Emergency Services Workshop UK VoIP 999/112s John Medland – BT 999/112 Policy Manager.

Slides:



Advertisements
Similar presentations
Emergency Services Workshop
Advertisements

BTs Plans for its NGN EU Open Workshop on NGN Policy and Regulatory Issues 22 June 2005 Ittai Hershman Director, 21CN Commercial Development BT Wholesale.
Workshop on Telecommunications for Disaster Relief, February 2003, Geneva Dag Nielsen & Catherine Mulligan Ericsson Response WLAN in Disaster and.
Current thinking. Subject to change. October 2011 BENEFITS OF BUILDING AN IN-HOUSE CONTENT DISTRIBUTION NETWORK (CDN)
11 Ofcom Consumer Switching final statement Next steps for BT Bev Bytheway-Jackson WBC Product Manager 10 th February 2014.
VoIP - Australian Regulatory Practice and Directions Duncan MacAuslan Task Coordinator - VoIP ITP Training September 2006.
IETF ECRIT SDO Emergency Services Coordination Workshop 5 & 6 Oct 2006 – New York Alain Van Gaever DG Information Society & Media European Commission.
NENA 2008 Breakout Session Template
CP Networking1 WAN and Internet Access. CP Networking2 Introduction What is Wide Area Networking? What is Wide Area Networking? How Internet.
Geneva, Switzerland, 2 June 2014 The UK experience and approach to damage mitigation Huw Saunders, Director, Network Infrastructure, Ofcom
Out of Jurisdiction Emergency Routing draft-winterbottom-ecrit-priv-loc-01.txt James Winterbottom, Hannes Tschofenig, Laura Liess.
Issue: 1.1 on 23 rd April 2008 Code of Practice: Annex B Effective use of checker tools This document provides comprehensive guidance for CP/SPs regarding.
©Ofcom A regulatory perspective on FTTx deployments Chinyelu Onwurah, Head of Telecoms Technology, Ofcom 19 th June 2007 FTTx Summit.
©Ofcom Voice – the need to take a long term view on sector evolution Chris Rowsell 18 October 2007.
Presents H.323 Forum ETSI TIPHON Presented by: Richard Brennan - Telxxis LLC Vice-Chair ETSI-TIPHON.
Thank you.
1 mec ACCC 2004 Regulation Conference July, 2004 Competition in a IP World Martin Cave Warwick Business School
Long Term Definition Because the VoIP world is SO different from the current environment, we have to go back to basic requirements: –Identify a call as.
Interconnection and Regulation of IP-Networks Ass. Sven Tschoepe, LL.M 15/5/04 ITS 15th Biennial Conference Berlin, Germany September, Internationalisation.
Next Generation Access: A Global / Policy Perspective Maury D. Shenk 27 June 2007.
Animated slides – showing jumpering changes and product architecture for WLR, LLU, SLU and GEA.
6. Next Generation Networks A. Transition to NGN B
VoIP – Case Studies Duncan MacAuslan Task Coordinator - VoIP ITP Training September 2006.
Ernst Langmantel Technical Director, Austrian Regulatory Authority for Broadcasting and Telecommunication (RTR GmbH) The opinions expressed in this presentation.
January 24-27, 2006 Ft. Lauderdale, FL E9-1-1 Technical Solutions Timothy Lorello SVP, Chief Marketing Officer TeleCommunication Systems.
NICC Review ~ 2003 Bill Hawkins NICC Operational Plan Continued “austerity” regime, focus on –Commercial imperatives –Regulatory critical issues.
MSO Access Network Alerts 17 th December Background  Objective – Update on the success of a pilot to identify Major Service Outages in the access.
©OTA O TA Office of the Telecommunications Adjudicator 1 11/10/20041 High Level Review and Status of Activities under the Telecommunications Adjudicator.
ADSL Broadband how it works the local network the bigger picture the local picture Julian Pratt Openreach.
ESW – May 2010 UK Architecture for VoIP 999/112s John Medland – BT 999/112 Policy Manager.
SEPARATING THE TRANSPORT LAYER, LEVELING THE PLAYING FIELD? Chris Witteman, Staff Counsel* California Public Utilities Commission *These.
Copyright 2002, S.D. Personick. All Rights Reserved.1 Telecommunications Networking II Topic 17 Introduction to the Internet Ref: “Computer Networks” by.
