Mission Statement Trans-Elect, with the support of AES, is committed to expanding America’s electric transmission grid in the furtherance of public policy,

Slides:



Advertisements
Similar presentations
EDISON INTERNATIONAL® SM Water Energy Nexus Charley Wilson Urban Water Institute February 21, 2013.
Advertisements

Regulatory Process and Other Models Arizona Corporation Commission Fifth Biennial Transmission Assessment Commission Decision Workshop on Transmission.
The McGraw-Hill Companies Generation & Transmission Industry Trends Douglas M. Logan, Principal Platts Research & Consulting / RDI Presented to: PES Policy.
The Midwest ISO from a Transmission Owner Perspective.
Report of the Planning Coordination Committee WECC Board Meeting Albuquerque, NM December, 2007.
CPUC Vision for Transmission Planning in the West Dian M. Grueneich, Commissioner California Public Utilities Commission Western Electricity Coordinating.
Central California Clean Energy Transmission Project
Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
1 Report of the Planning Coordination Committee Report to the WECC Annual Meeting April 20, 2006 Robert Jenkins, PCC Chair.
1 Report of the Planning Coordination Committee WECC Board of Directors Meeting April 21, 2006 San Diego, CA.
WV/VA issued permits Forest Service blocked line MN/WI issued permits Land owners sued AZ issued issued permit for TEP line Forest Service did not issue.
Operating Transfer Capability Policy Committee Report Board of Directors Meeting April 21 & 23, 2004 Thomas A. Delawder OTCPC Chair Western Electricity.
Order 2004 Sensitive 1 WECC Phase 1 Rating Process Coordinated Planning and Technical Studies: PCC Presentation on the Avista Interconnection to the PG&E.
Page 1 PCC Meeting October 25, 2007 PCC and TEPPC Coordination of Roles and Responsibilities in Regional Planning Brian Silverstein and Robert Kondziolka.
Setting a New Course for Electricity in Ontario Presented to the WNA Annual Symposium by Milton Caplan 2004 September 8.
1 Bradley Nickell Director of Transmission Planning 10-Year Regional Transmission Plan WECC Overview September 2011.
Order 2000 and PJM: A Natural Match Craig Glazer Manager of Regulatory Affairs PJM Interconnection, LLC.
Symposium on Private Financing for African Power Infrastructure US Treasury Department Washington, DC October 13, 2008.
1 Wyoming Infrastructure Authority November 10, 2009 Superconductor Electricity Pipelines.
© New York Independent System Operator, Inc. All Rights Reserved. New Challenges Facing System Operators Stephen G. Whitley President & Chief.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
South Dakota Energy Infrastructure Authority (SDEIA) Inaugural Meeting of State Infrastructure Authorities Rapid City, SD June 13, 2007.
The Big Picture Discussion with the Wyoming Infrastructure Authority and Joint Minerals Committee Steve Ellenbecker Wyoming Infrastructure Authority.
Wyoming Wind Energy, Transmission and the West Craig Cox Interwest Energy Alliance to Wyoming Infrastructure Authority Board Meeting Casper, Wyoming 10.
Rocky Mountain Area Transmission Study RMATS Economics Economic Comparisons Preliminary: Distribution of Gains and Losses RMATS Steering Committee July.
Financial Incentives to Encourage Wind Power System Production Sasha Kemmet Iowa State University.
Alberta’s Future Electricity Needs: What’s the Real Story? Economic Developers of Alberta Annual Professional Conference April 10, 2014 John Esaiw, Director.
The Need for an Energy Grid in the Maldives
North American Power Group Western Mine-Mouth Coal-Fired Power Two Elk.
Clean, Reliable, and Low Cost Energy for the for theCaribbean December, 2006 Confidential.
May 22-23, 2008 ACC BTA Workshop May 22-23, 2008 Regional Renewable Energy Transmission Initiatives Laurie Woodall K.R. Saline and Associates, PLC Arizona.
Sea Breeze Pacific Regional Transmission System Juan de Fuca Cable & West Coast Cable Keys to West Coast Transmission Progress.
. Juan de Fuca Cable. Safe Harbor Statement Included in this document is certain information which is “forward looking information” as defined by the.
Transmission Incentives P. Kumar Agarwal Acting Director, Division of Reliability & Engineering Services Federal Energy Regulatory Commission U.S. DOE,
Montana Ambassadors Helena, Montana February 25, 2011.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
ENHANCING THE POLICY FRAMEWORK FOR SUSTAINABLE ENERGY INVESTMENT Guidance from the OECD to developing and emerging economies Karim Dahou, Investment Division,
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
Terra-Gen Power, LLC California Renewables Portfolio Standards: Challenges and Opportunities CCPUC Annual Meeting October 5, 2009.
CONFIDENTIAL AND PROPRIETARY Invenergy’s Views on Cogeneration Opportunities Presented to: April 30, 2015.
Charles Hosken, General Manager Imperial Irrigation District
Rocky Mountain Area Transmission Study Connecting the Region Today for the Energy Needs of the Future Rocky Mountain Area Transmission Study Recommendations.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Transmission Expansion in the Western U.S. Transmission Policy, Incentives, and Expansions in the Western States Marcus Wood Stoel Rives LLP 900 SW Fifth.
Approach to the Wind Resource Assessment for the Sixth Power Plan Northwest Power & Conservation Council Generating Resources Advisory Committee August.
GE Energy Financial Services Policy Options Shaping Private Investments in Clean Tech Kevin Walsh Managing Director, Power & Renewables May 1, 2009.
May 30, 2005 Investing in Canadian Power Markets A Sponsor’s Perspective on Debt Financing.
Successful Transmission Planning & Development in the West Kelly Barr Manager, Regulatory Affairs & Contracts Salt River Project Phoenix, Arizona June.
THE TRES AMIGAS PROJECT Project Objective, Business Model, and Benefits -ERCOT Presentation Jan 22, 2010 Austin, Texas UNITING THE NATION’S ELECTRIC POWER.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
High Plains Express Initiative Jerry Vaninetti, Vice President Trans-Elect Development Company, LLC Arizona Corporation Commission Fifth Biennial Transmission.
Challenges in Building Transmission in California Power Association of Northern California P.J. Martinez VP, Engineering Pacific Gas & Electric Company.
CWAG ENERGY CONFERENCE BIG SKY, MT Collaborative Efforts to Find Solutions: A Case Study – The Mountain States Transmission Intertie (MSTI) Presented by.
Integrating More Renewable Energy in the Grid Bert Garvin Vice President, Regulatory Affairs July 21, 2008 NARUC Summer Meeting July 22, 2008.
1 Clean Line Energy National Association of State Utility Consumer Advocates Charleston SC Annual Meeting June 2012.
CIPCO Central Iowa Power Cooperative Iowa Industrial Energy Group April 9, 2013.
Investing Our Energy In You Traverse City Light & Power Electric Generation TCL&P Study Session December 1, 2009.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
Overview of the Grid Randy Manion, Western Area Power Admin. EPA Clean Power Plan Workshops Farmington, NM, December 7 and 8, 2015 Tuba City, AZ, December.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
LS Power LS Power is a power generation and transmission group
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
Phase 3 Solar Feasibility Study Findings and Recommendations
SunZia Project Description
ColumbiaGrid Planning Meeting FERC Order 1000 Activities June 7, 2018
Arizona Public Service Company 2012 Renewable Energy Standard Implementation Plan Arizona Corporation Commission Open Meeting August 17, 2011.
Presentation transcript:

