Lake Baroon Catchment Care Group Project Manager Report June 19, 2014.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AP STUDY SESSION 2.
1
EuroCondens SGB E.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Wasco County Soil and Water Conservation District 1 WASCO RIPARIAN BUFFER PROJECT Briefing for CBFWA Anadromous Fish Committee by Ron Graves.
David Burdett May 11, 2004 Package Binding for WS CDL.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
0 - 0.
1 1  1 =.
1  1 =.
CHAPTER 18 The Ankle and Lower Leg
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 10 second questions
29/05/ Floodlights on Over Recreation Ground Floodlight Project Team.
Public Meeting to Review Proposed Four Seasons Agreement Between QAC Commissioners and K. Hovnanian September 17, :00 pm Kent Island High School.
The 5S numbers game..
1 A B C
Media-Monitoring Final Report April - May 2010 News.
Break Time Remaining 10:00.
The basics for simulations
Factoring Quadratics — ax² + bx + c Topic
A sample problem. The cash in bank account for J. B. Lindsay Co. at May 31 of the current year indicated a balance of $14, after both the cash receipts.
PP Test Review Sections 6-1 to 6-6
Mental Math Math Team Skills Test 20-Question Sample.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Progressive Aerobic Cardiovascular Endurance Run
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
Biology 2 Plant Kingdom Identification Test Review.
1..
Adding Up In Chunks.
FAFSA on the Web Preview Presentation December 2013.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Facebook Pages 101: Your Organization’s Foothold on the Social Web A Volunteer Leader Webinar Sponsored by CACO December 1, 2010 Andrew Gossen, Senior.
Before Between After.
Addition 1’s to 20.
25 seconds left…...
: 3 00.
5 minutes.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Week 1.
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
Static Equilibrium; Elasticity and Fracture
Converting a Fraction to %
Clock will move after 1 minute
PSSA Preparation.
& dding ubtracting ractions.
“Reading Measurement Scales”. MNI = marked number interval AMI = adjacent number interval.
Physics for Scientists & Engineers, 3rd Edition
Select a time to count down from the clock above
Patient Survey Results 2013 Nicki Mott. Patient Survey 2013 Patient Survey conducted by IPOS Mori by posting questionnaires to random patients in the.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Presentation transcript:

Lake Baroon Catchment Care Group Project Manager Report June 19, 2014

Number Project Name Status Allocated Other Income Expenditure since last meeting Expenditure Upper Small Creek Rehabilitation ProjectReveg. maint.; weed mgt (madiera) $ $ 4, Walkers Creek Restoration Stage 1Reveg. maint.; sign $ - $ Rob Cork Dairy Pad ProjectCompleted (signage budget) $ Upper Obi Obi Creek Frontage PlanCompleted $ Arley Creek Wetlands Project Year 2OSW $ Upper Obi Obi Creek RestorationCompleted (see ) $ 1, Willow Creek Stormwater ProjectMaint.; SUSPENDED $ 1, Bridge Creek Riparian Remnant FencingMaterials purchased. $ 3, Upper Obi Obi Creek RestorationCompleted (see ) $ 4, Cork Dairies Obi Obi Creek Riparian ProtectionCompleted (reconcile budgets) $ 5, MCP Riparian Revegetation Fencing Stage 2 & 2BCompleted $ 4, Upper Lawley Creek Restoration Year 2Reveg. maint.; OSW & crossing maint. $ 2, Restoring Bridge CreekReveg. maint.; replanting $ 2, $ 5, Upper Obi Obi Creek Restoration Year 2Completed (see ) $ $ 3, Bridge Creek Rehabilitation (Watter)Completed (reconcile budgets) $ - $ Erowal Riparian Fencing & Off Stream WateringFencing completed; weed mgt pending $ $ 16, Upper Alcorn Creek Riparian FencingAll on ground activities completed. $ 40, Spiny Crayfish ResearchNON-SEQWATER PROJECT; Year 2 funding $ 5, Alcorn Creek Riparian RemediationMinor maintenance req. $ 7, $ 11, Unallocated projects $ - $ $ 1, MCP Riparian Revegetation Fencing Stage 3Fencing materials ordered $ 6, $ 1, $ 6, Upper Lawley Creek Restoration Year 3Maintenance $ 5, Restoring Bridge Creek Year 2Maintenance $ 6, Upper Obi Obi Creek Restoration Year 3Maintenance $ 6, Walkers Creek Restoration Stage 2Completed $ 15, Erowal Riparian Fencing & OSW Stage 2Weed maintenance continuing $ 11, $ 4, Cavanagh Seqwater Landslide ProgramCompleted $ 13, $ $ 12, Ling Landslip RemediationCompleted - Invoice BMRG $ 7, $ 2, $ 2, $ 11, Wittacork Seqwater Landslide Program Commencement imminent $ 17, $ 8, Mid Obi Riparian CorridorPlan completed $ 29, $ 1, $ 1, Landslide Remediation Program $ 39, $ 17, Totals $ 120, $ 10, $ 37, $ 192, All current Projects

