Muskegon County New Jail Facility and Juvenile Transition Center Presentation to JJTCC, September 5, 2013.

Slides:



Advertisements
Similar presentations
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Advertisements

CAMPUS MASTER PLAN. Goals To provide the up-to-date facilities that will enhance the quality of student life To redesign the campus so it reflects the.
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
Government of the Republic of Montenegro The Ministry of Education and Science Directorate of Public Works SECONDARY SCHOOL OF MEDICINE.
1 University of Houston Central Campus Parking Study Overview November 2003 WALKER PARKING CONSULTANTS.
PAC/Garage/SCP South Campus Traffic Flow Logistics 6/28/2011.
Facility Needs Assessment and Conceptual Design Pleasant Grove Civic Center.
Index The Region: Newark to Pelham Downtown: Lex Av IRT – 4, 5, 6 PATH PATH & Lex Av IRT – 6 Fulton Street Basic Alignment 2.8 BACKNEXT INDEXEND PATH-Lex.
First Hill Monday, August 2, 1999 Report Back to the Community Capitol Hill.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Los Angeles City Hall Advance on click. The city hall was built in It is 32 stories high and 454 feet tall. For many years by law it was the tallest.
Vineland Commercial Site Address: 7626 N. Vineland Ave. (A.P.N ) 7634 N. Vineland Ave. (A.P.N ) 7630 N. Vineland Ave. (A.P.N )
Hanbury Evans Wright Vlattas + Company | Studio D Architects Analysis Concepts Refinement Integration Campus Master Plan NMSU
CALIFORNIA STATE POLYTECHNIC UNIVERSITY, POMONA | MASTER PLAN UPDATE CAL POLY POMONA President’s Retreat - 26 AUGUST 2010.
University of Minnesota Molecular & Cellular Biology Building June 1999 PROJECT DESCRIPTION l Molecular & Cellular Biology Building (MCBB) for 70 principal.
Blue Prints.
Suisun Valley School K Classroom Addition Project.
Austin Neighborhood Council Civil & Family Courthouse April 22,
Uplands Walk Supportive Housing Community Consultation PUBLIC CONSULTATION WORKSHOP June 2012 UPLANDS WALK SUPPORTIVE HOUSING DESIGNING FOR SAFETY and.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
Comprehensive Plan Advisory Panel September 19, 2007.
LOS ALAMOS COUNTY JUDICIAL / POLICE – JAIL COMPLEX 60% SUBMITTAL August 8, 2008.
Williamson County Expo Center: Site Plan Warmup Arena Renovated Arena Expo Hall and Space.
Planning and Design in Rockford: West State Street Corridor Overview 315 North Main Street · Rockford IL
Mecklenburg County Government Facilities CCBAC Preliminary Capital Requests FY 2008 Real Estate Services Department.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
Wayne Hovey, Interim County Architect Robert Ochs, Chief Probation Officer Steve Freitas, Sheriff-Coroner Recalibrating for Realignment General Services.
Your Birchwood Park Golf Centre and Horizones Health and Fitness Club are changing...
Return site to its rightful glory with cleaner water and more enjoyable experience Propose appropriate additions and renovations to pool, buildings and.
I-15 Express Lanes Project January 2012 I-15 Express Lanes Project January 2012.
CAL POLY POMONA President’s Retreat - 26 AUGUST 2010.
Athenahealth’s ‘master plan’ drawing showing mockup of an office annex on the south side of the existing garage.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
1 Temporary Construction Staging Area Licensing Agreement for Peabody Hotel April 1, 2008 Orange County Convention Center.
UNIVERSITY OF KENTUCKY ALUMNI CENTER STUDY 10 March 2015.
1 Gables Gateway. 2 1.Comprehensive Plan Text Amendment 2.Comprehensive Plan Map Amendment 3.Zoning Code Text Amendment 4.Change in Zoning 5.MXD3 Mixed.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission EA DA New NE MLK & Multnomah.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission Type III Design Review LU DZ SW Yamhill,
SMITH SCOTT MULLAN ASSOCIATES 1 KING’S PARK PRIMARY SCHOOL FEASIBILITY STUDY STAKEHOLDER ENGAGEMENT 03 February 2016.
1 Villa Laguna MXD3 Site Plan Review. 2 Request: The applicant is requesting site plan review of a proposed mixed-use project pursuant to the recently.
Hillside Development Permit 09-38
253 South Los Robles Avenue Predevelopment Plan Review
Jefferson County SA Red Rocks Site Approval
Board Meeting September 25, 2017.
Bond 2017 Capital Projects Linda Degman | January 19, 2017.
CFT Gateway Center ( E. Foothill Blvd
City Council September 18, 2017
MiAPPA Winter 2005.
Board Meeting August 21, 2017.
Auburn University Parking Services Parking Changes
INDOOR BASEBALL / SOFTBALL FACILITY
83 North Lake Avenue Predevelopment Plan Review
Board of Trustees Meeting
Corner of San Pedro and W. C Street
Maps! What are they good for?
South 6th Street 6th Avenue 5th Avenue
West Campus Parking Deck & Roadway Update
Zoning Code Amendment - Emergency Shelters, Limited
St. James School and Formation Center Future Parking
CAL POLY POMONA President’s Retreat - 26 AUGUST 2010.
254 East Union Street Pre Development Plan Review
29th & Choctaw Rd Project Projected time line.
REPOPULATING DOWNTOWN LUBBOCK
Site and Context. Section from East Section E2 Section E1 Sannidhanam Malikapuram Sannidhanam Malikapuram.
N Learning Resources Center To Sim Lab Interior--- Office 115 ELEVATOR
115-Unit Mixed-Use Project (711 E
Seattle Pacific University
August 14, 2018 Rockwall County, TX – Justice and Detention Center - Needs Assessment Task 1 – Summary + Preliminary Estimate of Probable Cost South Correctional.
Presentation transcript:

Muskegon County New Jail Facility and Juvenile Transition Center Presentation to JJTCC, September 5, 2013

New Jail Facility  Building is located in existing parking lot directly east of Hall of Justice

New Jail Facility  Proposed building is three stories tall with partial basement

New Jail Facility  Facility provides detention capacity of 474 beds  Additional 64 beds available within proposed structure  Proposed building systems being designed to accommodate a fourth floor which can add 241 beds for a total potential of 779 beds

New Jail Facility - Site

 Visitor parking will be located south of addition and in lot east of Pine Street.  Visitor access to building at south side of connector between New Jail and Hall of Justice – well defined pedestrian access way to extend east to parking areas  Staff parking will be located on the east side of Pine Street as well as new lot created in space occupied by Antique Mall  Staff access to building will be from the Sheriff’s Department entry.  Deliveries will be from north side of building

New Juvenile Transition Center  Building is located directly south of existing county buildings on Apple Avenue.

New Juvenile Transition Center  Building is single story with sloped roof.  32 beds with potential for future additions

New Juvenile Transition Center - Site

 Visitor and staff parking located west of new building  A new service drive is proposed at the intersection of Spring and Delaware.  Primary access to site would be from Diana Street (vacated).