Prospective Risk Assessment in a Mental Heath Trust A Study About Ways to Improve the Quality of Care in Mental Health Services.

Slides:



Advertisements
Similar presentations
Getting research off the ground
Advertisements

Fieldwork assessment The difference between AS and A2 David Redfern
Collaboration for Leadership in Applied Health Research and Care for South Yorkshire (CLAHRC SY). ‘THE BENEFITS & CHALLENGES OF.
Health Foundation Closing the Gap in Patient Safety Programme Safer Care Pathways in Mental Health Services: Overview 7 February 2014.
Closing the Gap in Patient Safety – Making sure patients are safe Safer Care Pathways in Mental Health: What the project looks like Presented by Tim Bryson.
Improving outcomes for older people: Monitoring and regulating standards Ann Close 8 th June 2011.
Working together for better Research - Collaborative research with BCUHB Dr Nefyn Williams & Dr Richard Tranter, NWORTH Associate Clinical Directors &
Case study: older people’s services in Cambs Demography: an ageing population, rising cost Poorly funded CCG, need for savings Multiple providers, lack.
Mental Health Information: NHS Trust Forum 26 th April 2010, Birmingham Botanical Gardens.
West Midlands (North) Comprehensive Local Research Network Streamlining Research Management and Governance Arrangements Single Assessment Service & Research.
Managing Sponsorship Research Services University of Oxford.
The patient-public-led development of a “Medication Passport ‟ Kandarp Thakkar Lead Pharmacist – Admissions Project Manager Saadia Jamil Senior Pharmacist.
Closing the Gap in Patient Safety Programme Safer Care Pathways in Mental Health: Project Overview Presented by Tim Bryson Project Manager.
1. 2 Implementing and Evaluating of an Evidence Based Nursing into Practice Prepared By Dr. Nahed Said El nagger Assistant Professor of Nursing H.
NHS Staff Survey and CQC Regulation - NHS Staff Survey - Regulatory process and the Quality and Risk xx Profiles (QRPs) x Elizabeth Spragg March 2011.
Screening for people with learning disabilities and people with literacy and numeracy difficulties in IAPT in Cumbria: The argument and initial data. Professor.
WORKSHOP B ALCOHOL SERVICE KNOWSLEY Michele White Madeline Jones Elizabeth Gibbons.
The IRB's Position on Quality Projects vs. Research R. Peter Iafrate, Pharm.D. Chairman, Health Center IRB University of Florida.
Department of Public Health and Primary Care Health Needs Assessment in Prisons: The Professional View and the Client View Helen Thornton-Jones
Implementing service transformation in a recession environment: findings from a qualitative evaluation of Children and Young People IAPT (CYP IAPT) Aris.
Valuing People - Implementing a Programme to Reduce Restrictive Practices Liz Williams, Clinical Services Director Cambian Group.
SAFE Care - ‘Safety Express’ – Mental Health & Learning Disabilities
Improving care quality through NMP in the delivery of mental health services Mike Caulfield MSc, PGCE, BSc, DipHE Advanced Nurse Practitioner for Acute.
Measuring knowledge, skills and confidence to self manage. Patient Activation Dr Alf Collins Clinical Associate in Person Centred Care The Health Foundation.
Insert name of presentation on Master Slide Professor Sue Lister Introducing quality improvement into the education of health and social care professionals.
Development version 19/06/ of 48 Effectiveness of a postural care training programme © 2012 Effectiveness of a postural care education programme.
Medical Audit.
CArers of people with Dementia: Empowerment and Efficacy via Education (CAD: E 3 ) A multi-disciplinary study of the impact of educational interventions.
Quality indicators and their role in contractual relations between health care providers and health insurance companies Janka Jančovičová Health Care Surveillance.
Commissioner Feedback for SLAM CQC Inspection in September 2015 Engagement with Member Practices 1.
The Role of the Research Office Joint Research & Enterprise Office (JREO) St George’s University of London and St George’s University Hospitals NHS Foundation.
