09/12/2011 NWE Stakeholders Group meeting-London Getting to 2014 A contribution from the Regional Initiatives Process Christophe Gence-Creux Head of the.

Slides:



Advertisements
Similar presentations
Draft Cross-regional Roadmap for Day-Ahead Price Coupling NWE Day-ahead price coupling project meeting 15 June 2011.
Advertisements

Cross-regional roadmap for Day-Ahead Market Coupling XXI Florence Forum Florence, 5 December 2011.
Day-Ahead Market Coupling Proposal for algorithm approval process 8 th ACER Coordination Group for ERI Brussels, 9 th January 2012.
Draft cross-regional roadmap for Day-Ahead Market Coupling Work in progress, This version: 22 September 2011 updated after 5 th AESAG, 20 September 2011,
Draft Framework Guidelines on System Operation - Process Presentation Workshop, Ljubljana, 24 August 2011 Uroš Gabrijel (ACER)
Cross-Regional Roadmap for Intraday DRAFT Updated 31/10/2011.
Cross-regional roadmap for Capacity Calculation XXI Florence Forum Florence 5 December 2011.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
ENTSOG’s view on next steps for regional co-operation Nigel Sisman Senior Adviser Stakeholder Group, GRI NW, Brussels, 26 Nov 2010.
Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
Completing the EU internal energy market IFIEC, 22 November 2011
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
Florence Forum Third package December, The possibility given by the EC to all stakeholders to comment the ” Discussion paper on the Third Energy.
GRI-S : Infrastructures The Union list of projects of common interest European Commission DG Energy Internal Market I: Networks and Regional Initiatives.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
ACER’s view on the future role of the Gas Regional Initiative Dennis Hesseling Head of the Gas Department, ACER 11 th Stakeholders group meeting of GRI.
1 page 1 C O U P L E D NWE Day-Ahead Project 1 st NWE Stakeholder Workshop London 9 th December 2011 ENTSO-E Regional Group Northwest Europe.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Draft Cross-regional roadmap for Capacity Calculation Still work in progress, for discussion 27 June 2011.
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
SG MEETING GRI NW– 28 N OVEMBER 2013 Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the.
GRI NW European Energy Work Plan 2011 – 2014 Programme Office RCC meeting, 15 September 2011.
Report on ACER Progress An exchange of views with the Committee on Industry, Energy and Research of the European Parliament Brussels, 11 July 2011.
The Capacity Allocation & Congestion Management Network Code An overview & status update Antonio Lopez-Nicolas Manager - Markets.
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
Jose Braz, ERGEG Conference on Implementing the 3rd Package 11th December 2008 The Agency for the Cooperation of European Energy Regulators.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Ana Arana Antelo Electricity and Gas Unit Implementing the 3rd Energy package, Commission’s role EUROPEAN COMMISSION “IFIEC Europe Energy Forum” Brussels.
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
Draft cross-regional roadmap for Day-Ahead Market Coupling - Work in progress - NWE day-ahead price coupling project IG meeting 26 October 2011.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Lord Mogg Chair of ERGEG Florence Forum June 2009 Implementation of the Third Energy Package.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
1 THE THIRD ENERGY PACKAGE – THE ENERGY COMMUNITY APPROACH Energy Community Secretariat 20 th Forum of the Croatian Energy Association and WEC National.
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
Creating a Single European Energy Market – the Regulatory Perspective London, 30. January 2007 ERGEG Electricity Regional Initiative Central-East Europe.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Co-ordination of Decisions at Regional and European level.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
Bucharest, 24 October 2008 Making the third package work in practice Wolfgang Urbantschitsch, E-Control.
EUROPEAN COMMISSION Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas Third Package Progress GIE conference
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Introduction FUI SG Conference – Dublin 16 June 2010 Martin Crouch Partner – European Strategy.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Nigel Sisman,
European Commission views on intra-day and balancing markets
CESEC Energy Community Project Monitoring
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
GRI NW European Energy Work Plan 2011 – 2014 Robert Spencer 20th Madrid Forum, 26 September 2011.
The 3rd package for the internal energy market
FlorenceForum November 2008
GRI-S : Infrastructures The Union list of projects of common interest
Gas Regional Initiative
GRI NW European Energy Work Plan 2011 – 2014
ACER’s view on the future role of the Gas Regional Initiative
Update on European Network Codes
CESEC Energy Community Project Monitoring
ACER opinion on ENTSOG’s 2011 Ten-Year Network Development Plan
GRI NW European Energy Work Plan 2011 – 2014
ACER’s view on the future role of the Gas Regional Initiative
Presentation transcript:

