Shell Energy Europe Copyright: Shell Energy Europe B.V. What do we do in the GRI NW during the interim phase? GRI NW Region Conference, The Hague, The.

Slides:



Advertisements
Similar presentations
Impact Assessment in the policy cycle at the European Commission
Advertisements

A 2030 framework for climate and energy policies Marten Westrup
This is an audio-enhanced PowerPoint presentation. To hear the audio, please open this presentation in Slide Show view. Changes to the National Flood.
CHI 2014 Case Study Copyright notice A very compelling and concise title expressing the essence of your case study Optional subtitle in a smaller font.
4th Poverty Reduction Strategies Forum Athens, June 27 th, 2007 Regional Energy market in Southeast Europe: Prospects and challenges for the SEE countries.
DG Energy and Transport, European Commission Fabrizio Barbaso 16/04/2008 EU ENERGY SECURITY STRATEGIES ARF Energy Security Seminar EUROPEAN COMMISSION.
Tier One Standards Update Steve Rueckert Director – Standards and Compliance Joint Guidance Committee Meeting January 23-24, 2007 Salt Lake City, Utah.
Pécs Midterm review of the achievements of the Hungarian Presidency of the Council of the European Union András Rozmer Department of Strategy.
The Future of the Strategy with regard to the Outermost Regions - Brussels, 15 May 2008Note: document not legally binding 1 José RUIZ ESPI RTD.K.3 New.
Directorate General for Energy and Transport Next steps in developing the regional energy market in South East Europe European Commission DG Energy and.
NALAS General Assembly December Bucharest, Romania Solid Waste Management Task Force Activities Report.
HUNGARIAN EU PRESIDENCY EXPECTATIONS TOWARDS THE ESPON 2013 PROGRAMME ESPON INFO DAY HUNGARIAN PRESIDENCY IN 2011 Tamás DÖMÖTÖR, PhD – Ministry of the.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Solving Expressions You will have 20 seconds to complete each of the following 10 questions. A chime will sound when the next problem appears. Good luck!
Bundesverband der Energie- und Wasserwirtschaft e. V. From Virtual (test) case to implementation Panel on way forward with Recommendations.
Andrea Mariottini Riello Gas Boilers Division
3 Logic The Study of What’s True or False or Somewhere in Between.
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
ENTSOG’s view on next steps for regional co-operation Nigel Sisman Senior Adviser Stakeholder Group, GRI NW, Brussels, 26 Nov 2010.
Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
David Halldearn Energy Market Insights Limited 5 July 2010.
Future role of GRI NW Stakeholder Group Meeting The Hague, 7 may 2010 Peter Plug Chairman of GRI NW.
TSO Transparency project Gas Regional Initiative North West Ofgem, Great Britain Regional Co-ordination Committee 18th February 2011.
Prof. Dr. Tamás Mészáros, Rector Prof. Dr. Tamás Mészáros Rector, Corvinus University of Budapest „Expanding Europe”, Pécs, October 2010 Sustainability.
Hubbard County, Minn. Classification and Compensation Study Update GREG MANGOLD| AUGUST 5, 2014.
Completing the EU internal energy market IFIEC, 22 November 2011
GSE Aggregated Stock Inventory Recent and upcoming developments NW GRI 5th Stakeholder Group Meeting 9 June 2009, Paris Mylène Poitou GIE Executive Secretary.
GRIP South South Region Gas Regional Investment Plans SGRI – 23 September2013.
Macro-regions in the EU - towards a Danube Strategy
MoU Implementation Jill Murray CER 28 th August 2008.
GRI-S : Infrastructures The Union list of projects of common interest European Commission DG Energy Internal Market I: Networks and Regional Initiatives.
ACER’s view on the future role of the Gas Regional Initiative Dennis Hesseling Head of the Gas Department, ACER 11 th Stakeholders group meeting of GRI.
Electricity Regional Initiative Central Eastern European Region Draft Report on Transparency for the CEE-Region Dr. Frank-Peter Hansen Bundesnetzagentur.
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
© 2007 E.ON Nexus AQ Requirements To support the current business processes We need to maintain performance and enable market operation as is using current.
SG MEETING GRI NW– 28 N OVEMBER 2013 Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the.
