Omniran-13-0093-01-ecsg 1 OmniRAN EC SG November 2013, Dallas, TX EC closing report Max Riegel (ECSG Chair)

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0623r1 Submission May 2009 Jon Rosdahl, CSRSlide 1 Proposal for P&P Change - # Date: Authors:
Advertisements

Doc.: IEEE /0943r0 Agenda September 2013 Dorothy Stanley, Aruba NetworksSlide 1 IEEE TGmc September 2013 Agenda Date: Authors:
Doc.: IEEE /1226r0 Submission September 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac September 2013 Closing Report Date:
Doc.: IEEE /0424r0 Submission March 2014 Osama Aboul-Magd, Huawei TechnologiesSlide 1 HEW SG PAR and CSD Comments and Resolutions Date:
Doc.: IEEE /0144r3 Submission January 2014 Adrian Stephens, Intel CorporationSlide January 2014 WG Motions Date: Authors:
Doc.: IEEE /0144r2 Submission January 2014 Adrian Stephens, Intel CorporationSlide January 2014 WG Motions Date: Authors:
Doc.: IEEE OmniRAN-14/0008r0 Submission January 2014 Michael Montemurro, BlackBerrySlide 1 Liaison Report for OmniRAN EC SG Date: Authors:
Doc.: IEEE OmniRAN-13/0092r0 Submission November 2013 Michael Montemurro, BlackBerrySlide 1 Liaison Report for OmniRAN EC SG Date: Authors:
Doc.: IEEE /1442r0 Submission November 2013 Michael Montemurro, BlackBerrySlide 1 Liaison Report for OmniRAN EC SG Date: Authors:
Submission doc.: IEEE 802-EC-13/0033r0 July 2013 Jon Rosdahl, CSRSlide 1 ExSec Agenda Items July 2013 Plenary Date: Authors:
Omniran ecsg 1 OmniRAN EC SG November 2013 EC Opening Report Chair: Max Riegel (NSN)
Omniran ecsg 1 OmniRAN EC SG March 2014 Opening Report Chair: Max Riegel (NSN)
Omniran ecsg 1 OmniRAN EC SG Report and Motion for the Mar 2014 closing EC meeting OmniRAN EC SG Chair: Max Riegel (NSN)
Omniran ecsg 1 IEEE 802 OmniRAN EC SG July 2013 Report Max Riegel (EC SG Chair)
Doc.: IEEE OmniRAN-13/0069r0 Submission September 2013 Michael Montemurro, BlackBerrySlide 1 Liaison Report for OmniRAN EC SG Date: Authors:
Omniran ecsg 1 OmniRAN EC SG March 2013 Closing Report Chair: Max Riegel, NSN.
Doc.: IEEE OmniRAN-13/0053r0 Submission July 2013 Michael Montemurro, BlackBerrySlide 1 Liaison Report for OmniRAN EC SG Date: Authors:
11 ITU-R Liaison Group Report to Session #83 Closing Plenary Roger Marks Acting Chair, ITU-R Liaison Group IEEE WG Session #83 Vancouver,
Doc.: IEEE sru Submission May 2014 Shoichi Kitazawa(ATR)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /1586r0 Agenda January 2015 Stephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors:
Omniran ecsg 1 OmniRAN EC SG July 2013 Liaison Report Chair: Max Riegel, NSN.
Doc.: IEEE /0999r3 Report September 2014 Adrian Stephens, Intel CorporationSlide 1 September Session Supplementary Material Date:
Omniran ecsg 1 OmniRAN EC SG October 10 th, 2013 Conference Call Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG September 27 th, 2013 Conference Call Max Riegel (OmniRAN SG Chair)
1 privecsg IEEE 802 EC Privacy Recommendation Study Group Update to IEEE802 March 2015 Plenary meeting Juan Carlos Zuniga, InterDigital.
1 privecsg IEEE 802 EC Privacy Recommendation Study Group Update to March 2015 Plenary meeting Juan Carlos Zuniga,
Closing Report IEEE Media Independent Handover Services Session #25 Orlando, Florida Vivek Gupta
Privecsg ecsg 1 IEEE 802 EC Privacy Recommendation Study Group Update to 802 Sept Interim meetings Juan Carlos Zuniga, InterDigital.
Proposal for an IEEE 802 EC OmniRAN Study Group Document Number: IEEE Shet Date Submitted: Source: Roger Marks (Consensii.
Omniran ecsg 1 OmniRAN EC SG December 11 th, 2013 Conference Call Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda March 2013, Orlando, FL Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG October 4 th, 2013 Conference Call Max Riegel (OmniRAN SG Chair)
1 Proposal for an IEEE 802 EC OmniRAN Study Group 15 November 2012 Harry Bims (HetNet Study Group Chair)
Omniran ecsg 1 OmniRAN EC SG October 4 th, 2013 Conference Call Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda January 2013, Vancouver, BC Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG October 10 th, 2013 Conference Call Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda May 2013, Waikoloa, HI Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda May 2013, Waikoloa, HI Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda February 28 th, 2013 Conference Call Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda and Meeting Slides July 2013, Geneva, CH Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda and Meeting Slides March 2014, Beijing, China EC SG Chair Max Riegel, NSN.
Omniran ecsg 1 OmniRAN EC SG March 2014 Opening Report to EC SG Chair: Max Riegel (NSN)
Omniran TG 1 IEEE OmniRAN TG Status Report to IEEE 802 WGs
Omniran ecsg 1 OmniRAN EC SG May 2 nd, 2013 Conference Call Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda and Meeting Slides January 2014, Los Angeles, CA Max Riegel NSN (ECSG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda March 2013, Orlando, FL Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda February 28 th, 2013 Conference Call Max Riegel (OmniRAN SG Chair)
Closing Report IEEE Media Independent Handover Services Session #23 Atlanta, Georgia Vivek Gupta
Omniran ecsg 1 OmniRAN EC SG July 2013 Opening Report Chair: Max Riegel, NSN.
Omniran ecsg 1 OmniRAN EC SG Agenda and Meeting Slides March 2014, Beijing, China EC SG Chair Max Riegel, NSN.
Omniran ecsg 1 OmniRAN EC SG Agenda and Meeting Slides January 2014, Los Angeles, CA Max Riegel (ECSG Chair)
Omniran ecsg 1 OmniRAN EC SG February 26 th, 2014 Conference Call Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda and Meeting Slides November 2013, Dallas, TX Max Riegel (ECSG Chair)
OmniRAN EC SG Proposals towards IEEE 802.1
Juan Carlos Zuniga, InterDigital Labs (EC SG Chair)
July 2014 doc.: IEEE /3/2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
IEEE MEDIA INDEPENDENT HANDOVER
<month year> doc.: IEEE < e> <March 2018>
doc.: IEEE /xxxr0 Subir Das sdas at appcomsci dot com
Juan Carlos Zuniga, InterDigital Labs (EC SG Chair)
Juan Carlos Zuniga, InterDigital Labs (EC SG Chair)
Mar Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG4w March 2018 Plenary Closing Report] Date.
IEEE 802 EC Privacy Recommendation SG November, 2014, Report to 802 EC
Juan Carlos Zuniga, InterDigital Labs (EC SG Chair)
IEEE OmniRAN TG July 2014 F2F Meeting
January 2013 Summary Report for OmniRAN EC SG
<month year> doc.: IEEE < e> <March 2018>
doc.: IEEE /xxxr0 Subir Das sdas at appcomsci dot com
IEEE MEDIA INDEPENDENT HANDOVER
Nov Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG LPWA Closing Report November 2017 Plenary]
Presentation transcript:

