4” Diameter tube inserted into 21” riser at the seafloor (5000’) New riser allowing flow to the drillship Enterprise Oil separated & shipped ashore System.

Slides:



Advertisements
Similar presentations
Carpinteria Field Waterflood. Agenda Objective Phillips injection results Geologic aspects of waterflood Injection water supply o Quantity o Quality Water.
Advertisements

TexChem Group International LLC
Flow Line Regulations 18 AAC
Review Chapter 11 - Tables © 2010, 2006 South-Western, Cengage Learning.
© 2014 HWCG LLC SCAA Annual Meeting 1 HWCG HWCG Mutual Aid.
Blowout BP Gulf of Mexico The Dutch Hurricane Proof Solution Registered at Horizon Support and BP #BPCC Well MC 252 #1 Teamleader: Dick Swart
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Safety Driven Performance 2013
MC 252 #1 – Macondo Prospect OCS-G Well Control Simulation Results April 29, 2010.
Short Bolting Issues John Newhouse MidCon - Arkoma.
MWCC Overview, Well Containment Operations & SIMOPS Spill Control Association of America – Annual Meeting March 20, 2014 Carmine Dulisse.
PACIFIC STATES/BRITISH COLUMBIA OIL SPILL TASK FORCE 2013 ANNUAL MEETING Emerging Issues and Challenges Ahead in West Coast Oil Spill Prevention, Preparedness.
1 Gas Hydrate basics. 2 Gas Hydrates Ice-like, crystalline solid May exist at temperatures up to 25 ° C at high pressure ‘Practical discovery’ by Hammerschmidt,
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
Enhanced Oil Recovery using Computerized Hydraulic Lift Systems
Deepwater drilling challenges Gm, Drilling – murphy malaysia
Asahi/America Swing Check Valves
25-26 August 1999Well Control Conference of the Americas Greater Kick Tolerance and Fewer Casing Strings Make Dual Gradient Drilling a Winner Schubert,
2 Technical seminar - 5 th June 2014 Vincent Roger - TE-MSC-TF.
Inside the Boiler! Boiler Tubes Detail of bottom of boiler tubes.
Gasoline fuel supply systems Function: store, transport, Pressurize and filter gasoline going to carburetor or fuel injection system.
MC 252 Junk Shot Peer Assist – 6 May 2010 Report of Findings 07 May 2010.
Advancing Global Deepwater Capabilities National Ocean Industries Association Annual Conference – April 15, 2011.
OIPA Well Control Insurance Program. Cudd Well Control Based in Houston, TX. –firefighting –blowouts –well control –well control engineering contingency.
Isolation Valve Installation Readiness Trevor Smith/Mark Nichols 11 May 2010 MC 252 Incident Response.
Drinking Water + Compressed Air = Dangerous Mixture Spokane Regional Cross Connection Control Chapter Requirements for Winterizing Irrigation Systems with.
8.1.4 Can it still be factored? Factoring Completely I can factor out a common factor.
 Next Generation of I-Suite  Browser Based Application  Accessed From:  Incident Command Post – Internet Optional  Agency Offices  Wherever Internet.
ILLINOIS DEPARTMENT OF TRANSPORTATION Improving Safety For Incident Responders Illinois Department of Transportation Update: June 2011 MODULE 3 MODULE.
PHASE 7 FACILITIES ENGINEERING
2 nd Annual Seminar 9/19/15 Hosted by: UH College of Education UH College of Natural Science and Mathematics Cullen College of Engineering College of Technology.
Safety Training. What is the purpose of the OSHAs bloodborne pathogens final standard? The purpose is to limit on-the-job exposure to blood and potentially.
Confidential to Subsea Mudlift Drilling JIP11/6/00DGD Template 1 of 64 Dual Gradient Drilling Basic Technology Lesson 1 Introduction to DGD Jerome J. Schubert.
Overview.  Browser Based Application  Accessed From:  Incident Command Post – Internet Optional  Agency Offices  Wherever Internet is Available 
Last Week of Project Terry A. Ring. Project Schedule.
基 督 再 來 (一). 經文: 1 你們心裡不要憂愁;你們信神,也當信我。 2 在我父的家裡有許多住處;若是沒有,我就早 已告訴你們了。我去原是為你們預備地去 。 3 我 若去為你們預備了地方,就必再來接你們到我那 裡去,我在 那裡,叫你們也在那裡, ] ( 約 14 : 1-3)
PROPOSAL RELIEF WELL DESIGN UNTUK MENGHENTIKAN SEMBURAN LUMPUR SUMUR BANJAR PANJI #1 PORONG – SIDOARJO Oleh: IATMI Drilling Team.
Overview.  Next Generation of I-Suite  Browser Based Application  Accessed From:  Incident Command Post – Internet Optional  Agency Offices  Wherever.
 The clipboard is a temporary storage area  The cut or copy commands place information on the CLIPBOARD  There are two types of clipboards: – System.
1 Cryogenic System of Interaction Region (SiD, ILD, QD0, QF1, Crab Cavity) in the Japanese Mountain Site WebEx meeting : June 19 th, 2012 IPNS/Cryogenic.
Well Control Rule Lakeisha Harrison, Chief, Regulations and Standards Branch, Office of Offshore Regulatory Programs, BSEE July 2016 “To promote safety,
Chapter 6.  Moveable rigs include drilling barges, drill ships, jack-up rigs, and semisubmersible rigs.  Offshore rigs use a device called a top drive,
Asahi/America Swing Check Valves
MEXUSGULF TTX Update Mike Sams USCG District 8 Mike Drieu Anadarko & 6/10/2018.
MWCC Containment System Mobile Area Committee December 18, 2013
Opti-Purge® FAST INFLATION PURGE SYSTEM
TEMPUR-ERGO PREMIER BASE MEASUREMENTS
TEMPUR-UP BASE MEASUREMENTS
TEMPUR-ERGO PLUS BASE MEASUREMENTS
Tactical Communications Discussion
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
£"'>£"'>.I.I ' ·.· · ·..I.
ФОНД ЗА РАЗВОЈ РЕПУБЛИКЕ СРБИЈЕ
Walnut Creek CERT Basic Training
Gulf of Mexico/BP Oil Spill: 2010
DEEPWATER HORIZON FERN IN ACTION A State’s Perspective
Слайд-дәріс Қарағанды мемлекеттік техникалық университеті
.. -"""--..J '. / /I/I =---=-- -, _ --, _ = :;:.
II //II // \ Others Q.
'III \-\- I ', I ,, - -
I1I1 a 1·1,.,.,,I.,,I · I 1··n I J,-·
SRO can be run on e-line only during builp-up Rum SRO with EMR as back-up SRO Issues – cost, time to run e-line, specialist personnel, leak tendency from.
STORE MANAGER RESPONSIBILITIES.
,, 'III \-\-
Engine Lubrication Systems
26. Flow Measurement and Safety Devices
. '. '. I;.,, - - "!' - -·-·,Ii '.....,,......, -,
Unified Command Unit 1.2.
NIST TE Challenge Phase II
Presentation transcript:

4” Diameter tube inserted into 21” riser at the seafloor (5000’) New riser allowing flow to the drillship Enterprise Oil separated & shipped ashore System designed to minimize the formation of hydrates Riser tube will also be equipped with methanol injection system to control hydrates Enterprise is capable of processing 15,000 bbls / day and can store 139,000 bbls Support barge is capable of storing 137,000 bbls Riser Insertion Tube

Blowout Preventer - Top Kill

The Incident Command Posts Unified Source Control – Houston Tx. Stack Intervention −Top Kill −Swing Valve −Split Stack Containment −Top hat −Hot tap Relief Wells −DD II −DD III Longer Term Options

The On-Site Command Post Tactical Response Team (TRT) – MC 252