KBS-3H Initial State Lucoex Workshop: Installation, closure and initial state May 13-14, 2014 Antti Öhberg.

Slides:



Advertisements
Similar presentations
1.
Advertisements

Proposed Amendments to Chapter 32, Article V, Solid Waste Management Ordinance Case No. PH-ORD-041 Presented by the Orange County Environmental Protection.
Slide 1 Insert your own content. Slide 2 Insert your own content.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 3.1 Chapter 3.
Commonly Misspelled Words a-d A Write On Activity.
Swiss Federal Nuclear Safety Inspectorate (HSK) Nuclear Waste Management in Europe – and the Swiss Model EPP-ED Hearing on the Future of Nuclear Waste.
Chemistry2.2.
Chemistry.
Density 3.4.
0 - 0.
Addition Facts
Empty Box Problems Subtraction = 3 If you start on 6 and jump back 3 spaces you land on
Moisture Measurement 1 Challenges in determination the Moisturecontent of woody biomass.
IAEA International Atomic Energy Agency Introductions; Objectives and Scope of the Course Tr aining course on Authorization and Inspection of Uranium Mining.
Zonal & Station Identification Systems
Slide 1 of 26 Chemistry. © Copyright Pearson Prentice Hall Slide 2 of 26 Properties of Matter Bamboo has properties that make it a good choice for use.
Why you need to dry natural gas for fueling applications Saturday, 26 September,
D:\data\PowerPoint\Maravic\NCP-EURATOM Meeting - CCAB ppt Slide 1 National Contact Points for EURATOM- Information Exchange Meeting October 16,
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
SituationGantt Chart Brainstorm:Design Brief Page 1 GCSE Product DesignYour NameCandidate Number.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Properties of Exponents
Lithuanian concept for disposal of
FP7-Fission LUCOEX Large Underground Concept EXperiments Project Progress Meeting 14th May 2014 WP5 Quality Control of Buffer Installation.
1 st Review Meeting, Brussels 5/12/12 – WP7 (P. Paganelli, Bluegreen) iCargo 1st Review Meeting Brussels 5/12/12 WP7 Business Models, Assessment.
Addition 1’s to 20.
Optimisation of New Build Spent Fuel Management and Disposal Peter Haslam Public Policy Advisor Nuclear Industry Association 25 January 2011.
Test B, 100 Subtraction Facts
Unit 4: Mass, Weight & Density
Week 1.
Unit 14 Assessment Objective Three. Unit 14 Assessment Objective Three.
Edward Downer Elementary School Playfield Renovation Status Update 10/14/14.
Adam H. Levin AHL Consulting May 14, BWR – Boiling Water Reactor DOE – Department of Energy DSC – Dry Storage Canister ISF – Interim Storage Facility.
The Measuring Process:
1 Continental Industries Partnering with. 2 Outline  Who We Are & What We Do  What We Can Do Together.
EURADWASTE´04 Large-scale Experiments in Underground Research Laboratories Experience in EBS Engineering Development and Handling Feasibility Christer.
Yucca Mountain Yucca mountain was a proposed site for the disposal of high level nuclear waste. It is in South Nevada, adjacent to the Nevada Test Site.
Contents Problem Description Objectives Definitions Experimental Work Results and Discussion Conclusion Recommendation.
The SKB Spent Fuel Disposal Project – License Application
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
Posiva Oy Olkiluoto Eurajoki Puh. (02) 8372 (31) faksi (02) DOPAS Demonstration of Plugs and Seals Posiva Plug Experiment POPLU at URCF.
LUCOEX Large Underground Concept EXperiments 2011 – 2014 Work Package 5 KBS-3V Emplacement tests in ONKALO Progress and Plans Project Progress Meeting.
1 Modelling Task 8 EBS Task Force Meeting 16, Lund, 28 November 2012 Dr. David Holton Dr. Steven Baxter
Overview of SR-Can; Äspö Task Force meeting Jan 17 th 2007 Overview of the safety assessment SR-Can Allan Hedin, SKB.
Handling of Future Human Actions in the safety assessment SR-Site Eva Andersson.
Managing deviations from the Design Target with the Safety Case IAEA GEOSAF II Plenary 2014.
1 Spent fuel (SF), a radioactive waste, is often buried underground in canisters for disposal. As it decays, SF generates high heat and raises the temperature.
高階核廢終極處置的基本信念:人不能勝天 Rocky Lai 10/05/2015. High-level radioactive waste management in Sweden 10 operating nuclear reactors that produce about 45% of its.
ILW disposal in the UK Presentation at IAEA TM-45865, September 2013 Cherry Tweed – Chief Scientific Advisor.
Geotechnical Engineering
EXPERIMENTAL RESEARCH ON NUCLEAR WASTE DISPOSAL Disposal of Spent Nuclear Fuel from NPP Krško Tine LOGONDER.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Nuclear Engineering Division Argonne National Laboratory.
An identifiable path of a point moving in space. It can vary in width, direction, and length.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Borehole drilling.
1 António Pereira Fysikum The backend of the nuclear fuel cycle in Sweden.
1 Waste volumes and categories Low active waste Medium active waste High active waste Short livedCategory A Category C Long livedCategory B Category C.
Faculty Of Civil engineering department BMCET,SURAT.
Mining Wastes Wilbert Aureo.
Repository scale two-phase flow migration of 14C in the preliminary design phase of French Cigéo project Eloi Treille, Jacques Wendling Andra, 1/7 rue.
Title Subtitle Name / institution Date / Location Logo
Safety Case Components and Documentation
Joint WG on Guidance for an Integrated Transport and Storage Safety Case for Dual Purpose Casks TM TM to Produce Consolidated Drafts of the IAEA’s.
Jiří Slovák, Vítězslav Duda
Radioactive Waste and Spent Fuel Management in Hungary
Title Subtitle Name / institution Date / Location Logo
Introduction: IAEA activities / Documents on human intrusion
TM TM on the Safe Disposal of Intermediate Level Waste
Research, Development and Demonstration Projects at the Josef Underground Laboratory J. Stastka, J. Pacovsky, Czech Technical University in Prague, Prague,
Handling of Future Human Actions in the safety assessment SR-Site
Presentation transcript:

