Department of Employment, Economic Development and Innovation Queensland Mining and Petroleum Operations.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Governments role in the regulation of offshore exploration activities Commonwealth waters Environmental Sustainability Unit – August 2010.
1 The Changing Fortunes of the EUs Energy Market Antony Froggatt.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
1 THE TANZANIA MINING SECTOR – A REVIEW Geological environment Economic reforms New Mineral Policy, 1997 New Mining Act, 1998 New Land Act, 1999 Need to.
1 1 David Piper, UNEP DTIE Chemicals Branch 2nd Global Forum on ASGM Lima, Peru 3 to 5 September 2013 ASGM IN THE MINAMATA CONVENTION ON MERCURY …to protect.
Planning and use of funding instruments
February 16, 2014Ministry of Regional Development - 2 Mid-term assessment of information and publicity measures Commission Regulation (EC) No 1828/2006.
- legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava.
Vision for the internal electricity market
© 3M All Rights Reserved. Innovations in Permitting and Flexible Air Permitting as Well as Methods to Improve the Permitting Process Mark Manninen,
0 - 0.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
FACTORING Think Distributive property backwards Work down, Show all steps ax + ay = a(x + y)
Addition Facts
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt FactorsFactors.
Coal Seam Gas VPELA Forum 16 April 2013 Pierre Andipatin Earth Resources Development Division.
Presentation to the Joint Review Panel Yellowknife General Hearing December 5 th, 2006 Dennis Bevington MP Western Arctic.
Proposed Quintette Mine Re-opening February 2011.
March 2012 Ports and Cities Conference Newcastle Dorte Ekelund, Executive Director Major Cities Unit Department of Infrastructure and Transport
Steve Crawford, M.Sc Environmental Director 1. Overview and Background Tribal energy mission statement: To be 100% self- sufficient in energy, while safeguarding.
SB 192 – Oil and Gas Production Tax Rate/Credit Sponsored by Senator Bert Stedman Senate Resources April 9, 2014 SB 192 Senate Resources Presentation by.
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
1 Auckland Airport Martin Fryer Sustainability Advisor.
1 TANZANIAN MINERAL SECTOR PERFORMANCE, FISCAL BENEFITS AND CHALLENGES Hon. Dr. Ibrahim S. Msabaha (MP) Minister for Energy and Minerals The United Republic.
Citizens petitions on shale gas extraction in Bulgaria and Poland Workshop on The exploration and exploitation of shale gas in the European Union and its.
The Draft National Harmonised Regulatory Framework Coal Seam Gas.
SHALE GAS MEXICAN PERSPECTIVE Felipe de Jesús Cantú Rodríguez September 2012.
Coal Seam Gas – A Sustainable Australian Energy Source. Mike Moraza | 15 June 2011 | Hunter Environmental Institute.
Infrastructure and resource regions Ian Satchwell IM4DC/AAPF Infrastructure Forum Wednesday 20 March Supporting sustainable resources development.
Ministry of Energy & Mines Page 1. Oil & Gas Tenure Update 2004.
THE IMPORTANCE OF MINING TO CAIRNS J2630 | 12 th June 2013 ADDRESS TO THE CAIRNS & MINING CONFERENCE W S (Bill) Cummings Cummings Economics 1.
The Australian Renewable Energy Agency and the New Energy Course Argus Australia Power Generation Fuels 27 February 2013.
1 ASX Listing Rule Amendments – Reporting Requirements for Mining Companies and the JORC Code 2012 ASX Presentation 2013.
Water Management Challenges and Trends Facing the Coal Seam Gas and Mining Industries in Queensland Lindsay Delzoppo General Manager, Operations Environment.
Product Stewardship (Televisions and Computers) Regulations
Addition 1’s to 20.
Unlocking the potential from UKCS low deliverability reservoirs Colin Cranfield (DTI) Pete Naylor (ECL Technology)
Evolution and Change: The Potential of the Canning Basin Ingrid Hebron Manager, Land Access and Kimberley The Chamber of Minerals and Energy of Western.
Adapting to a changing climate John Drexhage, Director, ICMM 28June 2013, London Inaugural Institute of Materials, Minerals & Mining Fellows.
Week 1.
Page 1 of 36 The Public Offering functionality in Posting allows users to submit requests for public offerings of Petroleum and Natural Gas(PNG) and Oil.
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. Global Business and Accounting Chapter 15.
PSSA Preparation.
Page 1 of 30 This process involves authorizing a company to act on behalf of the designated representative for a Crown petroleum and natural gas licence.
August 2008 DOE Uranium Leasing Program 2008 Overview August 14, 2008 Steven R. Schiesswohl, Project Manager U.S. Department of Energy Office of Legacy.
FINANCIAL INSTITUTIONS ENERGY INFRASTRUCTURE, MINING AND COMMODITIES TRANSPORT TECHNOLOGY AND INNOVATION PHARMACEUTICALS AND LIFE SCIENCES Coal Seam Gas.
MINING ACCESS TO WATER RESOURCES – TRADITIONS AND DEVELOPING PRINCIPLES MINING ACCESS TO WATER RESOURCES – TRADITIONS AND DEVELOPING PRINCIPLES ALEX GARDNER.
Your Rights and Obligations under Queensland Land Access Laws.
Australia’s Gas markets
Coal Market in India – 2014 Australia – helping to meet India’s demand for coal Tanya Spisbah, First Secretary (Economic) Australian High Commission, New.
Introduction to Metallic and Industrial Mineral Rights in Alberta Alberta Energy Coal & Mineral Development Unit, Alberta Energy.
Dr Howard Smith Northern Land Council Darwin, Australia Energy Future The Role of Impact Assessment Centro de Congresso da Alfândega | Porto, Portugal.
Presented by Accessing land for petroleum development – current issues James Plumb, Partner.
Mining Lease Application Assessment: Processes within the Minerals and Energy Division PIRSA.
Coal Exploration Projects Queensland Exploration Council Investor Forum - March 2014.
AN INTRODUCTION TO ANGLO AMERICAN. 2 ANGLO AMERICAN Anglo American is a global diversified miner with a market capitalisation of more than $70bn and interests.
Anglo Coal Australia. Group Structure Anglo Coal Australia Australia’s third largest coal producer Investment in Australia totals USD 1.3bn Plans to.
Queensland - Overview Population – 4.56 million Land – million square kilometres (just over 3x size of France!) GSP – $A258 billion Capital City.
Surface Rights in Nunavut
Government of Western Australia Department of Mines and Petroleum Please read this before using presentation This presentation is based on content presented.
Mosun Togun CCS Regulation Seminar U.I.O Oslo LLM Environmental Law15 th May, 2009.
Presentation transcript:

