRSEC Update Transmission Workstream 06 November 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
MOD0164 Bi-Directional Connection Point Overrun Charge Calculation Stuart Waudby (Centrica Storage Ltd.)
Transitional Exit Capacity Proposals -Update Offtake Agreement Workstream, 30 Nov 05 Dave Adlam.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Background Current balance of LDZ System and Customer charges
Exit Capacity User Commitment – Transmission Workstream update
Transmission Workstream 4th July 2007
LDZ System Charges – Structure Methodology 26 July 2010
DNPC06 From 1 October 2012 the DNs will pay the NTS Exit Capacity charges to the NTS and recover the cost from shippers DNPC06 put forward for consultation.
Pricing and Margins Manager National Grid Distribution
Presentation transcript:

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. UNC Mod 0391 Charging Proposals for DN Entry Under Option 3 (shallow boundary with entry charge) David Pickering22 November 2011

2 Transportation of Distributed Gas Entry from NTS LTS Distribution Tiers Service Pipe Emergency Service Entry Facility Distributed Gas NBP LDZ System Charge Supply Point ECN Charge (2012) CustomerCharge NTS Exit Capacity Avoided or Lower costs Unaffected Impact of Distributed Gas New costs

3 Which Costs are Incurred by each Party? Connectee  Gas production facilities  Connection pipe  Compression prior to entry  CV enrichment Distribution Network  Network reinforcement or within–network compression  Additional network opex Either?  Pressure/Flow control  Gas Quality Monitoring  Metering  Odorant Injection  Shut-off valve  Telemetry and control equipment

4 Which cost variations should be taken into account?  Deemed Reduction in NTS Exit Capacity bookings  Lower Usage of network pipeline tiers  Variation in Entry equipment costs between NTS-DN offtakes and Distributed Gas entry points  Specific Reinforcement or (if feasible) within network compression and additional operating costs

5 Derivation of Credit for Reduced LDZ System Usage  Credit based on sum of typical usage costs for higher pressure tiers  Should some credit be provided for LTS connection?  Approximately 70% of LDZ System charges relate to Low Pressure tier costs  Should there be any credit for lower LP tier usage be given?  Similar credit applied in respect of LDZ System commodity usage

6 Entry Charge for Entry Facility Costs  Where DN provides and operates the entry facility covering Pressure/Flow control, Metering, Gas Quality Monitoring, Odorant Injection, Shut-off valve, Telemetry and control equipment  Charge as fixed cost per annum or convert to capacity charge?

7 Entry Charge for Network Reinforcement or Compression  Where DN undertakes pipeline reinforcement or installs within- network compression so as to enable gas to be entered into system  Charge as fixed cost per annum or convert to capacity charge?  Opex has large fixed maintenance element so keep as fixed?

8 Example of Potential Entry Charge  Should individual charge elements be updated each year in line with other transportation charges?  Should capacity basis be fixed at the time of connection?  Is it worth having a separate commodity credit element for system tier usage?  Should all charges be converted to equivalent fixed elements at the time of connection based on parameters at that time so that a single fixed charge or credit can be invoiced?

9 NTS SO Commodity Charge  Currently charged by reference to supply points, so all gas (including Distributed Gas) pays  Charge = p/kWh (April 2012 indicative)  Currently not included in the Mod 391 proposals, but probably appropriate that distributed gas should not pay this charge  Should a new Mod be raised, or should the Mod 391 proposals be amended to accommodate?  If Mod 391 amended, may delay progress of Mod due to need for Transmission to be involved, however, would enable a holistic implementation discussion with Xoserve to take place