REMIT in practice: data collection, market monitoring and stakeholder responsibilities Erik Rakhou Seconded National expert, Market Monitoring Department.
 TYNDP assessmentFindings for NW region  ResilienceDenmark/Sweden, Luxembourg  Supply dependencySouth of France  Network adaptabilityno issues  Supply.
Preparation of the 9th Stakeholder Group meeting Programme Office RCC meeting, 9 September 2011.
NOTES: FIND POLYNOMIALS OF LEAST DEGREE AND K October 23 rd, 2012.
Directie Toezicht Energie, Bonn WS 8 february Bonn 1 SG Workshop: Secondary markets for interconnection capacity: way to adress contractual congestion.
Weekly Attendance by Class w/e 6 th September 2013.
GRI NW Stakeholder Group Meeting – 25 November 2011 GRI NW Stakeholder Group Meeting 25 November 2011 Kristóf Kovács The 2014 target and the role of the.
Completing the EU internal energy market
Senior Representative EFET Gas The NW Gas Regional Initiative The Hague, 4 June 2010 The Scope of Gas Regional Investment Plans Author The.
Madrid Forum 15 October 2014 Massimo Ricci Chairman.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Lord Mogg Chair of ERGEG Florence Forum June 2009 Implementation of the Third Energy Package.
Gas Regional Initiatives Getting to 2014 Steven Gordon Head of the Gas Department, ACER 8 th GRI Co-ordination Meeting Brussels, 27 th February 2012.
European Transparency Requirements – Draft Mod Transmission Workstream 4 th September 2008.
Click to edit Master title style 1 5 th GRI Coordination meeting Brussels, 25 th October 2011.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Co-ordination of Decisions at Regional and European level.
Bucharest, 24 October 2008 Making the third package work in practice Wolfgang Urbantschitsch, E-Control.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
European Federation of Energy Traders GIE annual conference 2008 Bukarest, October Needs of the market participants with respect to creating an integrated.
Introduction FUI SG Conference – Dublin 16 June 2010 Martin Crouch Partner – European Strategy.
Gas Regional Initiative North West Region - Short Term Capacity 7th Stakeholder Group Meeting The Hague – 6 and 7 May 2010.
Gas Regional Initiative – North West Region Governmental Meeting 6 May 2010 – The Hague Secondary capacity markets Project update Betsy ANNEN – CRE Bernhard.
ENTI : ENtrepreneurship Through Innovation in Epirus (Innovative Actions, under the ERDF ) WORKING GROUP FOR TOURISM JOHN SWARBROOKE Ioannina,
GTE+ progress towards ENTSOG Jacques Laurelut GTE President & GTE+ Transition Manager GIE Annual Conference 2008, Bucharest.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
7th Stakeholder Group meeting The Hague – 07 May 2010 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer, E.ON.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
1 GRI NW Investment project in progress Cross-border gas transmission‏ Update on Investment project I1 GRI NW Focus at Virtual Test (Business Simulation)
How will the 3rd Energy Package Impact GRI NW ?
METS 2013 Philip Hammerstein
Presentation transcript:

Shell Energy Europe Copyright: Shell Energy Europe B.V. What do we do in the GRI NW during the interim phase? GRI NW Region Conference, The Hague, The Netherlands, 23/24 October 2007 Walter Schaefer, Shell Energy Europe B.V.

10/12/2014 Slide 2 Shell – Presentation – W Schaefer.ppt Some Fundamentals The 3 rd package needs to be discussed (and probably changed in the process), adopted and implemented. This will take time. Based on past experience the whole process will take three to five years. We all are operating in the gas market today and have to deal with today’s issues.

10/12/2014 Slide 3 Shell – Presentation – W Schaefer.ppt Way Forward We should continue to address issues based on the existing legal framework. We should take a wholly pragmatic view on how we continue with the work in the GRI. We should continue to address concrete topics and solve concrete problems. We should continue with a process that involves all stakeholders. We should do a reality check on project plans and timelines.

10/12/2014 Slide 4 Shell – Presentation – W Schaefer.ppt Thank You