Coastal Regulation Zone

Slides:



Advertisements
Similar presentations
Orinthology Mill Creek Middle School Science Olympiad 2010.
Advertisements

TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Figure 1-1. Land use and cover in the Queenstown Planning Area.
Advanced Piloting Cruise Plot.
Jubail Industrial City A $45 Billion Super Project
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
MeDON meeting 09 mars IFREMER PROGRESS REPORT WP 3.5 dev & fabrication of the proof of concept architecture and description electronics and sofware.
Integrated Maritime Policy
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Coordinate Plane Practice The following presentation provides practice in two skillsThe following presentation provides practice in two skills –Graphing.
0 - 0.
ALGEBRAIC EXPRESSIONS
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING Think Distributive property backwards Work down, Show all steps ax + ay = a(x + y)
Teacher Name Class / Subject Date A:B: Write an answer here #1 Write your question Here C:D: Write an answer here.
Addition Facts
Year 6 mental test 10 second questions Numbers and number system Numbers and the number system, fractions, decimals, proportion & probability.
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
Welcome to Who Wants to be a Millionaire
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
ZMQS ZMQS
Presenter:Dr. Maureen White Developer: Dr. Chuck Wiseley 12/9/10 1.
Air Pollution Control « Air Pollution Control Ordinance » ( Chapter 311 ) The Air Pollution Control Ordinance(APCO) is the main legislative framework.
Steve Crawford, M.Sc Environmental Director 1. Overview and Background Tribal energy mission statement: To be 100% self- sufficient in energy, while safeguarding.
0 1 Best Location The location for geology Located in the northeastern side of Yongkang, Tianan Country The area for industry North to 5km for STSP West.
State Waters and Stream Buffers
Ocean Vocabulary The energy is being passed through the water as a wave. 2.Wave: the movement of energy through a body of water.
ABC Technology Project
Environment in Lebanon: Status and Way Forward Ricardo Khoury Environmental Consultant, ELARD City Café – Beirut, Lebanon April 5, 2007.
© S Haughton more than 3?
How to Find the Square Root of a Non-Perfect Square
Twenty Questions Subject: Twenty Questions
Linking Verb? Action Verb or. Question 1 Define the term: action verb.
Squares and Square Root WALK. Solve each problem REVIEW:
Energy & Green Urbanism Markku Lappalainen Aalto University.
1.  Private sector involvement is important  There are three major forms of participation: ◦ Type A: Government procurements (GP) ◦ Type B: Private.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
City Council Meeting Agenda Items October 28, 2013.
Local Policy I Session Name: Local Policy I Coastal Hazards Management Course I. Introduction What Do We Mean By “Local Policy” General Police Power Session.
Managing Development in the Coastal Zone, Federal Policy II: Coastal Zone Management Act; Slide 29.1 Session Name: Managing Development in the Coastal.
FEMA PROGRAMS II Session Name: FEMA Programs II Coastal Hazards Management Course Amends the Stafford Act Establishes a Pre-Disaster Mitigation Program.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Addition 1’s to 20.
Steve McLaughlin, PE Virginia Beach Public Works October 2012.
25 seconds left…...
Equal or Not. Equal or Not
Slippery Slope
Test B, 100 Subtraction Facts
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
11 = This is the fact family. You say: 8+3=11 and 3+8=11
Week 1.
We will resume in: 25 Minutes.
A SMALL TRUTH TO MAKE LIFE 100%
1 Unit 1 Kinematics Chapter 1 Day
Shore Protection Act (O.C.G.A , et seq.) Karl BurgessApril 5, 2011 Photo of Choice.
Identifying wetlands As per Wetland Rules (2010).
Coastal Regulation Zone
Comments on the National Environmental Management: Integrated Coastal Management Amendment Bill Adv Gary Birch 23 July 2013.
Presentation transcript:

Coastal Regulation Zone

Definition of HTL Q.1 What is High Tide Line ? Line up to which the highest water line reaches during the spring tide. Q.2 What is Coastal Regulation zone ? Coastal stretches of Sea, Bays, Estuaries, Creeks, Rivers and Backwaters which are influenced by the tidal action. Area between LTL & HTL. Area upto 500m from HTL

Landward limit of CRZ in creeks C.R.Z is extended up to what point inside landward direction,in cases of Rivers, Creeks and Backwaters? Distance upto which tidal effects are experienced Concentration levels of five parts per 1000.

Width of CRZ belt in creeks What is the width of Coastal Regulation zone in case of sea and in case of creeks and rivers and backwaters ? for sea is 500mt. from the High Tide Line. for Creeks and backwaters Width of creek Width of CRZ belt 100m or less Up to 100m or less 100-350m 100m >350m 150m

Prohibited activities in CRZ Prohibited activities in CRZ areas. Setting up and expansion of existing industries, Discharging of untreated waste, Dumping of waste by land filling, Land reclamation or bunding, Construction activity in CRZ - I in between Low Tide Line & High Tide Line, Alteration of sand dunes etc.

CRZ - I What are the different zone in Coastal Regulation zone? Coastal Regulation zone-I(i) Areas that are ecological sensitive such as Marine Park, Mangroves, Coral Riffs, etc. Coastal Regulation zone-I(ii) Area between the Low Tide Line & High Tide Line.

Development in CRZ - I No new construction in Coastal Regulation zone-I Projects of Department of atomic Energy, Pipelines, Transmission Lines are permitted In CRZ- I (ii) which are not ecological sensitive exploration and extraction of natural gas, salt harvesting permitted.

CRZ - II Coastal Regulation Zone - II Developed areas close to the shore line, Substantially built up areas within legally designated urban areas. Infrastructure facilities provided.

Development in CRZ - II Development permissibility in CRZ - II Buildings permitted only on land ward side of existing road or landward side of existing authorized structure or on landward side of proposed roads in approved CZMP. Such bldgs as per existing FSI/FAR norms

C.R.Z (II) Sea Landward Side of Road Existing Road C.R.Z (II) 500 M Sea High tide Line 500M Control Line Plot Landward Side of Road

Land Ward Side of Existing Authorised Building Plot Existing Bldg. Sea CRZ (II) Land Ward Side of Existing Authorised Building

Development in CRZ - II Reconstruction permitted subject to existing FSI/FAR norms without change in use Bldgs. Consistent with surrounding urban landscape & architecture. Certain relaxations given in latest amendment to Redevelopment of Cessed Structures / MHADA Projects.

CRZ - III Coastal Regulation zone - III Relatively undisturbed & undeveloped areas Rural areas within municipal limit which are not substantially built up

Development in CRZ - III Development permissibility in CRZ - III 0-200m No construction except repairs of authorized structures public utility facilities allowed with permission of state CZMP. 200-500m Development of vacant plots for Hotels /beach resorts with prior approval from MoEF. Construction / reconstruction of dwelling units within ambit of tradition of rights and customary use such as fishing, villages and gaothans etc.

Sea 0 –200 MTS. No. Dev. Zone of CRZ - III 200 TO 500 MTS. in N CRZ - III HTL of Sea

CRZ - IV Coastal Regulation Zone - IV Applicable only for Andaman & Nicobar Islands.

C.Z.M.P. What is Costal Zone Management Plan? Identifying coastal stretches & classifying them in different CRZ areas. Integrated development of these areas. State level coastal management authority responsible for monitoring

Coastal Zone Management Plan for Greater Mumbai Combined CZMP for Greater Mumbai submitted to MoEF by GoM Wide letter No. CS/TPB. 4396/12/CR-263/96/UD-11 Dated 25th Nov. 1998 & approved by MoEF letter No. J-17011/8/95-1A .III Dated 19th Jan 2000. CRZ - I CRZ - II CRZ -III Existing Roads shown as CZMP Roads Proposed Roads on Land (Not Passing Trough CRZ) shown as proposed CZMP Roads N 

Extent of CRZ in Mumbai The approximate areas of CRZ CRZ – I 146 sq. kms CRZ - II 42.7 sq. kms CRZ - III 13.82 sq. kms.

Thank You