The Ohio Department of Transportation 1 I-280 Trench Project Public Meeting Monday, October 20, 2008 Ted Strickland, Ohio Governor James Beasley, P.E./P.S.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advanced Piloting Cruise Plot.
Kapitel 21 Astronomie Autor: Bennett et al. Galaxienentwicklung Kapitel 21 Galaxienentwicklung © Pearson Studium 2010 Folie: 1.
Fig , p Table 10-1, p. 271 Fig , p. 272.
After Baptism, What Then?. Things To Remember... You are a new creature 2Co 5:17; Ro 6:3-4 You are a babe in Christ 1Co 3:1-2; He 5:12-14 You are in a.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
Dennis L. Edwards Tunnel
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
1 MAXIMIZING PUBLIC INVESTMENT Ohio Department of Transportation Highway Funding Overview Julie Ray, Deputy Director Division of Finance & Forecasting.
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
ZMQS ZMQS
TSPLOST Update River Valley Region TIA Citizen’s Panel April 24, 2014.
East Parking Garage Project (Executive Leadership Council) January 31, 2011.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
1 Building Use Study Plattsburgh City School District Advisory Committee Meeting September 18, 2013 Castallo and Silky- Education Consultants Bill Silky.
ABC Technology Project
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
Grade Separation (GS-16) Project. Project Location - Bensenville N.
© S Haughton more than 3?
VOORBLAD.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
Do you have the Maths Factor?. Maths Can you beat this term’s Maths Challenge?
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Project, Cost Schedule, and Work Limits Roadway Character Design Criteria for Bridges Maintenance of Traffic Right-of-Way & Utility Involvement General.
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Addition 1’s to 20.
25 seconds left…...
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
A SMALL TRUTH TO MAKE LIFE 100%
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Essential Cell Biology
How Cells Obtain Energy from Food
CpSc 3220 Designing a Database
Traktor- og motorlære Kapitel 1 1 Kopiering forbudt.
PROJ. 566(17) LOR PID MAJOR WIDENING
Presentation transcript:

The Ohio Department of Transportation 1 I-280 Trench Project Public Meeting Monday, October 20, 2008 Ted Strickland, Ohio Governor James Beasley, P.E./P.S. ODOT Director David R. Dysard, ODOT District Two Deputy Director

ODOT I-475 Salisbury Interchange Modification Presented by: Michael T. Gramza Theresa Pollick Public Information Officer 2 Presented by: David R. Dysard, AICP District Two Deputy Director Michael T. Gramza, P.E., VGCS Project Manager John Crandall Co-Chairman, Tribute Planning Committee I-280 Trench Project Public Meeting

I-280 Trench Project Agenda Trench Project Description Schedule and Traffic Impacts Tribute Park Update with VGCS Tribute Committee The Ohio Department of Transportation 3

I-280 Trench Project Overview Realignment of Front and Summit streets to intersect with the Craig Bridge Work includes… –Reconnecting city streets and North Toledo neighborhoods –Modification of the Craig Bridge –Filling existing trench The Ohio Department of Transportation 4

I-280 Trench Project Overview Cost: $21,245, Contractor: Posen Construction Construction Starts: October 2008 Estimated Completion: Winter 2010 The Ohio Department of Transportation 5

I-280 Trench Project Overview The Ohio Department of Transportation 6

North Side Land Use The Ohio Department of Transportation 7 FORD ROAD

East Side Land Use The Ohio Department of Transportation 8 FORD ROAD

9 The Ohio Department of Transportation Tribute Park Site Plan

The Ohio Department of Transportation 10 From Greenbelt, over Craig Bridge into Tribute Park Craig Bridge: bike lane East side of the bridge: A path to Tribute Park, another under VGCS Along Front Street I-280 Trench Project Bike Paths

I-280 Trench Project Filling the Trench The Ohio Department of Transportation 11 North of the river: Filled to height of existing overpasses South of the river: close to existing Craig Bridge grade Fill dirt will come from: - Summit/I-280 interchange - Woodville Road/I-280 interchange - I-75/I-280 interchange Since 2001 ODOT has stored over 40,000 truck loads of fill as a cost savings measure

I-280 Trench Project Before The Ohio Department of Transportation 12

I-280 Trench Project AFTER The Ohio Department of Transportation 13

I-280 Trench Project Schedule and Time Impacts The Ohio Department of Transportation 14

15 October 14, 2008 to November 2008  Remove existing Erie St. bridge, and build temporary pavement and sidewalk  Detour via Buffalo St., Ontario St., and Buckeye St.  Two-way traffic on Erie St. between Buffalo St. and bridge  Two-way local traffic only on Ash St. and River Place between Superior St. and Summit St. Erie Street The Ohio Department of Transportation

November 2008 to Winter 2009  Local Traffic only on Michigan St. and Ontario St. between Galena St. and Bridges  Local Traffic only on Buffalo St. Between Erie St. and Huron St.  Detours to be coordinated with City of Toledo 16 Michigan, Ontario, Ash and Huron streets The Ohio Department of Transportation

17 November 2008 to Spring 2009  Two-way Traffic on EB Summit St.  NB Craig bridge to EB Summit St. Closed  WB Summit St. to SB Craig bridge closed  Ash St. and River Place closed at Summit St. Summit Street The Ohio Department of Transportation

18 Spring 2009 to Winter 2009  Craig Bridge NB & SB Closed  All Ramps to and from Craig Bridge closed  NB I-280 to WB and EB Front Street open  WB and EB Front Steet to SB I-280 open Front Street and Craig Bridge The Ohio Department of Transportation

19 Spring 2009 to Winter 2009  Craig bridge NB & SB closed  All ramps to and from Craig bridge closed  Close Ash St. and River Pl. at Summit St. Summit Street and Craig Bridge The Ohio Department of Transportation

Spring 2010 to Fall 2010  Rebuild Ash from Ontario to Summit; Completing Huron reconstruction; Completing Erie permanent pavement  Two-way traffic on Erie from Buffalo to work site  Two-way traffic on Superior, Buckeye and Ash  Two-way traffic on River Place between Superior and Summit 20 The Ohio Department of Transportation Erie, Huron and Ash streets

21 Winter 2009 to Winter 2010  Craig Bridge Open  Ramp from NB I-280 to Front St. and ramp from Front St. to SB I-280 will be open  Two-way traffic on new Front St. with minor shifts to construct closure segments of pavement The Ohio Department of Transportation Complete Front Street

22 Winter 2009 to Winter 2010  Craig Bridge Open  Two-way traffic on new Summit Street with minor shifts to construct closure segments of pavement Complete Summit Street The Ohio Department of Transportation

I-280 Trench Project Tribute Park John Crandall Co-Chairman, Tribute Planning Committee The Ohio Department of Transportation 23

I-280 Trench Project Tribute Park A memorial to those who have fallen and all who contributed to the construction of the VGCS Bike Paths through and to the Park Champlain Street bridge and railroad bridge at north end of park to remain The Ohio Department of Transportation 24

25 The Ohio Department of Transportation Tribute Park Site Plan

Questions? The Ohio Department of Transportation 26 Questions?