12-Oct-15 NIHR Monitoring and Evaluation Evaluation of Research Impact: Options and Challenges October 2012.
The Impact of Health Coaching
Cardiff and Vale UHB Bwrdd lechyd Prifysgol Caerdydd a’r Fro NHS R&D Overview How to avoid the common pitfalls? Thomas Fairman Research Liaison Manager.
Carol Brayne on behalf of the executive group 10 October 2013 CLAHRC East of England Dementia, Frailty, End of Life Care Theme.
Complex Care Teams Context The Department of Health white paper “Our Health, Our Care, Our Say” ‘By 2008 we expect all PCTs and local authorities to have.
1 National Outcomes and Casemix Collection Training Workshop Adult Ambulatory.
Addressing Maternal Depression Healthy Start Interconception Care Learning Collaborative Kimberly Deavers, MPH U.S. Department of Health & Human Services.
Louis Appleby Professor of Psychiatry University of Manchester Chair, National Suicide Prevention Advisory Group Department of Health.
Building Capacity & Capability for Innovation & Improvement
S.A.F.E Situation Awareness For Everyone
The pitfalls of pragmatic research: Pharm-assist: Using PDAs to assist in Pharmacy decisions Pip Divall Clinical Librarian University Hospitals of Leicester.
The state of health care and adult social care 2014/15 David Behan Chief Executive Care Quality Commission #StateofCare.
Critical Appraisal (CA) I Prepared by Dr. Hoda Abd El Azim.
In-Situ Simulation and ‘Systems Testing’ Dr Pamela Winton Dr David Rowney Royal Hospital for Sick Children Edinburgh.
Accessing the NHS for Research – NHS R&D Permissions Jemma Hughes R&D Manager ABMU Health Board.
NIHR Themed Call Prevention and treatment of obesity Writing a good application and the role of the RDS 19 th January 2016.
1 Hinchingbrooke Health Care NHS Trust CQC report October 2015 Inspection Chair: Helen Coe Team Leader: Fiona Allinson Quality Summit 2 February 2016.
Liaison Psychiatry Service Models ‘Core 24’ and more
Unscheduled Care In NHS Fife Dr Brian Montgomery Medical Director.
Registration and monitoring compliance Michele Golden Compliance Manager 2 November 2010.
Safer Staffing The Right Staff, with the Right Skills, in the Right Place at the Right Time Sara Courtney – Head of Professions SEISD.
Dr Priya Rajyaguru Foundation Year 2 Doctor North Bristol NHS Trust The use of the National Early Warning Score (NEWS) in an old age psychiatry unit.
Quality Assurance for NHS Health Checks Sarah Stevens Public Health Registrar East of England QA Reference Centre.
Peter Selby North Western 12 October 2010 Fracture Liaison Service Provision in the North West.
Community Treatment Orders use in Assertive Outreach Dr Mohammed Al-Uzri Consultant Psychiatrist & Honorary Professor (University of Leicester)
Distance monitoring of SRH and GBV services in emergency Example of third party monitoring in Syria Nadine Cornier Humanitarian Advisor, Reproductive Health.
Responsibilities of Sponsor, Investigator and Monitor
Responsibilities of Sponsor, Investigator and Monitor
Healing our Health System Models of Care
Descriptive Analysis of Performance-Based Financing Education Project in Burundi Victoria Ryan World Bank Group May 16, 2017.
Welcome Self Injurious Behaviour: Main title slide page
INNOVATIVE, INTERPROFESSIONAL SIMULATION
Professor Stephen Pilling PhD
EDC ©2016. All rights reserved.
Cheryl Holton, Program Director
Evaluating the effectiveness and cost effectiveness of BSL IAPT
Sustainability in Quality Improvement
How can we talk about physical activity in consultations
Commissioner Feedback for SLAM CQC Inspection in September 2015
Presentation transcript:

Prospective Risk Assessment in a Mental Heath Trust A Study About Ways to Improve the Quality of Care in Mental Health Services

This research is a CLAHRC fellows project and the fellow is Dr Jenny Spencer. The Project PI is Dr Terry Dickerson, Assistant Director of the University of Cambridge Engineering Design Centre. The project Sponsor is Cambridgeshire and Peterborough NHS Foundation Trust (CPFT) through the NIHR CLAHRC for Cambridgeshire and Peterborough.