09/12/2011 NWE Stakeholders Group meeting-London Getting to 2014 A contribution from the Regional Initiatives Process Christophe Gence-Creux Head of the Electricity Department, ACER

09/12/2011 NWE Stakeholders Group meeting-London  The Birth of ACER  Role of Framework Guidelines and Network Codes  Role of Regional Initiatives  Progress to Date and Challenges to Come  The Way Forward Outline

. ACER was officially opened in Ljubljana on 3 March at the same time as the Third Energy Package entered into force. In fact, after an initial phase in Brussels, ACER has been operating in its Seat in Ljubljana since 1 February 2011 We are here! The Birth of ACER 09/12/2011 NWE Stakeholders Group meeting-London

Steven GORDONOlga BORISSOVA ACER Internal Structure Director Electricity Department Gas Department Administration Department Christophe GENCE-CREUX Alberto POTOTSCHNIG 09/12/2011 NWE Stakeholders Group meeting-London

Staff Recruitment Plan 09/12/2011 NWE Stakeholders Group meeting-London

Nationality Composition of ACER Staff (in office or already appointed on 1 December 2011, including SNEs) 09/12/2011 NWE Stakeholders Group meeting-London

ACER’s Mission “The purpose of the Agency shall be to assist the [NRAs] in exercising, at Community level, the regulatory tasks performed in the Member States and, where necessary, to coordinate their action”. Article 1(2), Regulation (EC) No. 713/2009 ACER is NOT a European Energy Regulator!. Regulatory powers are still in the hands of the National Regulatory Authorities (NRAs). In fact, the 3 rd package has reinforced the role and powers of the NRAs. ACER only has “residual” regulatory powers 09/12/2011 NWE Stakeholders Group meeting-London

ACER’s Activities Types of acts which ACER can adopt Opinions and recommendations TSOs NRAs EP Council Commission Individual decisions in specific cases (residual power) 09/12/2011 NWE Stakeholders Group meeting-London

Building-up the Internal Electricity Market TYNDP, EIP and Inter-TSO Compensation mechanism TYNDP, EIP and Inter-TSO Compensation mechanism Framework Guidelines and Network Codes Framework Guidelines and Network Codes Regional Initiative process Regional Initiative process Market Monitoring Market Monitoring TYNDP, EIP and Inter-TSO Compensation mechanism TYNDP, EIP and Inter-TSO Compensation mechanism Framework Guidelines and Network Codes Framework Guidelines and Network Codes Regional Initiative process Regional Initiative process Market Monitoring Market Monitoring Priorities in Electricity for /12/2011 NWE Stakeholders Group meeting-London

A strong momentum… “The internal market should be completed by 2014 so as to allow gas and electricity to flow freely.” European Council - 4 February Conclusions on Energy (paragraph 4) 09/12/2011 NWE Stakeholders Group meeting-London

…for a clear target Balancing Markets Internal Electricity Market Adequate Network Development (EU TYNDP and EIP) TSO/ISO/ITO Unbundling Strengthened powers and independence for NRAs Higher coordination requirements (ACER & ENTSO-E) Long-Term Capacity Allocation Day-Ahead Capacity Allocation Capacity Calculation Intraday Capacity Allocation 09/12/2011 NWE Stakeholders Group meeting-London

 The Birth of ACER  Role of Framework Guidelines and Network Codes  Role of Regional Initiatives  Progress to Date and Challenges to Come  The Way Forward Outline 09/12/2011 NWE Stakeholders Group meeting-London

Process description. General timeline as set out in Reg. (EC) 714/ /12/2011 NWE Stakeholders Group meeting-London

Framework Guidelines SCOPING & DRAFTING BALANCINGBALANCING End of August: 1 st Exerts group meeting 24 th October: workshop in Ljubljana Public consultation expected for Q Final FG expected for mid-2012 PUBLIC CONSULTATION SYSTEM OPERATIONSYSTEM OPERATION Public consultation ended 15 September 2011 Final version expected for 31 st December 2011 FINAL VERSION GRID CONNECTIONGRID CONNECTION (20 July 2011) CAPACITY ALLOCATION & CONGESTION MANAGEMENTCAPACITY ALLOCATION & CONGESTION MANAGEMENT (1 August 2011) 09/12/2011 NWE Stakeholders Group meeting-London

Framework Guidelines and Network Codes FG/NC on Grid Connection FG FG/NC on Capacity Allocation and Congestion Management FG/NC on Balancing FG/NC on System Operation WS NC EVCOMITOLOGY FG NC CC, DA, ID Forward EV COMITOLOGY FG NC EV COMITOLOGY Op. Security Op. Plann/Sched. LFC, Reserves FGNCEV COMITOLOGY FG/NC on Third Party Access FGNCEV COMITOLOGY ACERENTSO-EEP - ECEV = Evaluation on NC NC 09/12/2011 NWE Stakeholders Group meeting-London