AES Trans-Elect Presentation to WIA Board & State Transmission Authorities Independent Transmission Development in Independent Transmission Development in Support of State Transmission Authorities July 1-2, 2008

Mission Statement Trans-Elect, with the support of AES, is committed to expanding America’s electric transmission grid in the furtherance of public policy, increased reliability, and access to remote resources. As an independent transmission owner, Trans-Elect promotes the regulatory objectives of open, non-discriminatory access to the nation’s electricity system, while providing cost-effective, reliable service and electric grid expansion.

Introduction to AES Trans-Elect AES TE – The Partnership Company Path 15 with Western Area Power Administration and PG&E Wyoming Colorado Intertie with Wyoming Infrastructure Authority High Plains Express with 9 public and private stakeholders TE – Financed over $1 billion in transmission projects TE – Owned and/or Operated nearly 13,000 miles of high voltage transmission

Trans-Elect Development Company LLC The nation’s 1st independent transmission company 2002: Acquired METC (Michigan) and an interest in AltaLink (Alberta) 2004: Developed Path 15 in California 2005: Wyoming-Colorado Intertie Public/Private Partnership Wyoming Infrastructure Authority & Western Area Power Authority 2006: Partnership with AES to develop/acquire transmission 2007: High Plains Express Project: WY-CO-NM-AZ Current Projects: Wyoming-Colorado Intertie High Plains Express Other unannounced projects focused on renewable development Active in public policy development: WREZ, CREZ, WGA Offices in Bethesda, Chicago, and Denver www.trans-elect.com

Path 15 Project Summary Tesla Oregon California Lake Malin Captain Jack COTP AC INTERTIE Tracy DC Vincent Olinda Table Mountain Round Los Banos Gates Path 15 Midway Tahoe San Francisco Public-private partnership with Western (DOE), PG&E, and Trans-Elect 83-mile, 500-kV line to eliminate a long-standing transmission constraint between N-S California Total development cost $250 M for a new 500-kV transmission line and substations FERC approved ROE 13.5% and CAISO is sole customer Construction started in September 2003 with commercial operation December 2004 Trans-Elect’s share of project costs of $194 million were under budget

Michigan Electric Transmission Company Purchase price - $288 million May 1, 2002 Assets - 5,400 miles of transmission lines in Michigan Investors - Trans-Elect as general partner with equity investment from GE Capital. Debt raised by Deutsche Bank and CIBC Seller’s rationale - Strengthen balance sheet and use sale to focus strategy

AltaLink Summary Purchase price - $570 million (C$860 million) on April 29, 2002 Assets - 7,200 miles of transmission lines in Alberta, Canada Investors – Trans-Elect and SNC-Lavalin as 50/50 general partners with equity investments from Ontario Teacher’s Pension Plan Board and Macquarie Bank Seller’s rationale - Become a pure generating company (previously divested distribution assets)

Trans-Elect’s Partner: AES Corporate Overview 28 countries on 5 continents 121 generation plants • 13 utilities Alternative Energy leader 30,000 people worldwide 25 years of project development experience Diverse technologies and fuel mix Entrepreneurial learning culture 7

AES 2006 Financials Net cash from operating activities Revenues Gross margin $12.6 billion $3.6 billion $2.4 billion

Broad global footprint The capacity to serve 100 million people 28 countries 5 continents 116 generation plants 13 distribution businesses 42,000 MW installed generation capacity annual distribution sales of over 73,000 GWh

DC Ties (all ~ 200 MW except ERCOT-E @ 600 MW) Interconnection Boundary

Transmission Authorities fill Gaps in RTO Coverage 11

WECC Transmission Projects Under Development Juan de Fuca Cable BPA transmission Northern Lights Montana Alberta Tie Line Southern Crossing Mountain States Canada –Northwest - California (CNC) Project PacifiCorp Energy Gateway Hemingway to Boardman TransWest Express Project West Coast Cable White Pine-Midpoint Wyoming-Colorado Intertie Project Harry Allen- Robinson Summit En-ti (Ely-Harry Allen) Miracle Mile-Ault Regional Planning Process Path Rating Process Progress Reporting Process High Plain Express Central California Clean Energy Transmission Project Eastern Plains Tehachapi Project Colorado-New Mexico Interconnection Project Lake Elsinore Advanced PSP Navajo Transmission Project Segment 1 Green Path Project IV-San Felipe Indian Hills - Upland SunZia Palo Verde–Devers II Sunrise Powerlink Palo Verde – North Gila II Project

Wyoming Transmission Projects Including Two Public/Private Partnerships involving Trans-Elect (courtesy of the Wyoming Infrastructure Authority)

Wyoming-Colorado Intertie (WCI) Project Recommended by RMATS TOT3 Constraint 6 Lines w/ 1,600 MW Capacity Public/Private Partnership Wyoming Infrastructure Authority, Trans-Elect & WAPA Feasibility Studies Complete Phase 1 WECC path rating Open Season Process July 31 Auction Date ~2013 on-line date WIND 75 miles 230 kV 425 MW 180 miles 345 kV 850 MW New Lines Under Development Existing Lines

WCI Bidding Concept 9th Round 8th Round 7th Round 6th Round 5th Round Capacity Available 850 MW 9th Round 8th Round 7th Round BID PRICES ($/KW-MO) 6th Round 5th Round 4nd Round 3nd Round 2nd Round 1st Round FIRM TRANSMISSION CAPACITY (MW)

PR for WCI

High Plains Express WCI (TE/WIA/WAPA) EPTP (Tri-State/Xcel/WAPA) NM Wind Collector (PNM) SunZia WIND MOU involving 6 utilities, 3 State agencies & Trans-Elect Co-Managers: Xcel & Trans-Elect Feasibility study completed Stage 2 Feasibility Underway Major renewable component 3,500 MW – 500 kV AC $5 billion 1,300 miles across favorable terrain from Wyoming to Arizona Improved reliability in Eastern WECC Benefits to participating states, including consumers WIND WIND WIND WIND SOLAR WIND WIND SOLAR SOLAR

Transmission – A Snapshot After years of under-investment, there’s a resurgence in interest in transmission expansion, driven by... Replacement of aged infrastructure/improved reliability Accessing remote resources, especially renewables Availability of low-cost money Impediments Absence/inconsistent public policy & regional planning Utility/regulatory focus on serving native load Cost allocation & recovery uncertainties Long permitting timelines & complications

Solutions for Regional Transmission Expansion Public Policy National: siting/routing, financial incentives, open access protocols Regional & State: multi-state cooperation, transmission authorities Professional Transmission Development Independent transmission’s exclusive focus on transmission development Commitments needed to build transmission Traditional Model: Utilities to own and/or contract for capacity Emerging Model: Renewable developers, transmission authorities, and customer beneficiaries Facilitated by supportive public policy & regionalized power markets

Change in Fundamentals Perfect Storm Change in Fundamentals Rapid inflation in energy prices Carbon-constrained energy economy Price-competitive renewables Utilities have few incentives for expanding transmission Change/Chaos = Opportunity Transmission authorities are uniquely positioned to effect change Multi-state cooperation in non-RTO areas Western REZ process Take the lead in facilitating transmission expansion Supported by independent transmission developers & public policy

Shared Risk for Transmission Development State Transmission Authorities Focused on renewables Bonding & eminent domain authority Seeding transmission development Business Model State Authorities: political support Trans-Elect: lead development efforts Shared funding and risks, with funds repaid (with uplift) upon project financing Opportunities Short-Term: generator leads & collector systems Longer-Term: trunk lines & regional lines