REGIONAL REPORT. PUBLIC PARTICIPATION TAI Regional Meeting in Budapest 26.10.2006 Helen Poltimäe, SEI-Tallinn.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Jack Jedwab Association for Canadian Studies September 27 th, 2008 Canadian Post Olympic Survey.
EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
1 A B C
Scenario: EOT/EOT-R/COT Resident admitted March 10th Admitted for PT and OT following knee replacement for patient with CHF, COPD, shortness of breath.
AP STUDY SESSION 2.
1
Slide 1Fig 24-CO, p.737. Slide 2Fig 24-1, p.740 Slide 3Fig 24-2, p.741.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2013 Elsevier Inc. All rights reserved.
UNITED NATIONS Shipment Details Report – January 2006.
David Burdett May 11, 2004 Package Binding for WS CDL.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Local Customization Chapter 2. Local Customization 2-2 Objectives Customization Considerations Types of Data Elements Location for Locally Defined Data.
Create an Application Title 1Y - Youth Chapter 5.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
CALENDAR.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
1. Name the particles in the atom and give the charges associated with each.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt FactorsFactors.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Media-Monitoring Final Report April - May 2010 News.
Break Time Remaining 10:00.
Turing Machines.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
MM4A6c: Apply the law of sines and the law of cosines.
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
CS 6143 COMPUTER ARCHITECTURE II SPRING 2014 ACM Principles and Practice of Parallel Programming, PPoPP, 2006 Panel Presentations Parallel Processing is.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Adding Up In Chunks.
FAFSA on the Web Preview Presentation December 2013.
SLP – Endless Possibilities What can SLP do for your school? Everything you need to know about SLP – past, present and future.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Artificial Intelligence
Before Between After.
Subtraction: Adding UP
: 3 00.
5 minutes.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Prof.ir. Klaas H.J. Robers, 14 July Graduation: a process organised by YOU.
1 Let’s Recapitulate. 2 Regular Languages DFAs NFAs Regular Expressions Regular Grammars.
Types of selection structures
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
Essential Cell Biology
1 Phase III: Planning Action Developing Improvement Plans.
Converting a Fraction to %
Numerical Analysis 1 EE, NCKU Tien-Hao Chang (Darby Chang)
Clock will move after 1 minute
PSSA Preparation.
Copyright © 2013 Pearson Education, Inc. All rights reserved Chapter 11 Simple Linear Regression.
Employment Ontario Literacy and Basic Skills Performance Management Reports Training For Service Providers.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Copyright Tim Morris/St Stephen's School
1.step PMIT start + initial project data input Concept Concept.
3 - 1 Copyright McGraw-Hill/Irwin, 2005 Markets Demand Defined Demand Graphed Changes in Demand Supply Defined Supply Graphed Changes in Supply Equilibrium.
1 Dr. Scott Schaefer Least Squares Curves, Rational Representations, Splines and Continuity.
1 Decidability continued…. 2 Theorem: For a recursively enumerable language it is undecidable to determine whether is finite Proof: We will reduce the.
Presentation transcript:

REGIONAL REPORT. PUBLIC PARTICIPATION TAI Regional Meeting in Budapest Helen Poltimäe, SEI-Tallinn

PUBLIC PARTICIPATION CASES Decision-making on policy level strategies, policies, plans, programs, laws 35 cases assessed in 9 countries Decision-making on project level execution of construction works or of other installations, and other interventions in the natural surroundings and landscape 16 cases from 8 countries

PUBLIC PARTICIPATION ON POLICY LEVEL

CASES

AVAILABILITY AT PUBLIC REGISTRIES No registry accessible (6%) Accessible in one public location (23%) Accessible in more than one public location (60%) NA (11%)

COMMUNICATION TOOLS USED Public was not notified (9%) Only one communication tool used (20%) Several communication tools used (29%) NA (42%)

DURATION OF PUBLIC COMMENT PERIODS No public comment period (11%) Reasonable time (43%) NA (46%)

 NO EFFORTS TO CONSULT MARGINALIZED GROUPS No consultations (57%) NA (43%)

 INCORPORATION OF PUBLIC INPUT Documents do not discuss public input (34%) Documents mention public input (26%) Documents discuss how public input was incorporated (6%) NA (34%)

PUBLIC PARTICIPATION ON PROJECT LEVEL

CASES Energy & mining TransportWater Planning Waste

PLANNED AND SYSTEMATIC EFFORTS TO CONSULT PARTIES No consultations (6%) At least one consultation (44%) Planned and systematic efforts (44%) NA (6%)

QUALITY OF INFORMATION SUPPORTING PARTICIPATION No relevant information (13%) One to three “elements of quality” (43%) Four or more “elements of quality” (44%)

 COMMUNICATION OF INFO TO MARGINALIZED GROUPS No documents or meetings targeted at marginalized groups (62%) NA (38%)

 PUBLIC PARTICIPATION IN RENEWAL OF THE PROJECT No process for PP established (31%) A process for PP has been established (13%) A process for PP has been established and info actively provided (6%) NA (50%)

GENERAL CONCLUSIONS FOR PUBLIC PARTICIPATION

CONCLUSIONS Constitutional rights for PP are vague PP functions mainly as an opportunity for the public to comment on draft decisions PP is regarded as expert consultations The communication channel most often used is Internet Lack of transparency

RECOMMENDATIONS PP should be made possible at the earliest stage where all opportunities are still open A clear obligation to answer all comments Documents should contain summery of public input Capacity building