KBS-3H Initial State Lucoex Workshop: Installation, closure and initial state May 13-14, 2014 Antti Öhberg

Content KBS-3H, basic outlining Structure and description of the disposal system Initial state of the disposal system –Initial state definition for the KBS-3H EBS components Supercontainer Buffer and filling components Drift Plug –Underground openings Deposition Drift –Host Rock –Surface environment 2

KBS-3H DEPOSITION DRIFT 3 KBS-3H drift including two compartments separated by Compartment plug

STRUCTURE OF DISPOSAL SYSTEM 4

DESCRIPTION OF THE DISPOSAL SYSTEM 5 Description of the KBS-3H Disposal System is part of the Safety Case portfolio for a KBS-3H type spent nuclear fuel repository The objective of this report will be to present the initial state of the KBS-3H Disposal System for Safety Case Work

INITIAL STATE 6 Initial state is a starting point for assessing long-term (post-closure) processes To be defined separately for different parts of the disposal system –Surface environment –Host rock –EBS –Spent fuel The background reports for Performance Assessment: –Design basis –Description of the site: Site Description and Biosphere Description –Production Lines (3H specific) Buffer and Filling Components Underground Openings Plugs Supercontainer –Production Lines (common with 3V) –Description of the Disposal System evolution (Description of Initial State)

INITIAL STATE FOR EBS COMPONENT 7 In principle, the initial state is a range of conditions prevailing at the time of emplacement that meet the requirements set in the Design Basis. The Initial State of a component in a repository can be defined as follows: –“the state when the direct control over that specific part of the system ceases and only limited information can be made available on the subsequent development of conditions in that part of the system or its near-field”. Conditions for each component vary in time and space, due to the time of emplacement and due to the tolerances set for the compositions, geometries and other properties depending on the component.

DEFINITION OF INITIAL STATE FOR EBS COMP. 8 It is expected that the Initial State has been achieved as described in the design. The Initial State is defined by giving the ranges to the properties: –Geometries –Compositions –Other properties

INITIAL STATE/DESIGN OF SUPERCONTAINER 9

10 The assembly of the Supercontainer in the reloading station is done in an industrial process in a controlled environment, which is likely to be more consistent than “manual” emplacement of canister, backfill and buffer separately. A reduced amount of human involvement in the deposition process which is preferable and should result in small deviations and high quality. KBS-3H includes more prefabricated industrial components

