Kusdhianto Setiawan Gadjah Mada University Defining the Project.

Slides:



Advertisements
Similar presentations
Chapter 3 Managing the Information Systems Project
Advertisements

© Copyright 2006 FPT Software 1 © FPT SOFTWARE – TRAINING MATERIAL – Internal use 04e-BM/NS/HDCV/FSOFT v2/3 How to work in Fsoft project Authors: KienNT.
Operations Management Maintenance and Reliability Chapter 17
Chapter 1 The Study of Body Function Image PowerPoint
Objectives To introduce software project management and to describe its distinctive characteristics To discuss project planning and the planning process.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Modern Systems Analyst and as a Project Manager
Making the System Operational
Operations Management
1 Bus 1040 Project Management Week 5 Bus 1040 Project Management Week 5 Agenda: Web presentations A Student handout Scheduling lecture, Network Diagrams,
Electric Bus Management System
EMS Checklist (ISO model)
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Precedence Diagramming
Developing a Project Plan CHAPTER SIX Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
© The McGraw-Hill Companies, Software Project Management 4th Edition Activity planning Chapter 6.
Chapter 6: Developing a Project Plan
Project Management 6e..
Project Management from Simple to Complex
Chapter 6 Time Planning & Networks
Developing the Project Plan
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Where We Are Now Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved.
Project Management Project Management
Developing a Project Plan
SE503 Advanced Project Management
Project Scheduling: Lagging, Crashing, and Activity Networks
Chapter 13 Project Scheduling: PERT/CPM
M EASURING P ERFORMANCE – N EW R EQUIREMENTS FOR D O D P ROJECTS AND P ROGRAMS IPMR I NTEGRATED P ROGRAM M ANAGEMENT R EPORT (IPMR) (DID) DI- MGMT-81466B.
Developing a Network Plan
Project Management CHAPTER SIXTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
CPM Network Computation
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edwards University.
MANAGEMENT RICHARD L. DAFT.
GEtServices Services Training For Suppliers Requests/Proposals.
25 seconds left…...
Key Concepts Planning Process Project Plan Work Breakdown Structure
Slippery Slope
Introduction to Management Science
Project Management 6e..
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 3 Defining the Project.
Chapter 9 Project Management.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Defining the Project CHAPTER FOUR Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 5 Managing Risk.
Chapter 8 Organization Irwin/McGraw-Hill
OM480 Project Management and Organizational Structures (With Material from the Text Authors)
OM480 Defining the Project Parameters – Work Breakdown Schedule (WBS) (With Material from the Text Authors)
OM480 Defining the Project Parameters – Scheduling 101 (With Material from the Text Authors)
Chapter 4 Defining the Project. NEED FOR DEFINING PROJECTS One Project, small Many small projects, or large one –Yes.
Chapter 3: The Project Management Process Groups
OM480 Managing Project Risk (With Material from the Text Authors)
Chapter 4 Defining the Project.
From Research Prototype to Production
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Develop Project Charter
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Management 6e..
Project Management 6e..
Project Planning & Scheduling
Chapter 4 Defining the Project.
Project Management -- Defining the Project
Project Planning & Scheduling
Defining the Project Chapter 4.
Where We Are Now. Where We Are Now Defining the Project (100) Step 1: Defining the Project Scope Step 2: Establishing Project Priorities Step 3: Creating.
MGT 605: CH 04 Defining the Project.
Project Time Management
Project Time Management
Project Time Management
Presentation transcript:

Kusdhianto Setiawan Gadjah Mada University Defining the Project

Kusdhianto Setiawan Gadjah Mada University Figure 3-1 Project Management Trade-Offs Performance Quality CostTime

Kusdhianto Setiawan Gadjah Mada University Figure 3-2 Project Priority Matrix Constrain Enhance Accept TimePerformanceCost

Kusdhianto Setiawan Gadjah Mada University Figure 3-3 Hierarchical Breakdown of the WBS Project Deliverable Subdeliverable Lowest subdeliverable Cost account* Work package 5 Complete project Major deliverables Supporting deliverables Lowest management responsibility level Grouping of work packages for monitoring progress and responsibility Identifiable work activities LevelHierarchical breakdownDescription *This breakdown groups work packages by type of work within a deliverable and allows assignment of responsibility to an organizational unit. This extra step facilities a system for monitoring project progress (discussed in Chapter 12).