Going faster and staying in control - Building the world’s biggest NGN Tim Hubbard Head of Technology Futures.
What now for the telecom industry
NGNs – Network Nirvana? David Goldie, Chairman. This document is uncontrolled if printed or saved to a non-authorised site. Slide 2 Opal, the B2B division.
National Institute of Science & Technology Voice Over Digital Subscriber Line (VoDSL) Vinay TibrewalEE [1] VoDSL: Next Generation Voice Solution.
Property of TERA Consultants CONSULTANTS T E R A IDATE– Workshop Lessons from Tunis (22 November 2005) TERA Consultants 32 rue des Jeûneurs PARIS.
NGN INTERCONNECT WORKING GROUP 4 April 2005 Update on the TSG Project Plan and Technical Work Paul Griffin – Network Architect, Energis Nick Ireland –
Surftime Industry Forum 21/12/99. OFTEL Internet Forum BT SurfTime BT Announcement on 7 December Possibilities from new Network Approach NTS remains for.
© Copyright 2007 Arbinet-thexchange, Inc. All Rights Reserved. VoIP Peering Pilot Using the Internet2 Backbone.
NGN Interconnect Update JOINING THE THREADS 25 May 2005 FOR WG DISCUSSION ON 3 JUNE.
Introduction to 21CN Resilience Tim Hubbard Head of 21CN Solutions Strategy.
1 TOT to NGN By Dr. Kamthon Waithayakul EVP, Office of Engineering TOT Plc.
COMP514 – ADSL.
2004 APPA Community Broadband Conference Emerging Technologies: Voice Over IP October 11, 2004 Tim Hoolihan V.P. Marketing and Product Management (949)
A Routing Extension for HELD draft-winterbottom-ecrit-priv-loc-04 James Winterbottom Hannes Tschofenig Laura Liess.
Internet telephony
25/11/2015 ITU-T NGN - Progress and Plans Brian Moore Lucent Technologies Chairman of ITU-T Study Group 13 1GSC-9, Seoul SOURCE:ITU-T TITLE:ITU-T NGN -
16 th November 2011 NICC Standards Ltd Open Forum NICC Standards Progress update 16 th November 2011 Professor Sir John O’Reilly.
Jackie Voss Manager, Global Standards Development ATIS All-IP Transition Initiatives December 1, 2015.
Colombo, Sri Lanka, 7-10 April 2009 FORUM ON NEXT GENERATION STANDARDIZATION (Colombo, Sri Lanka, 7-10 April 2009) Session Moderator Ghassem Koleyni An.
Emergency Services Workshop, 21th-24 th of October, Vienna, Austria Page 1 IP-Based Emergency Applications and Services for Next Generation Networks PEACE.
The public information campaign to communicate about the process of migration to BT’s next generation network Version 14 – 03 November 2008 Information.
Next Generation Networks Australian Communications Industry Forum (ACIF) ITU-T NGN Workshop, July 2003 Peter Darling Manager, ACIF NGN Project.
October 10-13, 2006 San Diego Convention Center, San Diego California VoIP Myth Busters Jim Shepard Executive Vice President HBF.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
MSAN Industry Experts Group 4 November 2005 Martin Whewell openreach Product Design.
- D1 - FT/Networks and Carriers Division ITU-T WORKSHOP on NGN (Geneva 9-10 July 2003) NGN an architecture for 21st century networks? ITU-T NGN Workshop.
DSL Services : Deployment and Economics The EgyNet Experience Ahmad Khaled Sallam Network Planning Manager EgyNet.
Revision Unit 1 – The Online World Online Services Online Documents Online Communication Cloud Computing The Internet Internet Infrastructure Internet.
January 2014 NICC Standards Ltd UKNOF Jan 2014 NICC Standards Paul Rosbotham Director, NICC
©Ofcom EU Communications package : State of Implementation Kip Meek, Senior Partner, Content & Competition Brussels, 30 May 2005.
IP Telephony (VoIP).
Sub-Loop Extension Service (SLES)
Delivering telecare services during the transition to “all IP”
Open Forum th November 2016.
Open Forum th November 2015.
Multimedia issues : Industry perspective (part I)
IP and NGN Projects in ITU-T Jean-Yves Cochennec France Telecom SG13 Vice Chair Workshop on Satellites in IP and Multimedia - Geneva, 9-11 December 2002.
Comments on PAR and 5C Date: Authors: March 2010
Presentation transcript:

Emergency Services Workshop UK VoIP 999/112s John Medland – BT 999/112 Policy Manager

UK Emergency Service today BT or CW Public Ntwk (PSTN) Other Networks BT or CW Operator Centres PSTN Police 56% Ambulance 35% Fire 8% Coastguard <1% 999/112/ (222 Local Controls) BT – 28m calls, 50% mobile, every call voice + location

Handling VoIP 999/112 now Reach Call Centres through PSTN/IP Gateways Identified as VoIP Registered address accessed through tel number Name and address marked as needing confirmation Verbal routing………. Devices/CPE use PSTN/GSM for 999 if possible Key issues for VoIP 112/999 : - provision of 112/999 access - registered name and address data kept up to date (end-user->CP1->CP2 to PSTN and PSAP) - 24 hour VSP contact point for PSAP use (tracing, alternative contacts) - lack of information to PSAP for nomadic users (definition of nomadic) - end user education - how to Automate Location provision………

NICC Task Group The Network Interoperabilty Consultative Committee : NICC is a UK telecommunications industry committee which acts as an industry consensus group in which specifications and technical issues associated with network competition can be discussed. It also is a source of advice to the Director General of Telecommunications on the harmonisation of interconnection arrangements Location Task Group : Routing 999/112 for VoIP to correct local EA with VoIP caller location information Membership : ITSPA, ISPA, BT, C&W, Ericssons, Huawei, Andrew, ETSI, Gradwell, Magrathea, Thus, Truphone, IN UK, Virgin Media and Ofcom +…. Approach :- - VSP, ISP and Access Provider(s) all different - Start with DSL and than tackle Cable, WiFI and GSM scenarios - Standards still developing (use wherever possible, eg IETF, ETSI) - Start with UK only (but need to allow for International dimension) - Don’t rely on user - Don’t rely on device (at least for next 2/3 years)

VPC Access LIS VoIP call CLI + VSP1 id VSP 1 Soft-Switch Emergency Handling Authority(EHA) Authority[PSAP] Internet service & access infrastructure providers PIG CLI + VSP1 id Source IP, VSP 1 ID and CLI information IAIC (BGP) Request using CLI, VSP id. Response gives location x 1 c b y ISP LIS Log-on functions SBC2 d PSTN—IP Gateway VSP 2 soft switch (Aggregation + interconnect ) a SBC1 Functional Architecture – work in progress

BTW BB BTR 999 or C&W 999BTR ISP & Other ISPs Network Transit ProvidersVoice Service Provider Layers involved User Network Attachment Network Attachment VoIP Registration 112 Call 112 Call +CLI112 Call +CLI + II digits CLI + IP Address IP Adrs -> Locn Req CLI->IP Adrs Locn Req BTOR / LLU ANP EHA/PSAP ISP VSP DSLAM,BRAS, RADIUS,(LAC) LNS, RADIUS Copper loop

Implications Yes, automated routing and location provision is technically feasible (for ADSL case) but will imply :- New requirements on all organisations (systems development) Many more organisations involved to deliver 112 (not just traditional telcos but VSPs and ISPs) New operational components : LIS and VPC New interfaces for all organisations: based on international standards as far as possible (eg IETF HELD) Increased co-op between PSAP and VSP, ISP and Access networks Detailed document is now going through NICC review process …………………..

Challenges to adoption ISPs storing and updating association of IP/Line ID/ location at an ISP LIS LIS cascades to access providers and length of response times ANPs storing and updating association of (IP)Line IDs/ location at ANP LIS Challenging business cases (!) unless regulatory driven Current regulatory responsibility unclear when several CPs and an ISP involved

Further Challenges National solutions are being developed National solutions will need to evolve to cover international IP roamers Long transition periods with hybrid TDM/IP services Multimedia calls : all organisations need clear 112 requirements driven by users (112Net?)

Next Steps Next Steps :- - Finalise basic architecture and BB ADSL scenario detail - Continued work on other UK scenarios (Cable, LLU, Private networks) - International Scenarios - IP end-to-end (as NGN, PSAP +device capabilities become clear)

Openreach Backhaul & Aggregation Wholesaler ISP Emergency Services Centre Locn Req (IP adrs) Locn Resp (Postal Adrs) New Provide (Instn Adrs) Customer New Provide (Instn Adrs) New Provide (Instn Adrs) Confirm (SID OR ) Confirm (SID W ) PPP Login Login OK + IP Adrs Login OK + IP Adrs LIS SID W -Instn Adrs LIS IP->SID W New Provide IP- SID W

Openreach Backhaul & Aggregation Wholesaler ISP Emergency Services Centre Locn Req (IP adrs) Locn Req (IP adrs) Locn Resp (Postal Adrs) Locn Resp (Postal Adrs) New Provide (Instn Adrs) Customer New Provide (Instn Adrs) New Provide (Instn Adrs) Confirm (SiD OR ) Confirm (SID W ) LIS Relay PPP Login Login OK + IP Adrs Login OK + IP Adrs LIS SID OR ->Instn Adrs LIS IP Adrs->SID OR New Provide (case B)

Current UK industry structure WLR Broadband; Calls SMPF / MPF Broadband Telephone line & calls Services: CPS; broadband Infrastructure End User reseller Retail CP Network (Access) Provider Eg Openreach Wholesale CP Automated B2B systems & processes currently (just about) support this