Projects – Upper Smalls Creek Weed management (madeira vine, other env. weeds) Replanting (30 blackwood)

Projects – Ling Landslip Remediation Commenced drainage works (pictured is John Day BMRG Soil Conservation officer). Activities will redirect surface flows away from unstable landslip on neighbouring (Ling) property and into existing watercourses.

Projects – Ling Landslip Remediation Field Walk speakers & guests include Ashley Sewell Jess Trofimovs & Will Stearman (QUT) Dave Clark (Maroochy FARMflow) Tim Odgers (Seqwater) Alan Wynn (Sunshine Coast Council) Warwick Willmott (Geological Society – Qld) John Day (BMRG) Kay Enkelmann (BMRG) Nambour TAFE

Projects – Maleny Community Precinct Revegetation Fencing Stage metres semi-permanent electric fencing

Projects – Maleny Community Precinct Revegetation Fencing Stage 3 Utilised BMRG-funded chainsaw/post hole borer (pictured on strainer post) Project a training exercise for CVA supervisor

Projects – Upper Alcorn Riparian Remediation Project ends on June 30 Requires a final maintenance run – handover to landholder

Maintenance continuing Focus on blue morning glory eradication Projects – Upper Obi Obi Creek Restoration

Projects – Upper Obi Obi Creek Restoration Project progressing well; majority of site on track for completion in mid 2015

Projects – Upper Obi Obi Creek Restoration riparian buffer established between macadamia orchard and Kings Lane Weir

Projects – Wittacork Seqwater Landslide Support Program Property road rehabilitation Off stream watering

Projects – Restoring Bridge Creek maintenance continuing

Reach 1 - Smith Reach 1 – waterway crossing Reach 1 - Smith Reach 2 - Keton

Projects – Upper Lawley Creek Restoration maintenance continuing Keton has a pending application to Sunshine Coast Council LEG grants to extend the project further

Reach 1 - LawleyReach 2 - Malter Reach 3 - Keton Reach 4 – Sunshine Coast Council project

Projects – Erowal Riparian Fencing & Off Stream Watering Weed follow up commenced (spot spraying of environmental weeds)

Posi-track mulching of weeds very successful (3 months on)Erowal reconditioned pump/electrics Roadbase settled nicely – trough needed minor adjustment Wattles and fencing don’t mix

Projects – Mid Obi Riparian Corridor still waiting on Sunshine Coast Council Landholder Environment Grants OSW materials ordered

Troughs delivered 4/6/2014 Bore pump installed 19/6/2014 5,000 gallon tank delivered 13/6/2014 Waiting…(LEG grants)

Other Projects – Watter slip (Bridge Creek Rehabilitation) Provided new (spare) Plant Pink tree guards (tubestock & fencing funds from SCC) Provided access to old LBCCG project site to remove & reuse Plant Pink guards

Other Other Projects – Seqwater Landslide Remediation Program Coordinate the implementation of the project Fee for service

3,000 hoops/bunyas on 3 properties

Project Development – Nadi Lane/SCC Bushland Reserve Investigating partnership with Council and adjacent landholders to fence & revegetate riparian zone

Project Development – Upper Lawley Creek Restoration Year 3

Project Development – Restoring Bridge Creek Year 2

Project Development – Upper Obi Obi Creek Restoration Year 3