Monitored Data CSTS, CCSDS 922.1-W-0.17 28-31 October 2013 San Antonio, Texas, USA John Pietras Global Science and Technology, Inc., Greenbelt, MD, USA.

Slides:



Advertisements
Similar presentations
Appendix The SAMIEE / MD Dashboard – Step-by-Step Configuration Membership Development WebcastSlide 1 Prepared by: Helen Shiminsky MGA Information Process.
Advertisements

1 Introducing the Specifications of the Metro Ethernet Forum.
State of New Jersey Department of Health and Senior Services Patient Safety Reporting System Module 2 – New Event Entry.
Integrify 5.0 Tutorial : Creating a New Process
HORIZONT TWS/WebAdmin TWS/WebAdmin for Distributed
John Pietras 16 October 2008 Berlin Tracking Data Cross Support Transfer Service Status.
Drinking Water Regulation Revisions June Overview Regulation revisions are only to the state portion of the regulations No new federal rules are.
Copyright © 2013 by John Wiley & Sons. All rights reserved. HOW TO CREATE LINKED LISTS FROM SCRATCH CHAPTER Slides by Rick Giles 16 Only Linked List Part.
SGSS Extensions to and Modifications of CCSDS Space Communication Cross Support Service Management October 2012 John Pietras Global Science and.
Status of Extensible SCCS-SM Concept Green Book 12 February
Monitored Data CSTS, CCSDS W April 2013 Bordeaux, France John Pietras Global Science and Technology, Inc., Greenbelt, MD, USA.
Electronic Research Administration The National Institutes of Health, Office of Extramural Research Financial Conflict of Interest (FCOI) Notification.
CIP Cyber Security – Security Management Controls
1 24 April 2009 SMWG SMWG Closing Report Colorado Springs, Colorado, USA 24 April 2009.
1 June 2010 Cross Support Transfer Services (CSTS) Overview.
Stoimen Stoimenov QA Engineer SitefinityLeads,SitefinityTeam6 Telerik QA Academy Telerik QA Academy.
Buffered Data Processing Procedure Version of Comments MG / CCSDS Fall Meeting 2012 Recap on Previous Discussions Queue overflow processing.
Cross Support Transfer Services – Service Control Service March 2015 Pasadena, California, USA John Pietras Global Science and Technology, Inc, Greenbelt,
07/19/04 NorCal OAUG Training Day, Paper 2.4 John Peters, JRPJR, Inc.1 Oracle Workflow Notifications John Peters JRPJR, Inc.
Module 8: Server Management. Overview Server-level and instance-level resources such as memory and processes Database-level resources such as logical.
CSSM Meeting Summary Fall 2012 Meetings 15 – 18 October E. Barkley Chair (NASA/JPL) C. Haddow Co-Chair (ESA/ESOC) Cleveland, Ohio, USA.
Template v5 October 12, Copyright © Infor. All Rights Reserved. 1 Warehouse Mobility for LN An Overview Swaroop Patnaik, Infor.
Copyright © 2006 Pilothouse Consulting Inc. All rights reserved. Definitions Collaboration – working together on team projects and sharing information,
The PROGRESS Grid Service Provider Maciej Bogdański Portals & Portlets 2003 Edinburgh, July 14th-17th.
Cross Support Services Area Cross Support Transfer Services Working Group Strawman Forward Frame CSTS Specification Technical Note (June 2010) John Pietras.
Triggers A Quick Reference and Summary BIT 275. Triggers SQL code permits you to access only one table for an INSERT, UPDATE, or DELETE statement. The.
Intended Recipient and Folder Subscription (DSUB extension) 9th January, 2013 Mauro Zanardini (consorzio Arsenàl.IT)
Overview of Functional Resources for IOAG Service Catalog Services 15 April 2013 Bordeaux, France John Pietras Global Science and Technology, Inc., Greenbelt,
1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
1 W.Hell (ESA) November 2014 SLE Pink Books SLE Pink Books Summary of the Updates November 2014.
A description of how the lifecycles built within U PlanIT align with the project management methodology as defined by the IT PPO. Next © 2009 IT Project.
Configuring Workflows Module 4. Overview  Understanding Workflows  Using Default Workflows  Creating Workflow Instances.
Cross Support Services Area Cross Support Transfer Service Working Group Monitored Data Cross Support Transfer Service: Scope and Format of Monitored Data.
1 Control Room Habitability Program James A. Carlson, Omaha Public Power District, Author Deep Ghosh, Southern Nuclear Operating Greg Holbrooks, PE, Duke.
Comments from Simplified PROCESS-DATA Exercise John Pietras CSTSWG Berlin May, 2011.
Module 8: Managing Software Distribution. Collections Packages Programs Advertisements Collections Packages Programs Advertisements How Software.
Mike Graves Summer 2005 University of Texas at Dallas Implicit Invocation: The Task Control Architecture Mike Graves CS6362 Term Paper Dr. Lawrence Chung.
Tracking Data CSTS v March - 3 April 2014 Noordwijkerhout, Netherlands John Pietras Global Science and Technology, Inc, Greenbelt, MD, USA.
1 W.Hell (ESA) March 2015 Service Specification Framework Service Specification Framework Changes since Red-2 March 2015.
1 W.Hell (ESA) March / April 2014 CSTS Specification Framework CSTS Specification Framework Changes since San Antonio March / April 2013.
Cross Support Transfer Services - Tracking Data Service 0.10 (in progress) March 2015 London, United Kingdom John Pietras Global Science and Technology,
Abstract Modeling of Service Package Result Components 31 March – 3 April 2014 Noordwijkerhout, Netherlands John Pietras Global Science and Technology,
1 Y.Doat (ESA) March 2015 Guidelines Status Guidelines Status CSTS Framework March 2015.
SIP PUBLISH Method Jonathan Rosenberg dynamicsoft.
Considerations for the Service Package Request/Service Package Recommended Standard October 2013 San Antonio, TX John Pietras Global Science and.
CSTS Generic Procedures Assessment of the Current Status and Proposal for Next Steps M.Goetzelmann
Functional Resources in Service Management and Service Package Execution CSSA Cleveland, Ohio October 2012 John Pietras GST, Inc.
Module 6: Administering Reporting Services. Overview Server Administration Performance and Reliability Monitoring Database Administration Security Administration.
MD CSTS prototype status 2012 : MD user (NASA) based on NASA Fw development MD provider (CNES) based on ESA Fw development NASA/ESA Fw interoperability.
CSA WG Meeting 17 May 2011 Page 1 Berlin, Germany CSA WG Service Agreement Status Prepared by Hugh Kelliher Space ConneXions Limited
1 W.Hell (ESA) November 2015 FR Model and Registry Considerations FR Model and Registry Considerations November 2015.
1 Nov. 9, 2015 CSTS Forward Frame Service Work Plan T. Pham Nov. 9, 2015.
1 Y.Doat (ESA) April 2012 Object Identifiers Object Identifiers CSTS Framework Annex C April 2012.
DICOMwebTM 2015 Conference & Hands-on Workshop University of Pennsylvania, Philadelphia, PA September 10-11, 2015 DICOMweb Workflow API (UPS-RS) Jonathan.
DHCP-DNS Interaction Bernie Volz IETF-61, DHC WG.
Fall Meeting, November 11, 2015 Paul Pechkam, JPL/NASA
1 Management of Offline SLE Services SLe-SM Red-1 RID GSFC-09-JP John Pietras.
Cross Support Services Area Functional Resource Identifiers in SCCS-SM Information Entities John Pietras London, UK October 2010.
SharePoint 101 – An Overview of SharePoint 2010, 2013 and Office 365
Systems Analysis and Design
Global Science and Technology, Inc., Greenbelt, MD, USA
Kumiko Ono End-to-middle Security in SIP draft-ietf-sipping-e2m-sec-reqs-04 draft-ono-sipping-end2middle-security-03 Kumiko Ono.
Delegates and Events 14: Delegates and Events
Subscribing to YANG datastore push updates draft-netconf-yang-push-00 IETF #94 Yokohama A. Clemm A. Gonzalez Prieto
Service Specification Framework
Guideline prepared by the Veterinary Harmonisation Group
Object-Oriented Programming
Key concepts of authorization, QoS, and policy control
ISO/IEC (MFI-6) Scope definition & Document Structure
Expert Group on Delegated and Implementing Acts for the ESI funds
Presentation transcript:

Monitored Data CSTS, CCSDS W October 2013 San Antonio, Texas, USA John Pietras Global Science and Technology, Inc., Greenbelt, MD, USA

Sources of Changes Since Bordeaux  CSTSWG determination that the standard scope of a Functional Resource Label, Parameter Label, Event Label, and Directive Label is limited to the functional resources directly involved with the production and provision of the CSTS that uses the procedure  Exceptions to this standard scope require extended procedures to re-define the scope and associated behavior  MD-CSTS is an exception to the standard behavior  Individual parameter/event labels and Functional Resource Labels can now be used in subscriptions  Removal of max numbers of monitorable parameters, notifiable events, and gettable parameters 2

3 Summary of Changes Since the V0.13 (Version Immediately Prior to Bordeaux) (1 of 2)  Operational Scenario (2.5) significantly extended to illustrate use of labels and Functional Resource Types  Cyclic Report, Information Query, and Notification procedures change from adopted to extended (refined and extended for Notification) (3.0)  New section 4 for MD Cyclic Report extended procedure  Modifies standard Cyclic Report behavior for a Parameter Label in a list-of-parameters, named list, or default list in a START invocation to apply to “every instance of the parameter identified by that Parameter Label for all instances of its associated Functional Resource Type that are configured as part of the Service Package”  Modifies standard Cyclic Report behavior for a Functional Resource Type in the list-of-parameters in a START invocation to apply to “every instance of each parameter for that Functional Resource Type for all instances of that Functional Resource Type that are configured as part of the Service Package”  New section 5 for MD Information Query extended procedure  Modifies standard Information Query behavior for a Parameter Label in a list-of-parameters, named list, or default list in a GET invocation similar to that done in the MD Cyclic Report  Modifies standard Information Query behavior for a Functional Resource Type in a list-of-parameters in a GET invocation similar to that done in the MC Cyclic Report  New section 6 for MD Notification extended procedure  Modifies standard Notification behavior for an Event Label in a list-of-events, named list, or default list in a START invocation similar to that done in the MD Cyclic Report  Modifies standard Notification behavior for a Functional Resource Type in a list-of-parameters in a START invocation similar to that done in the MC Cyclic Report  Refines the scope of production status to apply to “production resources associated with collecting all monitored parameters and event notifications”

Summary of Changes Since the V0.13 (Version Immediately Prior to Bordeaux) (2 of 2)  In Managed Information section (7), remove requirements for casting of now-nonexistent configuration parameters as managed parameters  max number of parameters (MD Cyclic Report)  max number of events (MD Notification)  max number of gettable parameters (MD Information Query)  Monitored Parameters and Notifiable Events section deleted  All specification delegated to SANA  Procedure Identifiers added to Service Object Identifiers Module (Annex A)  monDataCyclicReport OBJECT IDENTIFIER::= {monitoredDataServiceProcedures 1}  monDataInfoQuery OBJECT IDENTIFIER::= {monitoredDataServiceProcedures 2}  monDataNotification OBJECT IDENTIFIER::= {monitoredDataServiceProcedures 3} 4

Remaining Tasks Prior to Submission for Red Book Review  Construct informative Annex C (Functional Type, Monitored Parameter and Notifiable Event Definitions) in conformance with the documentation style and content that will be used to document theses entities on SANA  Add PICS Proforma 5