omniran ecsg 1 OmniRAN EC SG November 2013, Dallas, TX EC closing report Max Riegel (ECSG Chair)

omniran ecsg 2 Outcome of OmniRAN EC SG Session at Dallas IEEE 802 Plenary Draft PAR proposal (PAR + 5C) submitted to EC on Oct 10th 44 comments received until Tue, 5pm CT All comments addressed and resolved –Most leading to modifications in the text of PAR and 5C Revised PAR proposal submitted to EC before Wed, 5pm CT –If approved by EC, PAR proposal would go on the NesCom agenda for March 2014 Presentation to to support the idea that is running the project –802.1 provided project number Discussions in OmniRAN EC SG on how to keep interested people engaged in the project –EC SG participants mainly members of the wireless WGs Affiliated with infrastructure vendors, device vendors, operators, technology companies Dallas: 23 participants affiliated with 17 different entities –Results to be discussed with and in the EC workshop Motions: –#1: Approve PAR and 5C as provided by –#2: Extend OmniRAN EC SG until March 2014

omniran ecsg 3 For further discussion: Wish-list for TG Operations OmniRAN TG* SHOULD meet at interims with the IEEE 802 Wireless WGs –OmniRAN TG MAY decide to meet at interims when appropriate Alignment of meeting schedules –Avoid scheduling OmniRAN at plenary meeting slots of other WGs Communications to the other WGs –Liaison representative for each of the WGs Arrangement of agenda for joint meetings –Focused feedback on specific issues from other WGs –Define precisely the question, which should be discussed and clarified. –Solicit participation of experts in other WGs Attendance credit – TBD –Reciprocal credit for F2F meetings OmniRAN TG will use mentor as a document repository * Assuming that project will go into separate TG; name of the TG t.b.d.

omniran ecsg 4 Continuation of Work Two options: –Extend OmniRAN EC SG until March 2014 to allow the group to further develop the foundation of the project until PAR is approved by NesCom. –Less preferred solution would be to establish Study Group in IEEE to allow OmniRAN to further develop the foundation of the project until PAR is approved by NesCom. OmniRAN EC SG prefers to get extension until March because of established environment.

omniran ecsg 5 EC SG Motion #1 The OmniRAN EC SG approves the documents – 02-ecsg-nov-2013-collected-comments-on-draft-par- proposal.xlsxhttps://mentor.ieee.org/omniran/dcn/13/omniran ecsg-nov-2013-collected-comments-on-draft-par- proposal.xlsx – 02-ecsg-proposed-par-and-5c.docxhttps://mentor.ieee.org/omniran/dcn/13/omniran ecsg-proposed-par-and-5c.docx as the outcome and the conclusion of the comment resolution on the draft PAR proposal submitted to EC on Oct. 10 th subject to editorial clean-up by the chair. Moved: Paul Congdon, Tallac Seconded: Jeffry Handal, LSU Motion carries by 10y/0n/2a

omniran ecsg 6 EC SG Motion #2 Extend OmniRAN EC SG until March 2014 to allow the group to further develop the foundation of the project until PAR is approved by NesCom. –Moved: Harry Bims, Bims Labs. –Seconded: Juan Carlos Zuniga, Interdigital –Motion carries by 9y/0n/0a.

omniran ecsg 7 Proposed Motion#1 to the EC: Approve PAR and 5C –EC approves the PAR proposal and 5C as provided in an ecsg-proposed-par-and- 5c.docx an ecsg-proposed-par-and- 5c.docx –Moved: –Seconded:

omniran ecsg 8 Proposed Motion#1 to the EC: Extend OmniRAN ECSG until March 2014 –EC approves the extension of the OmniRAN EC SG until March 2014 to allow the group to further develop the foundation of the project until PAR is approved by NesCom. –Moved: –Seconded: