Monogram Program Oversight Board Status and Proposed Path Forward for the ECS API Summer Standards Conference Westminster, Colorado June 26, 2009.

Slides:



Advertisements
Similar presentations
Establishing a Civil Society Advisory Group and Accelerated Global Learning on Forests, Livelihoods and Climate Change.
Advertisements

CompatibL Technologies FpML Cashflows Engine for ISDA.
Parallel Flow Visualization/Mitigation Proposal
Product Stewardship Recommendations Report Solid Waste Management Coordinating Board January 28, 2009.
World Class Standards TC SCP TEC Status Report to TC SCP Plenary #55 Paul JOLIVET, Chairman, LG Electronics Sebastian HANS, Vice chairman, Oracle SCP(12)
Starting Planning for the 2010 Policy Key Issues Notes for the TAC Executive Committee April 8, 2009 Phil Hattis, AIAA VP for Public Policy.
WECC TEPPC – March 25, 2010 Proposed Revisions to PCC Regional Planning Document 1 Proposed Revisions to Overview of Policies and Procedures for Regional.
Reliability Center Data Request Task Force Report WECC Board Meeting April 2009.
1 Establishing Performance Indicators in Support of The Illinois Commitment Presented to the Illinois Board of Higher Education December 11, 2001.
Forest Carbon Partnership Facility Progress with Due Diligence Activities in Panama Participants Committee Meeting (FCPF PC5) La Lopé National Park, Gabon.
Working Together to Prepare Illinois School Leaders Initiative School Leader Advisory Council March 27, 2009.
Presentation of the proposed Annex 19 – Safety Management
45th CIML Meeting, Orlando
Item #16 California Measure SB375: Linking Greenhouse Gas Emissions Reductions to Metropolitan Transportation Planning Presentation to the National Capital.
1 INAC First Nation Education Policy Framework Regional Dialogues Coordinated by AFN and INAC Education Policy Framework - Joint Steering Committee (EPF-JSC)
General Insurance Statistical Agency (GISA) Presentation to Ontario Conference of Casualty Actuaries November 9, 2005.
Single European Sky 1 CAeM Technical Conference Single European Sky and the Impacts for Aeronautical Met Services Geneva 21 November 2006.
SC 18 Ad Hoc Task Group API Staff Issues Ed Durante, Chair.
Proposed Second Amended Interlocal Agreement for Public School Facility Planning School Board of Broward County, Florida Presented By: The Growth Management.
Draft Action Plan Update – Agenda Item No. 5D Central Valley Flood Protection Board.
Breach of a Requirement of the Code Marisa Orbea New York 19 June 2012.
Chesapeake Bay Program Goal Development, Governance, and Alignment Carin Bisland, GIT6 Vice Chair.
Chesapeake Bay Program Goal Development, Governance, and Alignment Carin Bisland, GIT6 Vice Chair.
January 20, 2015 City Council Meeting. Purpose Council direction on moving forward with: Housing linkage fee in short term based on 2009 Study and existing.
Presentation to SMG 7 June 2011 Michele Shoebridge and Jonathan Barry.
Product Lifecycle Management
1 Canadian Celiac Association Governance Workshop May 2009.
California Integrated Waste Management Board 1 Agenda Item 14 Consideration of Streamlining Grant Processes to Enhance Program Efficiency January 17, 2006.
Standards Governance Update Budget Overview SC Chair Rotation 2010 E&P Summer Standards Conference July 2, 2010 Washington, DC.
AHIMA & PHDSC A Transformational Alliance. CONFIDENTIAL AHIMA Background  Professional association founded in 1928 as the Association of Record Librarians.
Board of County Commissioners May 8, Authorize staff to prepare a draft ordinance revising Chapter 37 of the Alachua County Code to include specific.
API Monogram Program Monogram Program Staff – SC Liaison Report
Progress on Coordinating CBP and Federal Leadership Goals, Outcomes, and Actions Principals’ Staff Committee Meeting 2/16/12 Carin Bisland, Associate Director.
Policy Oversight Committee Update Board of Directors Meeting June 25-26, 2012 Stuart C. Sweet, MD, PhD.
Summer Flounder Amendment August 13, 2014 Washington, DC Review of Revised Draft Scoping Document.
1 Asset Management Steering Committee Briefing on Senate Bill 408 (Access Management) August 2013 Harold Lasley, P.E. Access Management Program.
Update on the API Work Group Activities on Pipe Markings.
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
A Strawman for Discussion by Dottie Stockstill & Greg Ramon Special ERCOT Board Meeting June 24, 2003.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
Mark Ruane ERCOT Vice President of Credit and Enterprise Risk Management Dodd-Frank Act Exemption Update Technical Advisory Committee May 5, 2011 Bill.
DGS Recommendations to the Governor’s Task Force on Contracting & Procurement Review Report Overview August 12, 2002.
Executive Board Meeting October 14, 2009 Washington DC Role of the ICP Executive Board Michel Mouyelo-Katoula Global Manager International Comparison Program.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC-18 Liaison Report TG-3: Definition of.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
EXEMPT MEET AND CONFER PROPOSALS PRESENTATION Presented by Dr. Daisy Rodriguez Pitel ACES President, Exempt Employee Chief Spokesperson Dr. Darla Zirbes.
CEDR TD Management PG2 – Planning the Network Task M3/M8 Status Report for Executive Board 19 June 2008.
San Francisco, CA. SC8 Liaison Report
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience Product Lifecycle Management.
1 SCHOOL SITE COUNCIL. 2 Purpose: School Site Council The organization by which the school community comes together to chart the school’s path to improvement.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
Outline Introduction Current Approaches for Regulating Activity Overview of Recent Study Sessions and Rulemaking Current Activity in Adams County Recent.
API - OGP Task Force Update API 2013 Winter Standards Meeting January, 2013 Presented by: Dan Mueller Vice-Chairman API CSOEM.
Avian and Human Influenza Trust Fund (AHITF) Status Report 28 th March 2006.
API SPEC Q2 FOR AUDITING API MONOGRAM PROGRAM BOARD UPDATE TO SC16 Stacey W. Hagen ExxonMobil Development Company API Monogram Program Board Liaison to.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
CBP Biennial Strategy Review System
Updates from SC18 Summer Meeting
زبان بدن Body Language.
D2 NIS REVIEW PROCESS March 2014: Draft Manual endorsed by WG GES
Specification on float equipment
First 8 slides are what was presented in San Fransisco…
GRADUATE COUNCIL Iowa State University
Resilience Framework Mark Lauby, Senior Vice President and Chief Reliability Officer WIRES Winter Meeting February 15, 2018.
National FFA 2012 Revision Inservice.
API 10 F.
1915(c) WAIVER REDESIGN 2019 Brain Injury Summit
SC 18 Liaison Report Winter 2012
Float Equipment API Spec 10F
Presentation transcript:

