BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

NERC Policies Introduction
Future Ancillary Services (AS) Workshop
1 Balloting/Handling Negative Votes September 11, 2006 ASTM Training Session Bob Morgan Brynn Iwanowski.
1 Balloting/Handling Negative Votes September 22 nd and 24 th, 2009 ASTM Virtual Training Session Christine DeJong Joe Koury.
1 Standards Development: An Overview Discovery to Delivery Topic Committee Meeting October 30, 2007 Karen A. Wetzel NISO Standards Program Manager
Business Practices Subcommittee Update April 30, 2013.
Business Practices Subcommittee Update October 23, 2012 DRAFT.
Business Practices Subcommittee Update August 17, 2010.
NAESB Coordinate Interchange Version 1 Standard Revision 1, Draft 5 August, 2005.
NAESB Coordinate Interchange
Business Practices Subcommittee Update October 26, 2010.
Business Practices Subcommittee Update February 2, 2010.
National Thousands Block Number Pooling Services NANC Meeting January 13, 2004.
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
PJM© PJM DOCs # Frequency Response Drafting Team Frequency Response Background Frequency Response Standard History Briefing on Frequency Response.
Frequency Responsive Reserve Process Update
Report of the Operating Committee Don Watkins Operating Committee Chair April 28, 2009.
Process for Developing and Approving WECC Regional Criteria Preschedule Process Regional Criteria Drafting Team Meeting Conference Call - Webinar October.
WECC Response to BAL-002-WECC-1 Remand Order December 10, 2010 WECC Board of Directors Meeting Steve Rueckert Director of Standards.
1 Compliance Report WECC Board of Directors Meeting December 7-8, 2006 Steve Rueckert Director, Standards and Compliance.
BAL-002-WECC-1 Contingency Reserves
Market Interface Committee Recent Regulatory Activities Philip Tice October 14, 2011.
Status of NERC Standards Activity Joint Guidance Committee Meeting January 23-24, 2007 Steve Rueckert - WECC Director, Standards and Compliance.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
The UEA House of Delegates Directing YOUR Association through the democratic process. 1.
FERC Order minute Scheduling.
VOORBLAD.
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
Current Activity Summary
CUG Meeting June 3 – 5 Salt Lake City, UT
W. Shannon Black Manager, Standards Processes Results Based Drafting 2013.
WECC Reliability Based Control Field Trial
Wethersfield Teacher Evaluation and Support Plan
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
25 seconds left…...
School Census Summer 2011 Headlines Version Jim Haywood Product Manager for Statutory Returns.
We will resume in: 25 Minutes.
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Weekly Attendance by Class w/e 6 th September 2013.
North American Electric Reliability Council 1 Coordinate Operations Standard Jason Shaver Standard Drafting Team Chair September 29, 2005.
RAT R1 R2 R3 R4 R5 R6 R7 Fetch Q RS MOB ROB Execute Retire.
STATUS OF BULK ELECTRIC SYSTEM DEFINITION PROJECT
January 9, 2013 BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC.
Don Blackburn Vice Chair
PDCWG Report to ROS August 12, 2010 Sydney Niemeyer.
BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region
Comparison of Governor Deadband & Droop Settings of a Single 600 MW Unit A Hz Deadband with a Straight Line Proportional 5% Droop Curve Compared.
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
Board of Directors Meeting February 26, 2013 Standards, Registration and Certification Report.
1 PDCWG Report to ROS October 13, 2011 Sydney Niemeyer.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
PDCWG Report to ROS David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy.
RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity
BAL-001-TRE-01 ERCOT CPS2 R2 Waiver Regional Variance April 16, 2009 Sydney Niemeyer.
PDCWG Report to ROS Sydney Niemeyer Chair NRG Energy Don Blackburn Vice Chair Luminant Energy.
PDCWG Report to ROS March 11, 2010 Sydney Niemeyer.
BAL-001-TRE-1 CPS2 Waiver FERC-Ordered Modification to ERCOT waiver CPS2 Report to RSC December 16, 2008.
1 Compliance Update June Control Performance Highlights  NERC CPS1 Performance April Performance  April performance comparison April 2007:
Top 10 Questions on Regional Reliability Standards Development Judith A. James Manager, Reliability Standards March 5, 2009 June 2008 TAC.
David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy
WECC Regional Standards Update
Presentation transcript:

BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC October 3, 2012

SAR-003 Standard Drafting Team Name Company Sydney Niemeyer (Chair) NRG Energy Ananth Palani (Vice-Chair) Optim Energy Pamela Zdenek Infigen Energy Vann Weldon ERCOT Brenda Hampton Luminant Sandip Sharma ERCOT (Non-voting SME) BAL-001-TRE-1 RSC October 3, 2012

Requirements Overview Applies to BA, GO and GOP function Provides requirements for: Identifying Frequency Measureable Events (FME) Calculating the Primary Frequency Response (PFR) of each resource in the Region Calculating the Interconnection minimum Frequency Response Monitoring the actual Frequency Response of the Interconnection Setting Governor deadband and droop parameters Providing Primary Frequency Response performance requirements. Importantly, the standard narrows the governor deadband and requires the droop curve to begin at the edge of the deadband with no step function. BAL-001-TRE-1 RSC October 3, 2012

PFR Performance Measures Under this standard, two Primary Frequency Response performance measures are calculated: “initial” and “sustained.” The initial PFR performance (R9) measures the actual response compared to the expected response in the period from 20 to 52 seconds after an FME starts. The sustained PFR performance (R10) measures the best actual response from t(46) to t(60), compared to the expected response at t(46). BAL-001-TRE-1 RSC October 3, 2012

