Process Control Charts VOCABULARY IMPORTANT TERMS: – Nominal: Data at expected value – Discrete: Data with only a finite number of values – Indiscrete:

Slides:



Advertisements
Similar presentations
St. Edward’s University
Advertisements

AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
HOLD UP YOUR BOARD! Chapter 7 Review game.
Lecture Slides Elementary Statistics Eleventh Edition
1 When you see… Find the zeros You think…. 2 To find the zeros...
Measurements and Their Uncertainty 3.1
Making a Line Plot Collect data and put in chronological order
DirectInverseJointVariations Radical Review
L.O.1 To recall multiplication facts up to 10 x 10
Chapter 7 Sampling and Sampling Distributions
Auto-Moto Financial Services- The Old Process
Box and Whiskers with Outliers. Outlier…… An extremely high or an extremely low value in the data set when compared with the rest of the values. The IQR.
Sampling Distributions
Reliability McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
The basics for simulations
Box and Whisker Plots.
Contingency tables enable us to compare one characteristic of the sample, e.g. degree of religious fundamentalism, for groups or subsets of cases defined.
Statistics for Managers Using Microsoft® Excel 5th Edition
Applications Problem Solving. 6/25/2013 Applications 2 Four-step Method 1. Define variables Name the quantities to be found Write these down Example:
Chapter 4 Inference About Process Quality
Created by Mr. Lafferty Maths Dept.
Hours Listening To Music In A Week! David Burgueño, Nestor Garcia, Rodrigo Martinez.
Statistical Quality Control
© 2012 National Heart Foundation of Australia. Slide 2.
Statistical Control Charts
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
Equal or Not. Equal or Not
Statistical Inferences Based on Two Samples
12-2 Conditional Probability Obj: To be able to find conditional probabilities and use formulas and tree diagrams.
Chapter_15.indd 13/17/11 5:25 PM. Chapter_15.indd 23/17/11 5:25 PM.
Experimental Design and Analysis of Variance
Select a time to count down from the clock above
Chapter_3.indd 13/17/11 4:30 PM. Chapter_3.indd 23/17/11 4:30 PM.
Sample questions for iRespond. 1. How many significant digits does have? A.) 1 B.) 2 C.) 4 D.) 5.
Chapter 6 - Statistical Process Control
Control Charts for Variables
Operations Management Statistical Process Control Supplement 6
1 © The McGraw-Hill Companies, Inc., 2006 McGraw-Hill/Irwin Technical Note 9 Process Capability and Statistical Quality Control.
1 Statistics -Quality Control Alan D. Smith Statistics -Quality Control Alan D. Smith.
Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter Seventeen Statistical Quality Control GOALS When.
Agenda Review homework Lecture/discussion Week 10 assignment
Control Charts  Control Charts allow a company’s performance over time to be analyzed by combining performance data, average, range and standard deviation.
Statistical Process Control Managing for Quality Dr. Ron Lembke.
Transparency Masters to accompany Operations Management, 5E (Heizer & Render) 4-20 © 1998 by Prentice Hall, Inc. A Simon & Schuster Company Upper Saddle.
Sexual Activity and the Lifespan of Male Fruitflies
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
TOTAL QUALITY MANAGEMENT (Continuous Quality Improvement)
X-bar and R Control Charts
Quality Control.
Statistical Quality Control/Statistical Process Control
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna 17-1 © 2003 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 17.
Steps in Using the and R Chart
Lesson 7.1 Quality Control Today we will learn to… > use quality control charts to determine if a manufacturing process is out of control.
Statistical Quality Control/Statistical Process Control
Statistical Process Control. A process can be described as a transformation of set of inputs into desired outputs. Inputs PROCESSOutputs What is a process?
 What type of Inspection procedures are in use  Where in the process should inspection take place  How are variations in the process detected before.
Quality Control  Statistical Process Control (SPC)
Basic 7 Tools of Quality Presented by: Rajender Kumar, Asst. Prof.
MOS 3330 Operations Management Professor Burjaw Fall/Winter
Statistical Quality Control
How to use SPC Before implementing SPC or any new quality system, the manufacturing process should be evaluated to determine the main areas of waste. Some.
POPULATION VERSUS SAMPLE
X AND R CHART EXAMPLE IN-CLASS EXERCISE
Optimizing and controlling process through statistical process control
Other Variable Control Charts
What is the point of these sports?
Process Capability.
Statistical Process Control
Presentation transcript:

Process Control Charts

VOCABULARY IMPORTANT TERMS: – Nominal: Data at expected value – Discrete: Data with only a finite number of values – Indiscrete: Data of Acceptable vs. Unacceptable – Variable: Property being measured – Under Control: Variables fall in a nominal range – Data Points: Measurements taken – Datum: A fixed reference point for measurements

Used to test if the process is in control Used to see if significant changes have occurred in the process over time “Indiscrete” or “Continuous Data Chart” or “X- R Chart” Measurement at time intervals Measurements compare the control over time Example units of measurement to Use:  Length (mm) Volume (cc)  Weight (gm.) Power (kwh)  Time (sec, min, hr.) Pressure (psi)  Voltage (v) “Discrete Data Charts” or “PN-P Charts” Inspection on lot or batch of parts; Notation of the number of good and defective parts Variable representation:  The number of parts inspected in the lot = n  Fraction of defective in lot = p  Number of defectives = pn Process Control Charts

In the manufacturing process, car engine valve stems are being machined with a nominal diameter of 13 mm. Samples are taken at the following times of day: 6:00, 10:00, 14:00, 18:00 and 22:00, for 25 consecutive days. The diameter measurements (data) from these samples are presented in the table on the next slide. Classroom Example - R CHART CONSTRUCTION Indiscrete Chart

5

Steps to formulating the chart: Step 1: Collect the data Step 2: Sort the data into subgroups, such as lots, order number, or days Step 3: Identify the values for the variables “n” and “k”, where n = the size of the sub group (i.e., five times) k = the number of sub groups (i.e., 25 days)

Steps to formulating the chart: Step 4: Calculate the mean for each group that will be represented by

Steps to formulating the chart: Step 5: Calculate the range for each subgroup represented by R

Upper & Lower Control Limits 9 Learning how to plot two separate charts: o X Control Chart o R Control Chart The Upper Control Limit and the Lower Control Limit set the tolerance level for the control of the manufacture of a product.

Steps to Calculating the Upper & Lower Control Limits

Continuation of Calculating the Upper & Lower Control Limits

Manufacturing Statistics A 2 is from the table based on the size of the subgroup (i.e., Five reading times) D 4 & D 3 is from the table based on the size of the subgroup (i.e., Five reading times)

∑ x bar∑ R X double bar R barCLxUCLxLCLxCLrUCLrLCLr =

Step 8:Plot Chart Plot Chart

Chart Variations

Future Prediction

An inspector of car wheel rims, working at the end of a manufacturing line, near the end of each shift must inspect the lot of wheel rims made during that shift. On good days when the welder is running properly, over 400 wheel rims are made per batch. On poor days, as low as 50 to 60 wheel rims are made per batch. The inspector marks on the “check sheet” for each batch the total number of wheels inspected and the number of defects returned for rework for each lot. Classroom Example P-Control Chart Construction

18

Steps to Calculating P-Control Chart Step 1. Collect data Step 2. Divide the data into sub groups (i.e., usually days or lot). Each sub group size should be larger than 50 units, where n = the number in each subgroup pn = the number of defects in each sub group

Calculating Fraction of Defectives Step 3. Calculate the fraction of defective parts using the following formula: Where p = fraction (decimal) of the number of defectives pn = number of defects in each subgroup n = number in each subgroup NOTE: To convert result to percentage(%), multiply the result by 100

Calculating Average Fraction of Defectives Step 4. Calculate the Average Fraction of Defectives using the following formula:

Calculating Control Limits Step 5. Calculating the Control Limit for each Subgroup:

23

Step 6:Draw P Control Chart Plot Chart

Classroom Example On an assembly line of windshield wiper motors, the inspector selects randomly 100 motors per hour to examine. The inspector notes on the “check sheet” the number of defective motors in each 100 selected. The inspector samples 100 samples for a total of 30 sampling events. PN Control Chart

PN Control Data Chart

Calculating the PN Control Values 27

Plotting of PN Control Chart 28

Check For Understanding Please Develop a Control Chart for This Valve Manufacturing line: Your Company makes gate valves which you guarantee to flow water at 3 gallons per minute when fully open. Any restriction or misplaced gaskets in the opening will alter this flow rate. Your inspector at the end of the line tests one valve each hour by measuring the flow for one minute in sample valves. The flow rate is recorded for several days in the table in the next slide. Is this operation in control ?

Check For Understanding Flow Rate in Gate Valve Inspection (gal/min) Day9 AM10 AM11 AMNoon1 PM2 PM3 PM