INITIAL STATE/DESIGN OF SUPERCONTAINER 11 Reloading station/ Assembly hall

INITIAL STATE/DESIGN OF SUPERCONTAINER 12 Reference design of Supercontainer

INITIAL STATE/DESIGN OF BUFFER AND FILLING COMPONENTS 13 The following requirements on the design of the buffer must be fulfilled: –The montmorillonite content of the dry buffer material shall be %. –The content of organic carbon of the buffer material should be less than 1 wt-% –The sulphide content of the buffer material should not exceed 0.5 weight percent of the total mass –The total sulphur content of the buffer material (including the sulphide) should not exceed 1 wt-% –The density of the buffer shall be between 1950 < ρm <2050 kg/m3 after saturation –The minimum thickness of the buffer around the canister in any direction should not be less than 350 mm after saturation –The buffer shall be possible to manufacture and install with high reliability.

INITIAL STATE/DESIGN OF BUFFER AND FILLING COMPONENTS 14 Reference design of buffer blocks inside Supercontainer

INITIAL STATE/DESIGN OF BUFFER AND FILLING COMPONENTS 15 Reference buffer block outside Supercontainer i.e. Distance Block

INITIAL STATE/DESIGN OF BUFFER AND FILLING COMPONENTS 16 Design of Filling Blocks

INITIAL STATE/DESIGN OF BUFFER AND FILLING COMPONENTS 17 Nomogram presenting the dimensioning of the filling block as a function of the angle between drift axis and the fracture plane in three different inflow range categories, with specific respect distances. The length of the distance block that has been used in this case is m.

INITIAL STATE/DESIGN OF PLUGS 18 Design of Drift Plug

INITIAL STATE/DESIGN OF PLUGS 19 FEM-analysis parameter values for the drift plug design based on titanium alloy grade 12

INITIAL STATE/DESIGN OF UNDERGROUND OPENINGS 20 –Geometry (outcome) –The properties of host rock after excavation but before installation of other EBS components –Timing of Initial state is dependent on the timetable of the excavation –The initial state of the near-field rock and, to some extent, the broader geosphere, is determined - or at least constrained - by the rock suitability classification (RSC - still under development) that are applied in locating suitable rock volumes for repository construction and for canister deposition. The initial state of the geosphere will differ from the undisturbed conditions in the bedrock due to the effects of repository construction –Description of Initial State includes also Inventory of foreign materials

INITIAL STATE/DESIGN OF DRIFT 21 The mechanical excavation (full face reaming of the pilot holes by push reaming) of deposition drifts will also be more consistent than the “manual” excavation of deposition tunnels. In the horizontal variant using artificial water filling will also ensure a better defined initial state, which is beneficial for evaluating long-term safety aspects. The nominal drift diameter is 1,850 mm with an allowed increase of 5 mm. Further quality requirements in the KBS-3H drift, which originate from transport technique of the supercontainers are as follows: –The maximum allowed deviation from the theoretical centre line of the drift at the end of the deposition drift (300 meters) is < 2 meters in total, which includes all horizontal and vertical deviation components. –The maximum allowed waviness from the centre line is ± 10 mm over the length of the supercontainer (6 m). –The maximum allowed roughness is ≤ 5 mm over a length of 1 meter. –The deposition drift must have an inclination angle of 2º ± 1º upwards towards the end of drift; the larger inclination is favorable for muck flushing

ARTIFICIAL WATER FILLING 22 A favourable initial state of saturation is obtained by using DAWE (Drainage, Artificial Watering and air Evacuation) design methodology. After artificial water filling the buffer should swell uniformly and fill all the open space. The bentonite should have sealed the drift so that there is no flow inside the drift that can cause piping and transport of bentonite. The artificial water filling system is required to fill all void spaces in the drift compartment at approximately the same time, thus ensuring that the bentonite will swell and seal the drift uniformly. This minimizes the risk of bentonite piping and erosion, as well as water pressure displacement of distance blocks and/or Supercontainers during the saturation phase after sealing of the drift.

INITIAL STATE: HOST ROCK 23 The Initial State of the host rock is the state before construction works starts (base line conditions) –Geology –Thermal and mechanical properties –Seismic activity –Hydrology –Hydrogeochemistry

INITIAL STATE: SURFACE ENVIRONMENT 24 The Initial State of the Surface Environment defined according to current conditions (start of the deposition) –Climate –Land uplift –Soil –Forests and marshes –Shallow groundwaters –Water systems –Flora and fauna –Interactions with bedrock –Human actions and land use