 The Birth of ACER  Role of Framework Guidelines and Network Codes  Role of Regional Initiatives  Progress to Date and Challenges to Come  The Way Forward Outline 09/12/2011 NWE Stakeholders Group meeting-London

A new impetus to the market integration process (1) project-orientedproject lead regulators  More project-oriented, with newly designated project lead regulators  Focus on the CACM target models implementation : 4 key priority projects4 key priority projects Pan-European cross-regional roadmaps as the main reference for the market integration process, complementing the FG/NC process  Stronger Pan-European dimension, with the elaboration of ambitious but realistic cross-regional roadmaps as the main reference for the market integration process, complementing the FG/NC process  To identify key milestones and accountabilities  To ensure consistency & coherence Role of Regional Initiatives 09/12/2011 NWE Stakeholders Group meeting-London

A new impetus to the market integration process (2) Stakeholders’ involvement  Stronger Stakeholders’ involvement (AESAG and regional consultations) to keep the strong momentum and maintain confidence throughout the process adequate governance  More adequate governance to support the implementation process  Involvement of MS when appropriate and necessary  Close follow-up to identify any obstacles, delays or inconsistencies with the FG/NC  More efficient decision-making process (ACER’s residual power for cross-border issues) Role of Regional Initiatives 09/12/2011 NWE Stakeholders Group meeting-London

 The Birth of ACER  Role of Framework Guidelines and Network Codes  Role of Regional Initiatives  Progress to Date and Challenges to Come  The Way Forward Outline 09/12/2011 NWE Stakeholders Group meeting-London

Cross-regional roadmap on Market Coupling Progress to Date and Challenges to Come Progress to Date and Challenges to Come Progress to DateChallenges to Come ENTSO-E and EuroPEX’s strong commitment to implement a Pan-European Market Coupling solution Translating this commitment into concrete and detailed implementation project for the implementation of the NWE project by end of 2012 Selection by EuroPEX of the starting point for the PCR algorithm Validation by ENTSO-E and Endorsement by NRAs of: The starting point for the PCR algorithm The interim flexible NWE high-level governance arrangements The cost-sharing principles between NWE and non-NWE countries 09/12/2011 NWE Stakeholders Group meeting-London

Cross-regional roadmap on Intraday Progress to Date and Challenges to Come Progress to Date and Challenges to Come Progress to DateChallenges to Come ENTSO-E and Europex agreement on detailed technical solution for border-by- border implementation in 2012 Border-by-border implementation of a common intraday solution, linking the Nordic, Central West, South West and FUI electricity regions in 2012 ENTSO-E and EuroPEX’s strong commitment to implement a Pan-European cross-border Intraday mechanism Design and implementation of pan- European intraday target model by /12/2011 NWE Stakeholders Group meeting-London

 The Birth of ACER  Role of Framework Guidelines and Network Codes  Role of Regional Initiatives  Progress to Date and Challenges to Come  The Way Forward Outline 09/12/2011 NWE Stakeholders Group meeting-London

Key ingredients for success?  Endorsement  Endorsement of cross-regional roadmaps by the Florence Forum  True commitment EUregionalthroughout the implementation phase  True commitment of key stakeholders (NRAs, TSOs, PXs) both at EU and regional level throughout the implementation phase  Continuous support and involvement of all stakeholders  Continuous support and involvement of all stakeholders (AESAG process and regional Fora)  Regular and transparent reporting  Regular and transparent reporting on progress and challenges: Quarterly reports, Annual Status review and Florence Fora 09/12/2011 NWE Stakeholders Group meeting-London

Thank you for your attention!

Regulators’ statement  Energy Regulators welcome the work made under the Regional Initiatives and AESAG’s umbrella  Energy Regulators fully support the four priority projects and the designation of project lead-Regulators to steer the implementation process  Energy Regulators fully support the contents, steps and milestones included in the cross-regional roadmaps as a valuable tool in the push to achieve the single European electricity market  Energy Regulators express their formal commitment to the effort needed to deliver the cross-regional roadmaps 09/12/2011 NWE Stakeholders Group meeting-London

The IEM: A Clear Vision Balancing Markets Internal Electricity Market Adequate Network Development (EU TYNDP and EIP) TSO/ISO/ITO Unbundling Strengthened powers and independence for NRAs Higher coordination requirements (ACER & ENTSO-E) Long-Term Capacity Allocation Day-Ahead Capacity Allocation Capacity Calculation Intraday Capacity Allocation 09/12/2011 NWE Stakeholders Group meeting-London