An Introduction to PPIR

Slides:



Advertisements
Similar presentations
A Presentation to the Cabinet A Presentation to Stakeholders
Advertisements

Human Resource Management: Gaining a Competitive Advantage
Issues and opportunities for a common career path
The vision for Sri Lanka’s Tertiary and Vocational Education
Introduction to VET Quality Assurance in the UK Mark Novels 6 th December 2011 Quality Assurance in Technical and Vocational Education and Skills Study.
PROFESSIONAL CERTIFICATION 8-Feb-141. What Is Professional Certification? A voluntary process through which an individual documents their command of a.
Advanced Nursing Practice Regulation A Global Perspective A Global Perspective Fadwa A Affara International Nurse Consultant.
Presenting: Units A1 and A2
Stage One: Registrant Mentor, (N.M.C., 2006).
Good Medical Practice Evidence to use for Appraisal Good Medical Practice 2006.
P ERSONAL A CTION P LAN. CHAPTER 1: The Ten Faces of the Fearless Foreman CHAPTER 2: Professionalism, Safety, Integrity, and Quality CHAPTER 3: Effective.
The Challenge and Importance of Evaluating Residents and Fellows Debra Weinstein, M.D. PHS GME Coordinators Retreat March 25, 2011.
Standards Definition of standards Types of standards Purposes of standards Characteristics of standards How to write a standard Alexandria University Faculty.
Modernising Scientific Careers NHS East Midlands – Early Adopter Workshop Commissioning MSC Programmes.
An introduction to the LiFE Index Sustainability and Social Responsibility Index.
Professional Performance in Engineering Russell Scott Member PPIR Project Steering Committee Deputy President, IChemE Director, Uhde Shedden Australia.
Regulating the engineering profession Accrediting Engineering Degrees: Practice and Challenges Richard Shearman Director of Formation.
Teacher Appraisal in Australia
Employability Skills for
Topic 6 - The Investors in People award
Professionalism in IT - the UK perspective Susie Kay BCS Director of Professionalism.
Note: Lists provided by the Conference Board of Canada
Paramedic evidence-based education project (PEEP)
2 The key challenge to maintain a robust petroleum industry is ensuring an adequate supply of well trained professionals now and in future The development.
Leadership In Motion : A closer look at essential skills for leaders in the pork industry.
EEN [Canada] Forum Shelley Borys Director, Evaluation September 30, 2010 Developing Evaluation Capacity.
Trinidad & Tobago Corporate Governance Code 2013
Diploma of Project Management Course Outline NSW Course Number Qualification Code BSB51407.
Control environment and control activities. Day II Session III and IV.
Internal Auditing and Outsourcing
Human Resource Management Gaining a Competitive Advantage
Chapter 12 Managing the Team. Objectives Developing a strong corporate culture. Finding and hiring the best people. Dealing with firing an employee. Dealing.
ISO Richard Welford CSR Asia © CSR Asia 2011.
21 st Century Maricopa Review of Process Human Resources Projects Steering Team Meeting May 12, 2010.
Consultant Pharmacists
Improving Corporate Governance in Malaysian Capital Markets – The Role of the Audit Committee Role of the Audit Committee in Assessing Audit Quality.
Diploma of Project Management Course Outline NSW Course Number Qualification Code BSB51407.
1 CREATING A LEARNING ORGANIZATION AND AN ETHICAL ORGANIZATION STRATEGIC MANAGEMENT BUAD 4980.
Manage Project Procurement Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG509A.
1 Professionalism and Accountability Joy Wingfield Short residential course Session 4 September 11th 2006.
UKCHIP – Pathway to Professional regulation? BCS HIF July 2006 Contact :
Better Deal for Business Presentation to LSC West Yorkshire Skills Team Pat Lister Better Deal for Business Officer at Yorkshire Forward.
2 ND EDITION ROD JONES Copyright © Pearson Australia (a division of Pearson Australia Group Pty Ltd) 2010 PowerPoint presentation to accompany.
“Current systems support current practices, which yield current outcomes. Revised systems are needed to support new practices to generate improved outcomes.”
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
Ruth Walker Executive Nurse Director Does education have a role in the preparation of the workforce for advanced practice? An employers view.
CEEMAN AccreditationCape Town, CEEMAN Accreditation IQA Dr.Virginijus Kundrotas.
Business Ethics Dr Attracta Lagan Dr Howard Whitton 2011 ANNUAL CONFERENCE.
Leading global excellence in procurement and supply Leading the Global Standard A Strategy in progress…… Amanda O’Brien 21 March 2013.
Level 2 Unit 1 Exploring the Engineering World Engineering Diploma Level 2 Unit 1 Exploring the Engineering World In this unit, you will discover the world.
LEGALITIES. Independent Contractors vs. Employees ◦ Personal trainers working in clubs are: ◦ Independent Contractors ◦ Employees ◦ Personal trainers.
Developing a Framework In Support of a Community of Practice in ABI Jason Newberry, Research Director Tanya Darisi, Senior Researcher
Professional Registers for the Technical Community HEaTED East of England Network 21 May 2013 Ali Orr, Registrar.
Tom McBride.  This report on the PPIR Project proposes a way of defining and formally recognising how professional engineers interact with, and respond.
Faculty of Science and Technology AU Branding in AEC 1.
Going further together Professionalism in IT CREATING A 21 ST CENTURY PROFESSION TRANSFORMATIONAL GOVERNMENT 1 FEBRUARY 2007 Charles Hughes President
Contracting Jennifer Finch Commissioning Manager
Level 2 Unit 1 Exploring the Engineering World Engineering Diploma Level 2 Unit 1 Exploring the Engineering World An Approach to Unit Delivery and Assessment.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
Introducing Improving Quality Together. Purpose Improving Quality Together aims to support a change in mindset in NHS Wales, where each individual demonstrates.
Higher Apprenticeship UWE Foundation Degree in Healthcare Science Christine Sakhardande Cogent 28 th June 2013
Internal Audit Quality Assessment Guide
Royal Scientific Society Eng. Nael Almulki. Royal Scientific Society FunctionsAbout RSS RSS was established in 1970 as an independent, not-for- profit.
Corporate Responsibility User Forum July2011. Agenda Welcome and Introductions Ice Breaker CR - What’s it all about Kier Strategy for CR Activity Barriers.
DAVID J RANSOM FCII Chartered Insurance Practitioner COPYRIGHT © DAVID J RANSOM FCII.
Mentorship and Coaching Framework
The Philippine Quality Award Program
Professional Development and Standards Board
FAQ – Certified Registered Safety Professional
Purchasing and Supply Chain Management
Presentation transcript:

An Introduction to PPIR Christine Kanellakis, Implementing PPIR Project Director This slide set was presented to the a specialist engineering group (Biomedical Engineers) in Melbourne. A video of presentation and the following Q&A session is also available. The annotation of this slide set is provided in order to assist other members of the PPIR Project teams who need to prepare presentations, especially for similar specialist groups representing a single industry sector or engineering discipline.

What is the Warren Centre for Advanced Engineering? Self-funding, non-profit, independent, industry-linked institute Based at the University of Sydney Fostering excellence & innovation in engineering Projects on issues of national significance Around 6 or 7 years ago, we were approached by the Warren Centre to be a sponsor for the PPIR project. The Warren Centre is essentially an industry funded think tank which addresses issues of importance to the Australian engineering professions and industry Click In 2004 they started the project Professional Performance Innovation and Risk – or PPIR. They set up a project team of leading engineers, many retired senior managers and held workshops and discussions with a wide range of engineers. They carried out a detailed review of professional performance innovation and risk in the Australian engineering practice Focussing in particular on what constitutes performance for the professional engineer So how does the PPIR Protocol add to the professionalism of engineers

- As at 1.12.10 Leading Sponsor Supporters Platinum Sponsors Silver Sponsors Gold Sponsors Platinum Sponsors - As at 1.12.10 Supporters 3

` 4

Why Do We Need PPIR? “A common underlying theme is that there is no shared and accepted view within the engineering profession, and between buyers and sellers of engineering, of the engineering perspective that should govern the relationships between the parties to an engineering task and of the professional engineer’s duty and standard of care in that task.”

I guess I should have defined the job a bit better The engineer told me he’d done one of these before. We actually would have preferred a tunnel

What is at the core of PPIR? Engineering profession already has Ethics and Competency standards Ethics Competency

Ethics

Competency Demonstrated when judged by one’s peers to be eligible for registration by: National Engineering Registration Board (and in Queensland by Board of Professional Engineers QLD) Elements of Competency Knowledge and skill Engineering application ability Professional and personal attributes

What is at the core of PPIR? Engineering profession already has Ethics and Competency standards The PPIR Protocol defines “professional performance” in engineering Ethics Competency Performance Performance : “How does the professional engineer approach, arrange and undertake a new task to ensure delivery of the final agreed outcome”

The PPIR Performance Protocol The eight elements of The PPIR Performance Protocol

What is our plan for PPIR? Benefits Integrated Change Program PPIR Protocol AS.PPIR Guide to Contracting Risk Framework Improving Liability Framework Defines role, obligations and “duty and standard of care” “Best practice template” A formal, fully integrated “best for risk management” approach Including approach to expert witnesses

The PPIR Protocol offers Employees & employers: A guide on how to perform tasks professionally Clear definition of individual and team expectations & responsibilities Greater confidence in future assessment of professional judgment A complement to top/down corporate processes More effective & productive employees & higher standards of commercial decision making

PPIR Protocol & Change Plan offers Buyers: Best for project/ product philosophy Mechanism for measuring performance of contractors Better risk management More confidence in innovation Suppliers: Emphasis on defining the task not on remedies More balance & equity – a level playing field Better risk management allowing for innovation & improved insurance profile

PPIR Protocol & Change Plan Offers The Engineering Profession: Greater understanding by the public of the profession of engineering Greater recognition of the engineer Increased status of engineering

Implementing PPIR TWC BOARD Steering Committee Management Committee The project has a management structure Click And individual project teams Communication Education & Training Industry Adoption Standards Liability 16

www.ppir.com.au The implementation of PPIR is not being mandated by law or direction from any authority So it is highly dependent on communication to generate exposure, understanding and support for the project. It uses a wide variety of media Click A website which provides access to all project information Our LinkedIn group for keeping updated on development and participating in discussion Publication of articles in magazines and on-line sites Conferences – such as this one And in seminars being run in cooperation with the associations. 17

A Project about Engineering Professionalism in the 21st Century The PPIR report Winner of the NSW Engineers Australia Engineering Excellence Award 2010 A Project about Engineering Professionalism in the 21st Century