Kusdhianto Setiawan Gadjah Mada University Figure 3-4 Work Breakdown Structure Personal computer prototype Vendor, software, applications Mouse, keyboard, voice Disk storage units Microprocessor unit More items FloppyHardOptical Internal memory unit BIOS (basic input/output system) ROM RAM I/OFileUtilities MotorCircuit board Chassis frame Read/write head WP-1MWP-1 CBWP-1 CFWP-1 RWH WP-2 CBWP-2 CFWP-2 RWH WP-3 CBWP-3 CFWP-3 RWH WP-4 CBWP-4 RWH WP-5 CBWP-5 RWH WP-6 CB WP-7 CB ~~~~~ ~ ~ ~ ~ Work packages Lowest manageable subdeliverables Level

Kusdhianto Setiawan Gadjah Mada University Figure 3-5 Integration of WBS and OBS Time

Kusdhianto Setiawan Gadjah Mada University Figure 3-8 Read/Write Head Design Work package cost estimate

Kusdhianto Setiawan Gadjah Mada University Figure 3-9 Three Views of Cost Project Duration Committed Actual cost Scheduled budget Costs $6,000 5,000 4,000 3,000 2,000 1,000

Kusdhianto Setiawan Gadjah Mada University Developing a Network Plan

Kusdhianto Setiawan Gadjah Mada University Figure 4-1 Rollup of Network Plans WP-2 A B C D E F WP-1 WP-4 WP-3 Level 1 - Milestone Plan Level 2 - Plans Level 3 - Plans

Kusdhianto Setiawan Gadjah Mada University Figure 4-2 WBS/Work Packages to Network Circuit board Design cost account Production cost account Test cost account Software cost account Lowest element OrganizatioUnitsOrganizatioUnits Design WP D-1-1 Specifications WP D-1-2 Documentation Production WP P-10-1 Proto 1 WP P-10-2 Final Proto 2 Test systems WP T-13-1 Test Software WP S-22-1 Software preliminary WP S-22-1 Software final version B Proto 1 5 D Final proto 2 4 A Specifications and documentation 2 C Preliminary software 3 F Final software 2 K Test 3 A D-1-1 D-1-2 B P-10-1 D P-10-2 F S-22-2 K T-13-1 C S-22-1

Kusdhianto Setiawan Gadjah Mada University Figure 4-3 Activity-on-Node Network Fundamentals X Y Z Y and Z are preceded by X Y and Z can begin at the same time, if you wish (B) ABC A is preceded by nothing B is preceded by A C is preceded by B (A) J K L M J, K, & L can all begin at the same time, if you wish (they need not occur simultaneously) All (J, K, L) must be completed before M can begin but XZ AA Y (C) (D) Z is preceded by X and Y AA is preceded by X and Y

Kusdhianto Setiawan Gadjah Mada University Figure 4-6 Activity-on-Node Network Fundamentals KOLL BUSINESS CENTER County Engineers Design Department EF

Kusdhianto Setiawan Gadjah Mada University Figure 4-7 Activity-on-Node Network Forward Pass EF KOLL BUSINESS CENTER County Engineers Design Department

Kusdhianto Setiawan Gadjah Mada University Figure 4-8 Activity-on-Node Network Backward Pass LS KOLL BUSINESS CENTER County Engineers Design Department

Kusdhianto Setiawan Gadjah Mada University Figure 4-9 Activity-on-Node Network with Slack LS EF KOLL BUSINESS CENTER County Engineers Design Department

Kusdhianto Setiawan Gadjah Mada University Figure 4-10 Software Conversion Project Responsibility Matrix Activities Organization Unit/Individual Legend R = Responsibility C = Contributes A = Advises

Kusdhianto Setiawan Gadjah Mada University Figure 4-12 Air Control Inc., Custom Order Project—Network Diagram 1 Order review Software development Order standard parts Produce standard parts Design custom parts Manufacture custom hardware Assemble Test Activity 8 # Legend Duration ES EF LS LF

Kusdhianto Setiawan Gadjah Mada University Figure 4-13 Air Control Inc., Custom Order Project—Gantt Chart Order review Design custom parts Order standard parts Produce standard parts Software development Manufacture custom hardware Assemble Test

Kusdhianto Setiawan Gadjah Mada University Figure 4-14 Air Control Inc., Custom Order Project—Network with Dates 1 Order review 2 1-Jan 2-Jan 1-Jan 2-Jan Software development Order standard parts Produce standard parts Design custom parts 18 2-Jan 20-Jan 22-Jan 9-Jan 15 2-Jan 17-Jan 15-Jan 30-Jan 10 2-Jan 12-Jan 5-Jan 15-Jan 13 2-Jan 15-Jan 2-Jan 15-Jan 6 78 Manufacture custom hardware Assemble Test Activity 8 # Legend Jan 30-Jan 15-Jan 30-Jan Jan 9-Jan 30-Jan 9-Jan 5 9-Jan 14-Jan 9-Jan 14-Jan Duration ES date EF date LS date LF date

Kusdhianto Setiawan Gadjah Mada University Figure 4-15 Example of Laddering Using Finish-to-Start Relationship Trench 1/3 Lay pipe 1/3 Refill 1/3 AON network

Kusdhianto Setiawan Gadjah Mada University Figure 4-16 Finish-to-Start Relationship XY Lag 2

Kusdhianto Setiawan Gadjah Mada University Figure 4-17 Start-to-Start Relationship Activity M Activity N Activity P Activity Q Lag 5 A B

Kusdhianto Setiawan Gadjah Mada University Figure 4-18 Use of Lags to Reduce Detail Trench 1 mile Lay pipe 1 mile Lag 3 Refill 1 mile Lag 3

Kusdhianto Setiawan Gadjah Mada University Figure 4-19 Finish-to-Finish Relationship Lag 4 Prototype Testing

Kusdhianto Setiawan Gadjah Mada University Figure 4-20 Start-to-Start Relationship Lag 3 System documentation Testing

Kusdhianto Setiawan Gadjah Mada University Figure 4-21 Combination Relationships Lag 2 Code Debug Lag 4

Kusdhianto Setiawan Gadjah Mada University Figure 4-22 Network Using Lags Legend Lag 5 Lag 10 Lag 5 Lag 10

Kusdhianto Setiawan Gadjah Mada University Figure 4-23 Hammock Activity Example Legend

Kusdhianto Setiawan Gadjah Mada University Managing Risk

Kusdhianto Setiawan Gadjah Mada University Figure 5-1 Risk Event Graph Risk High Cost Low Project life cycle Chances of risks occurring Cost to fix risk event

Kusdhianto Setiawan Gadjah Mada University Figure 5-2 Risk Assessment Matrix Risk event Chance- LMH Severity- LMH Detection difficulty- LMH When

Kusdhianto Setiawan Gadjah Mada University Figure 5-3 Risk Schedules Best-case schedule Baseline schedule Worst-case schedule Actual schedule Forecast completion schedule 10% 50% 90% 470 days 500 days 590 days 550 days 300 days Actual tracking schedule

Kusdhianto Setiawan Gadjah Mada University Figure 5-4 Responses to Risk Matrix Risk event Accept, reduce, share, transfer Contingency plan Trigger

Kusdhianto Setiawan Gadjah Mada University Figure 5-5 Change Request Project _________________ Originator ________________ Description of change Install Y2K compatible chip in six computer controlled milling machines Date _________________ Phone ________________ Y2K-Machine Dept. CEG 3/29/ Ext Impact AreasBaseline Impact Deliverable # __________ Work Package # __________ Cost Account # __________ Organization Unit __________ 1.3M 1.313M 1.31M IS-M Dept. Scope Budget Schedule Contingency Staff Equipment X X X X Justification (include impact if not implemented) Reprogramming cost is higher than estimated, and risk of old chips failing is higher than estimated. (Eliminating reprogramming cost is -$10,000. Cost of Y2K chips installed is +$15,000) Disposition Approve Approve as amended Disapprove Deferred X Priority Emergency Urgent Routine X Funding Source Mgmt. Reserve $ _____________ Budget. Reserve $ _____________ Other $ _____________ 5,000. Authorized _________________ Date ______________________ Scheduled start _________________ Scheduled finish ________________ S.P 4/3/ 4/7/ 5/10/

Kusdhianto Setiawan Gadjah Mada University Chapter 6 Reducing Project Time

Kusdhianto Setiawan Gadjah Mada University Figure 6-1 Project Cost-Time Graph Total costs Optimum cost-time point Direct costs Indirect costs Low-cost plan duration point Project duration Costs

Kusdhianto Setiawan Gadjah Mada University Figure 6-2 Activity Graph $ Activity duration (units) Activity cost Crash cost Normal cost Crash point Normal point

Kusdhianto Setiawan Gadjah Mada University Figure 6-3 Cost-Time Trade-Off Example Total direct cost$450 A 3 B 6 C 10 D 11 E 8 F 5 G 6 (a) Time 25 A 2x B 6 C 10 D 11 E 8 F 5 G 6 (b) Time 24 Legend ACT DUR Initial total direct cost $ 450 Total direct cost $ 470 Activities changed A $20

Kusdhianto Setiawan Gadjah Mada University Figure 6-4 Cost-Time Trade-Off Example (continued) A 2x B 6 C 9x D 9 E 7 F 4x G 6 (c) Time 21 A 2x B 6 C 10 D E 8 F 5 G 6 (a) Time 23 A 2x B 6 C 10 D E 6 F 4x G 6 (b) Time 22 Total direct cost $ 495 Activities changed D $25 Total direct cost $ 525 Activities changed F $30 Total direct cost $ 610 Activities changed F D E $30 $25 $30

Kusdhianto Setiawan Gadjah Mada University Figure 6-5 Summary Costs by Duration

Kusdhianto Setiawan Gadjah Mada University Figure 6-6 Project Cost-Time Graph $ $775 Duration (units) Total indirect cost Total direct cost Total project cost Optimum cost-time point Cost

Kusdhianto Setiawan Gadjah Mada University Chapter 7 Resource Scheduling

Kusdhianto Setiawan Gadjah Mada University Figure 7-1 Constraint Examples PourFrameRoof DesignCodeTest Technical constraints (A) Plan Purchase refreshments Reception Decorate hall Hire band (B) Resource constraints Plan Hire band Decorate hall Purchase refreshments Reception (C)

Kusdhianto Setiawan Gadjah Mada University Figure 7-2a Time Constrained Network Legend

Kusdhianto Setiawan Gadjah Mada University Figure 7-2b Time Constrained Network IDRESDURESLFTS Total resource load Early start leveled resource profile ES resource load chart

Kusdhianto Setiawan Gadjah Mada University Figure 7-3a Leveled Resource Schedule IDRESDURESLFTS Leveled resource profile Leveled resource schedule A

Kusdhianto Setiawan Gadjah Mada University Figure 7-3b Leveled Resource Schedule IDRESDURESLFTS Leveled resource profile Leveled resource schedule B

Kusdhianto Setiawan Gadjah Mada University Figure 7-4a Resource Constrained Schedule through Period 2-3 Legend

Kusdhianto Setiawan Gadjah Mada University Figure 7-4b Resource Constrained Schedule through Period 2-3 Leveled resource profile IDRESDURESLFTS ES resource load chart IDRESDURESLFTS

Kusdhianto Setiawan Gadjah Mada University Figure 7-5a Resource Constrained Schedule through Period 5-6 Resource constrained schedule through period 5-6 IDRESDURESLFTS Final resource constrained schedule IDRESDURESLFTS

Kusdhianto Setiawan Gadjah Mada University Figure 7-5b Resource Constrained Schedule through Period 5-6 Legend

