2011 HOWARD BRANDSTON DESIGN PROJECT Asher Harder Yuduo Zhao 1
Program Solution Results Renovation of historical landmark (old library) Redesigned entrance Addition of contemporary glass and steel canopy and balcony Currently owned by the Public Theater “Devoted to developing and presenting new theatrical work, innovative productions of the classics, and the showcasing of both established and rising musical talent.” Project Description 2011 HB 2
Program Solution Results Facade Respect and highlight neoclassical elements Complementing contemporary glass and steel balcony Evening visibility from the street Illuminate flags Entrance Circulation visibility 5-10fc on horizontal entrance surfaces Design Requirements and considerations: Exterior 2011 HB 3
Program Solution Results Design Requirements and considerations: Interior 2011 HB Lobby Highlight neoclassical detailing Complement contemporary glass and steel balcony Visible and exciting from the exterior Way finding to ticket office, stairs, and theater Illumination requirements: 20 fc 4
Program Solution Results Design Requirements and considerations: Interior 2011 HB Mezzanine Donor wall visible from front door Active gathering space Illumination Requirements: 10fc Ticket office Attract patrons attention Illumination Requirements: 30fc Corridor Attract use by patrons Saturated wall colors Illumination Requirements: 10fc 5
Program Solution Results Inspiration: 2011 HB Interactive lighting design Simple lighting via planes 6
Program Solution Results Overall Concept: 2011 HB Lighting using simple geometric shapes Planes Backlit frosted glass canopy Illuminated flags Graze vertical voids in between three main sections of façade Light top most cornice Lines 7
Program Solution Results Equipment Selection: 2011 HB Exterior 8
Program Solution Results Equipment Selection: 2011 HB Interior 9
Program Solution Results Equipment Selection: 2011 HB Interior 10
Program Solution Results 2011 HB AreaAvg.Avg./Min Lobby Ticket Office Circulation Mezzanine Allowable WattsDesign Watts * *excluding watts from floor “art installation”
Program Solution Results 2011 HB FixtureQuantity Watts per luminaire Total Watts ERCO 17W ERCO 26W Mark Arch Globe FixtureQuantity Watts per luminaire Total Watts Sensacell Panels – Floor Sensacell Panels – Mezz. Ceiling
Program Solution Results 2011 HB Entrance Avg. Illuminance: 4.75fc Average Illuminance adjacent to rails: 9.0fc Allowable WattsDesign Watts
2011 HOWARD BRANDSTON DESIGN PROJECT Asher Harder Yuduo Zhao 14 Thank You! Questions?
2011 HOWARD BRANDSTON DESIGN PROJECT 15 Images: erco.com klicksystems.com louispoulsen.com sensacell.com publictheater.org