Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.

Slides:



Advertisements
Similar presentations
Draft Cross-regional Roadmap for Day-Ahead Price Coupling NWE Day-ahead price coupling project meeting 15 June 2011.
Advertisements

Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
Cross-Regional Roadmap for Intraday DRAFT Updated 31/10/2011.
Cross-regional roadmap for Capacity Calculation XXI Florence Forum Florence 5 December 2011.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
Access to long-term capacity for electric interconnections: toward a single European set of rules 2 nd common RCC CSE-CWE regions 28 September 2010 Milan.
1 Intraday in the CWE region NWE and Bilateral initiatives Common RCC CSE - CWE 28 September 2010.
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Planning for allocation rules and the auction platform NRAs propose to follow a two-steps approach:. 2013: » Based on the wish-list and within the scope.
ACER’s view on the future role of the Gas Regional Initiative Dennis Hesseling Head of the Gas Department, ACER 11 th Stakeholders group meeting of GRI.
Progress with coupling FUI and CWE region
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
1 page 1 C O U P L E D NWE Day-Ahead Project 1 st NWE Stakeholder Workshop London 9 th December 2011 ENTSO-E Regional Group Northwest Europe.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Draft Cross-regional roadmap for Capacity Calculation Still work in progress, for discussion 27 June 2011.
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
SG MEETING GRI NW– 28 N OVEMBER 2013 Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the.
Feedback on the SWE coupling Public Consultation Imeplementation Group meeting – 7th april 2014.
Draft document – Work in progress
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
FUI Electricity region: Update on Congestion management CRE SG Meeting - 3 December 2008.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
IG FUI, Brussels, 21 st of May European thinking on intraday target model.
Challenges for the SEM.  Day-ahead price coupling is a key feature of the final draft Framework Guidelines on congestion management issued by ERGEG in.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Co-ordination of Decisions at Regional and European level.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
José Sierra, RIG Chair Rafael Gómez-Elvira (RIG Chair Team) XIX Florence Forum 14 December 2010 ERGEG Electricity Regional Initiatives Status Review.
0 Congestion management Congestion management Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
European Commission views on intra-day and balancing markets
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
SEM Regional Integration Decision Paper FUI Stakeholder Group Meeting 16 June 2010.
Draft Framework Guidelines on Capacity Allocation and Congestion Management Florence Forum 13 December 2010 Alain Marien ENM TF co-chair.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
European Developments Transmission Workgroup 1 st December 2011.
European Market Model Implementation CIM Users Group Spring Meeting Praha, Czech Republic.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
1 page 1 C O U P L E D NWE Day Ahead Project Update FUI IG Mtg – London 13 th September 2010 ENTSO-E Regional Group Northwest Europe C O U P L E D.
Congestion Management
Public Consultation : main conclusions (1/2)
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
Cross-regional roadmap on capacity calculation and long-term capacity allocation Impact for the FUI regional roadmap Work document FUI Implementation Group.
Background and Process
Regulators’ update on Congestion Management and Balancing
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Update on European Network Codes
Gas balancing – where next
Presentation transcript:

Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact on FUI

2FUI SG, London, 11 th of March 2011 European Council Conclusions, 4 th Feb 2011: “The internal market should be completed by 2014 so as to allow gas and electricity to flow freely. This requires in particular that in cooperation with ACER national regulators and transmission systems operators step up their work on market coupling and guidelines and on network codes applicable across European networks”.

3FUI SG, London, 11 th of March 2011 Progress to date … CWE market coupling TLC  CWE coupling ITVC between CWE & Nordic regions) “AHAG” – stakeholder group Implementation projects and roadmap … North West Europe TSO projects Day ahead & Intraday coupling Price Coupling of Regions (PCR) PX initiative (NWE region + Spain & Italy)

4FUI SG, London, 11 th of March 2011 Framework Guidelines and Network Codes Technical and Market based Codes Legally binding rules covering issues relevant to cross border trade and related system operation Framework Guidelines: Set high level principles for the code (Regulators) Network Codes: Necessary steps to implement FG (TSOs) Market integration codes: Capacity Allocation and Congestion Management (CACM) – in progress Balancing – FG drafting begins Summer 2011

5FUI SG, London, 11 th of March 2011 Context: CACM Framework Guideline Following the adoption of the Third Energy Package, the Commission invited ERGEG to draft a FG on Capacity Allocation and Congestion Management (CACM) A specific project team was created inside ERGEG ENM TF to draft the Initial Impact Assessment (IIA) and the draft Framework Guideline (FG) A workshop was organised on 18 October 2010 The public consultation on the ERGEG draft FG was closed on 10 November 2010 After the entering into force of the Third Energy Package (3 rd March 2011), the Agency shall submit within maximum six months a non-binding framework guideline for cross-border network issues and market integration issues

6FUI SG, London, 11 th of March 2011 EU Regulation requires an increased cooperation and coordination among TSOs to create network codes for providing and managing effective and transparent access to the transmission networks across borders Network codes shall be in line with Framework Guidelines As soon as the FG on CACM will be finalised, ENTSO-E has 12 months to submit to the agency the Network Codes  to be implemented by 2013 In order to involve all stakeholders during the drafting of the Network codes, ENTSO-E envisages a group similar to AHAG led by ENTSO-E to support the development of the network codes. This group will follow all the codes to ensure consistency in the approaches of the codes Context: CACM Network Code

7FUI SG, London, 11 th of March 2011 CACM: The Target Model The FG covers most of current Congestion Management Guidelines content (except Transparency which is covered separately) Scope and level of detail goes beyond the CM Guidelines, reflecting experiences since 2006 The FG provides an answer to these issues: Capacity Calculation Delimitation of Zones Day-ahead Market Forward Market Intra-day Market

8FUI SG, London, 11 th of March 2011 CACM Target Model (1/3) Capacity Calculation: TSOs define and implement either Flow-Based (in meshed grids) or ATC method Zone delimitation: Definition: a zone corresponds to a bidding area, Objective: overall market efficiency, taking into account network topology and contributing to correct price signals Process: proposed by TSOs, reviewed by NRAs after market consultation

9FUI SG, London, 11 th of March 2011 CACM Target Model (2/3) Capacity allocation methods for the day-ahead market: TSOs, in cooperation with PXs, implement capacity allocation on the basis of implicit auctions via a single price coupling algorithm which determines at the same time the volumes and prices in all relevant zones Capacity allocation methods for the forward market: the options for enabling risk hedging for cross-border trading are Financial Transmission Rights (FTR) or Physical Transmission Rights (PTR) with UIOSI (Use-It-Or-Sell-It) unless appropriate cross-border financial hedging instruments are offered in liquid financial markets.

10FUI SG, London, 11 th of March 2011 CACM Target Model (3/3) Capacity allocation methods for the intraday market: Continuous implicit trading, including reliable pricing of capacity reflecting congestion (i.e. in case of scarce capacity), automatic matching, appropriate block bids and sophisticated products where needed; A pan-European capacity management module (CMM) allocating continuously capacity. Once allocated, capacity is firm. Where applicable, until the full implementation of the provisions of these Framework Guidelines in the CACM Network Code(s), the CMM may provide direct access for bilateral supply (OTC) contracts to the capacity. A shared order book function provided with the bids submitted by all participating PXs and intraday platforms and real-time information on available transmission capacity.

11FUI SG, London, 11 th of March 2011 How to reach target model in the FUI? Focus on day-ahead Work is needed between TSOs and PXs to implement a proper market coupling between the FUI region and the CWE region Long term: Compatibility of the platforms for anonymous secondary trading at least at regional level General requirements and provisions also clarify other issues for the FUI region: Clear framework for firmness before and after nominations of LT capacities except in case of force majeure. Physical firmness is the preferred approach Physical firmness for DA trades even in case of force majeure

12FUI SG, London, 11 th of March 2011 Thank you for your attention!