What We Did Aim Test whether two methods for prospectively identifying risk could be efficaciously adapted to a mental health environment. Goal 1. Verify and validate the use of these tools in a mental health setting. 2. Ideally, improve patient safety and the quality of clinical care in mental health settings. Outcome measures Primary – Comparison of managerial Prospective Hazards Analysis and clinical staff Quality Assurance Data Collection results. Secondary – Change in Patient Safety Culture using MAPSAF. Change in the number and severity of reported near misses and SUIs.

Aim of the Study Hazards List Number Brief Summary Descriptio n Most likely worst case Consequen ce Probabili tySeverity Current Layer of protectio n l Teams affected Environme nts Change required Implemen ted Hazard 001 Patients might.. Feel suicidal.. DeathLikelySevere CPN, 6 years AO, Crisis Communit y Hazard 002 Staff might.. assess a skin condition.. First aidCertainMinor Jr Dr (SHO) Old Age, Adult Inpatient.. Hazards List Number Brief Summary Descriptio n Most likely worst case Consequen ce Probabili tySeverity Current Layer of protectio n l Teams affected Environme nts Change required Implemen ted Hazard 001 Patients might.. Feel suicidal.. DeathLikelySevere CPN, 6 years AO, Crisis Communit y Hazard 002 Staff might.. assess a skin condition.. First aidCertainMinor Jr Dr (SHO) Old Age, Adult Inpatient.. Compare and contrast Classify problems using WHO patient safety classification system Add or change categories as needed Prospective Hazards AnalysisQuality Assurance Data Collection Health Services Research: Evidence Based Practice Assess the Clinical Safety and Effectiveness of the Quality Assurance methods under study using Adequate and Appropriate Research techniques (Quantitative, Qualitative and/or Mixed Methodologies)

Main Study Flowchart QA Arm - Control Cambridgeshire North No Intervention Out-of-Hours Service CR&HT Service OctJanFebMarAprMayJunJulAug Sep Project Setup Project Protocol QA Tool Design CPFT Permissions Peer Reviews Ethical Review Routine Quality Indicators Setup | Collection and Monitoring  QA Arm - Intervention Cambridgeshire South QA Intervention Out-of-Hours Service CRHT Service QA Arm - Control Cambridgeshire North No Intervention Out-of-Hours Service CRHT Service PHA Arm Consists of a management workshop Takes place early in this period QA Intervention Evaluation Object ive 2 PHA Eval. Objective 1 Project Reporting Formal Objectives 1, 2 and 3 = MaPSaF Timings are indicative Blinding (as far as practicable)

The Challenges We Faced Project size and goals (? too big) Project Set up (1 year) Ethics approval, Sponsorship, Peer review, Indemnity/Insurance, Grant Contracts, Feasibility, Commercial charges, Service Support Costs, Identification of PI, Letters of access/Honorary Research contracts Service provider buy-in Staff engagement Changes initiated by other people

What We Learned Results: Problem classification

What We Learned Results: PHA vs QADC concerns

Conclusion The success of the project is still being assessed Use of the PHA tools revealed differences in safety concerns between management and staff Management concerns primarily revolved around staffing issues Frontline staff concerns included staffing issues and other issues such equipment management Culture assessment data revealed Concerns around patient and staff safety Team safety was rated higher than organisational safety We plan to compare PHA results with trust safety data

“Design for Patient Safety” Department of Health 2003 Thank you for listening.