GRIP South South Region Gas Regional Investment Plans SGRI – 23 September2013.

Slides:



Advertisements
Similar presentations
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Advertisements

Vision for the internal electricity market
GRIP South Region Gas Regional Investment Plans Investment WS – 29 th Sep 2011.
Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
Madrid, 13 th November th SG Meeting South Gas Regional Initiative.
Paris, 14 th December th IG Meeting South Gas Regional Initiative.
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 15 November 2013.
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 13 December 2013.
Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
Gas Regional Investment Plan North West Stakeholder Consultation Presentation 4 th April
EU Developments Transmission Workgroup 3rd November 2011.
Completing the EU internal energy market IFIEC, 22 November 2011
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
CMP PROPOSAL FOR HARMONISATION 17 th IG meeting Madrid 2 nd November 2011.
Madrid, September 23 rd th SG Meeting South Gas Regional Initiative Open Season for future capacity.
GRI-S : Infrastructures The Union list of projects of common interest European Commission DG Energy Internal Market I: Networks and Regional Initiatives.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
SG MEETING GRI NW– 28 N OVEMBER 2013 Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the.
Update Transparency project RCC The Hague, 12 May 2011 Konrad Keyserlingk - Ofgem -
1 Madrid, 19 th November th IG Meeting South Gas Regional Initiative.
1 Madrid, 27 th February st IG Meeting South Gas Regional Initiative.
 TYNDP assessmentFindings for NW region  ResilienceDenmark/Sweden, Luxembourg  Supply dependencySouth of France  Network adaptabilityno issues  Supply.
1 Madrid, 30 th April th SG Meeting South Gas Regional Initiative.
Gas Regional Initiative Region North-West Gas Regional Investment Plan Project Marie-Claire Aoun, Carole Mathieu CRE RCC Meeting The Hague – 4 April 2013.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
P.Labra – EWEA March 2012 ENTSO-E’s & TYNDP’s vision on adapting European Transmission Grid to large amounts of wind power.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
RCC meeting Gas Regional Investment Plan project TITRE 18/10/2012 RCC meeting Gas Regional Investment Plan project CRE.
Market Integration & SoS Initial proposals for SJWS #5 ENTSOG offices – Brussels Stakeholder Joint Working Session – 20 March 2012.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
1 South Gas Regional Initiative 16 th Dec 2011 South Gas Regional Initiative 16 th Dec 2011.
Tahir Kapetanovic ENM TF Co-Chair XIX Florence Forum, December 2010 ERGEG Opinion on the ENTSO-E pilot TYNDP.
TSO Transparency project Gas Regional Initiative North West Nicola Meheran, Ofgem Regional Co-ordination Committee 15 September 2011.
27 th IG meeting 28 th March 2014 Enagás, GRTgaz, REN and TIGF.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
European Developments Transmission Workgroup 1 st December 2011.
37 th IG meeting 31 st May 2016 Enagás, GRTgaz, Reganosa, REN and TIGF.
South Region Second Edition
40th IG meeting 29th November 2016
Enagás, GRTgaz, Reganosa, REN and TIGF
Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),
Gas Regional Investment Plans
43th IG Meeting South Gas Regional Initiative
Work plan of GRI NW for 2011 Three out of four projects are started
Gas Regional Initiative
In depth analysis of TYNDP issues
Gas Regional Investment Plan North West
In depth analysis of TYNDP issues
26th February 2015 Teleconference
Gas Regional Investment Plan North West
Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),
ACER opinion on ENTSOG’s 2011 Ten-Year Network Development Plan
43th IG Meeting South Gas Regional Initiative
Enagás, GRTgaz, Reganosa, REN and TIGF
Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the ACER Gas Infrastructure Task Force.
Gas Regional Investment Plan project
40th IG meeting 29th November 2016
Purpose Transparency is a critical element in ensuring an effective functioning internal European Gas market Gas Regulation No 715/2009, effective from.
In depth analysis of TYNDP issues
26th February 2015 Teleconference
Work plan of GRI NW for 2011 Three out of four projects are started
The establishment of the 2nd list of Projects of common interest
Presentation transcript:

GRIP South South Region Gas Regional Investment Plans SGRI – 23 September2013

GRIP South GRIP South Index 2 1.Perimeter / objectives 2.Methodology / Content 3.Planning

GRIP South Perimeter /Objectives  3 Countries (FR, SP, PT) and 4 TSOs  Main drivers/objectives Complementing EU-TYNDP Consistent with National Plans Taking into account feedbacks received on GRIPs:  More harmonization (with ENTSOG assistance)  Improve communication and consultation  More comprehensive approach on the system needs and remedies (projects) / TYNDP  updated information / TYNDP “The strategic concept of the North-South Corridor in Western Europe, that is to better interconnect the Mediterranean area and thus supplies from Africa and the Northern supply Corridor with supplies from Norway and Russia.” (EC, EIP for 2020) EU energy policy, “Trans-European energy infrastructure” (12/03/13)

GRIP South 4  Regulation, previous GRIP, Feedbacks received  GRIPs harmonization and ENTSOG guidance:  TYNDP  Updates on Demand and Projects organized at EU level,  Additional modelling with ENTSOG tool,  More homogeneity of the GRIPs contents (+ regional specificities),  Consultation of stakeholders  SGRI meetings  ENTSOG Workshop dedicated on GRIPs (19 th November)  Consultation on the draft document (to clarify ) Methodology

GRIP South 5  Network assessments / remedies  More detailed analysis of the needs / TYNDP assessment  Additional assessments: other modelling, IPs capacity subscription, Hub price spreads analysis (to confirm), interconnections utilization rates (to confirm), market consultations (OS)...  Remedies : focus on the projects answering to the needs identified in the network assessment  Updated information / TYNDP  Information on projects will be updated  Demand information will be updated  To address : update of the results ( i.e. Assessments ) Methodology

GRIP South 6  Introduction  Demand: analysis of the demand in the South region  Supply: analysis of the assets and the needs of the Region  Projects (capacities evolution): analysis of the projects in the South Region  Network assessments:  In-depth analysis of the TYNDP assessments  Other assessments /analysis  Remedies:  In-depth analysis of projects answering to needs identified in the chapter “Network assessment”  Conclusion  Appendices : updated data / TYNDP Content

GRIP South 7  TSOs meetings : from October  ENTSOG TYNDP publication : 21 st February 2013  Writing of the new GRIP : from February  Stakeholders communication / consultation: o GRI South meeting(s) : IG & SG meetings o ENTSOG meeting(s) : Workshop (19 th November) o Consultation : (to confirm/clarify)  Regulators : on a “final” draft  Other stakeholders : on the published document  Publication : end of 2013 Planning

GRIP South Thank you for your attention