Primary Frequency Response Reference Document This Primary Frequency Response Reference Document is not considered to be a part of the regional standard. This document will be maintained by Texas RE and will be subject to modification as approved by the Texas RE Board of Directors, without being required to go through the formal Standard Development Process. This arrangement provides Regional flexibility in adjusting the technical details of the performance metric calculations. The PFR Reference Document includes flowcharts that detail the calculations BAL-001-TRE-1 RSC October 3, 2012

PFR Reference Document Revision Process A Revision Request may be submitted to the Texas RE Reliability Standards Manager The Reliability Standards Committee (RSC) will consider the request The revision request will be posted in accordance with RSC procedures The RSC shall discuss the revision request in a public meeting, and will accept and consider verbal and written comments pertaining to the request The RSC will make a recommendation to the Texas RE Board of Directors The Board may adopt the revision request, reject it, or adopt it with modifications Any approved revision to the Primary Frequency Response Reference Document shall be filed with NERC and FERC for informational purposes BAL-001-TRE-1 RSC October 3, 2012

Technical Document – Initial Flowchart Overview Read Deadband, Droop, HSL, Capacity and Actual Frequency Calculate Ramp Magnitude Calculate Expected Primary Frequency Response Calculate Actual Primary Frequency Response Calculate P.U. Primary Frequency Response Calculate P.U. Primary Frequency Response Rolling Average No Is Rolling Avg ≥ 0.75 Fail R9 Yes End Pass R9 BAL-001-TRE-1 RSC October 3, 2012

Based on events from June 2011 to June 2012. Field Trial Results 28 generating units were evaluated in the trial, which included 7 coal, 4 gas, 2 simple cycle combustion turbine, 5 wind, and 10 combined cycle units. Based on events from June 2011 to June 2012. No high-frequency events were evaluated. 8-event average was not possible with some units. These results use NEW R10 calculation. BAL-001-TRE-1 RSC October 3, 2012

Field Trial Results – Coal Units BAL-001-TRE-1 RSC October 3, 2012

Field Trial – Gas Units BAL-001-TRE-1 RSC October 3, 2012

Field Trial – Wind Units BAL-001-TRE-1 RSC October 3, 2012

Field Trial – Combined Cycle Units BAL-001-TRE-1 RSC October 3, 2012

Changes Made after Field Trial and Comments Changed Sustained Measure (R10) from average over several minutes to instantaneous at t(46). Too much happens during former averaging window. Added 2 MW limit to the 2% exception criteria. Applies to generators < 100 MW. Moved examples of “legitimate operating conditions that may support exclusion” from Measures to Requirements (R9 and R10). M7 re-written to focus on notice from GO to GOP of change in Governor status. Avoids concern about 24/7 proof issue. Changed deadband setting from 0.01666 to 0.017 Hz. Reformatted R2 to break into sub-requirements. Intend to deal with augmented capacity issue. Duct burners, etc. BAL-001-TRE-1 RSC October 3, 2012

Implementation Plan 12 months after Effective Date The BA must be compliant with Requirement R1 At least 50% of the GO’s generating units/generating facilities must be compliant with Requirement R6 (if >1 unit/facility) At least 50% of the GO’s generating units/generating facilities must be compliant with Requirement R7 (if >1 unit/facility) The GOP must be compliant with Requirement R8 18 months after Effective Date The BA must be compliant with Requirements R2, R3, R4, and R5 100% of the GO’s generating units/generating facilities must be compliant with Requirement R6 100% of the GO’s generating units/generating facilities must be compliant with Requirement R7 BAL-001-TRE-1 RSC October 3, 2012

Implementation Plan 24 months after Effective Date At least 50% of the GO’s generating units/generating facilities must be compliant with Requirement R9 (if >1 unit/facility) At least 50% of the GO’s generating units/generating facilities must be compliant with Requirement R10 (if >1 unit/facility) 30 months after Effective Date 100% of the GO’s generating units/generating facilities must be compliant with Requirement R9 100% of the GO’s generating units/generating facilities must be compliant with Requirement R10 BAL-001-TRE-1 RSC October 3, 2012

Drafting Team is finishing standard and related documents. Path Forward Drafting Team is finishing standard and related documents. Expect completion in November. (11/7 SDT Mtg.) Submit for RSC approval in November. Can do by e-mail or call a special meeting. Post for Review and Ballot in December – January. Avoid ballot during Holidays. RSC Approves ballot results. TRE Board approval. NERC/FERC process. BAL-001-TRE-1 RSC October 3, 2012

R9: Initial Response Performance - Steam Turbine BAL-001-TRE-1 RSC October 3, 2012

R10: Sustained Response Performance - Steam Turbine BAL-001-TRE-1 RSC October 3, 2012

R9: Initial Response Performance - Steam Turbine BAL-001-TRE-1 RSC October 3, 2012

R10: Sustained Response Performance - Steam Turbine BAL-001-TRE-1 RSC October 3, 2012

R9: Initial Response Performance - Steam Turbine BAL-001-TRE-1 RSC October 3, 2012

R10: Sustained Response Performance - Steam Turbine while Ramping up before and during event BAL-001-TRE-1 RSC October 3, 2012

R9: Initial Response Performance - Combustion Turbine with below standard performance BAL-001-TRE-1 RSC October 3, 2012

R10: Sustained Response Performance – Combustion Turbine with below standard performance BAL-001-TRE-1 RSC October 3, 2012