Kusdhianto Setiawan Gadjah Mada University Figure 7-6b Original Network Plan Legend Resources available, 2 each of A, B, C

Kusdhianto Setiawan Gadjah Mada University Figure 7-6b Original Network Plan A B C Resource loading chart Plan schedule New resource schedule

Kusdhianto Setiawan Gadjah Mada University Figure 7-7 Splitting/Multitasking Activity duration without splitting Activity duration split into three segments—A, B, C Activity A Activity BActivity C Activity AActivity B Activity C StartupShutdown Activity duration split with shutdown and startup

Kusdhianto Setiawan Gadjah Mada University Figure 7-8 Responsibility Matrix for a Market Research Project Project team R = Responsible S = Supports/assists

Kusdhianto Setiawan Gadjah Mada University Figure 7-9 Responsibility Matrix for the Computer Controlled Conveyor Belt Project Organization Legend 1 Responsible2 Support 3 Consult4 Notification 5 Approval

Kusdhianto Setiawan Gadjah Mada University Chapter 8 Organization

Kusdhianto Setiawan Gadjah Mada University Figure 8-1 Functional Organizations Delta Manufacturing, Inc. President Human resources Finance and administration MarketingEngineeringManufacturingProcurement Electronics engineering Software engineering Mechanical engineering Design Receiving & inspection Purchasing Customer service Domestic sales International sales FabricationAssemblyTesting Production scheduling Project coordination

Kusdhianto Setiawan Gadjah Mada University Figure 8-2 Dedicated Project Team Zeus Electronics, Inc. President Human resources Finance and administration MarketingEngineeringManufacturingProcurement Project manager Project team

Figure 8-3 Project Organization Structure Central Engineering Systems, Inc. President Marketing Human resources EngineeringManufacturingProcurement Finance and administration Legal Alpha Project Project Manager Beta Project Project Manager EngineeringSubcontractors ManufacturingProcurement Other projects Electrical Mechanical Software Fabrication Assembly Test Systems Hardware Software Subcontractor X Subcontractor Y Subcontractor Z Assembly Test Kusdhianto Setiawan Gadjah Mada University

Kusdhianto Setiawan Gadjah Mada University Figure 8-4 Matrix Organization Structure

Kusdhianto Setiawan Table 8-1 Division of Project Manager and Functional Manager Responsibilities in a Matrix Structure Gadjah Mada University

Kusdhianto Setiawan Figure 8-6 Key Dimensions Defining an Organization’s Culture Gadjah Mada University

Kusdhianto Setiawan Figure 8-8 Cultural Dimensions of an Organization Supportive of Project Management Gadjah Mada University

Kusdhianto Setiawan Figure 8-9 Organization of Product Development Projects at ORION Gadjah Mada University Project manager Deputy planning and control management Electronics system engineer Mechanics system engineer Team leader

Kusdhianto Setiawan Figure 8-10 Traditional Master Plan at ORION Gadjah Mada University Activities/time4-7 Years1-4 Years Design reviews Design and development Production and delivery ILS SDRPDRCDRTRRPRR Laboratory testsEnvironmental tests Build production line and test equipment Documentation and training program Training Production and deliveries

Kusdhianto Setiawan Figure 8-11 Proposed Project Organization for the Jaguar Project Gadjah Mada University Project manager Deputy production manager Electronics system engineer Mechanics system engineer Team leader Deputy planning and control management QA manager ILS manager

Kusdhianto Setiawan Figure 8-12 Jaguar Master Plan Gadjah Mada University Activities/time3-4 Years1-4 Years Design reviews Design and development Production and delivery ILS SDRPDRCDRTRRPRR Laboratory testsEnvironmental tests Build production line and test equipment Documentation and training program Training Production and deliveries

Kusdhianto Setiawan Figure A8-1 Mechanisms for Sustaining Organizational Culture Gadjah Mada University Methods for maintaining organizational culture Formal statement of principles Top management behavior Reactions to organizational crisis Allocation of rewards and status Rituals, stories, and symbols Recruitment of employees who fit the culture Organizational culture Removal of employees who deviate from the culture