Monogram Program Oversight Board Status and Proposed Path Forward for the ECS API Summer Standards Conference Westminster, Colorado June 26, 2009

Existing Situation Monogram Program [M.P.] –Part of Certifications Group at API –Fiduciary Oversight by GCSP –Unclear Policy Oversight (e.g., C4/SC18) ECS responsible for managing M.P. Revise S1 to Address Proposed Oversight of the M.P.

Monogram Program Oversight Support SC18 Retaining Quality Issues: –Definition of What Constitutes “Manufacturing” –Uniformity of Welding Requirements –Monogram Marking Issues (Spec Q1, Annex A) –Other New Work Items on Quality Issues Support M. P. Oversight Body: –“Guest-Host” Types of Issues –Program Advisories –Other Activities that Impact Licensee’s Ability to Meet the License Agreement or Program Requirements

Monogram Program Oversight (cont’d) Monogram Program Board: –Proposed Oversight Language for Board Activities Developed by SC18 (TG3) –Final Language to be Developed by ECS –Final Language to be Integrated into S1 –Value-Add Elevates Policy Issues to ECS to be Considered at Company Level

Path Forward Options for Proposing Board Roles and Responsibilities –ECS Charges API Staff –ECS Charges Ad Hoc Work Group (C. Williams) What –Seek Input from ECS –Addresses the Needs of All SCs Why –To Provide Consistency with Other similar Oversight Groups within Certifications

Path Forward API Staff/Ad Hoc Group Recommendation to ECS by 9/2009 New Board Established (10/2009) First Board Meeting (before next Standards Conference in January 2010) First Report back to ECS at January 2010 Standards Conference