Department of Employment, Economic Development and Innovation Queensland Mining and Petroleum Operations

2 © The State of Queensland, Department of Employment, Economic Development and Innovation, 2011 Resources Legislation administered by Mines, DEEDI Exploration and Production –Petroleum Act 1923 –Mineral Resources Act 1989 –Petroleum and Gas (Production and Safety) Act 2004 –Greenhouse Gas Storage Act 2009 –Geothermal Energy Act 2010 Authorise access to land for exploring for and production of petroleum, mineral, gas, geothermal and greenhouse gas resources

3 © The State of Queensland, Department of Employment, Economic Development and Innovation, 2011 Main Interacting Legislation Environmental Protection Act 1994; Land Court Act 2000; Commonwealth Native Title Act 1993; Aboriginal Cultural Heritage Act 2003.

4 © The State of Queensland, Department of Employment, Economic Development and Innovation, 2011 Districts and Regions within Queensland

5 © The State of Queensland, Department of Employment, Economic Development and Innovation, 2011 Whole of Mine Life Cycle Stewardship of Minerals & Petroleum Resources Legacy of Mining (Abandoned Mines & Contaminated Land) Information & Knowledge (products & services) Mine Closure (Rehabilitation & Future Use) Mining Development & Production Exploration (Access to Land & Resources) Infrastructure Provision Distribution of Wealth Land Use Planning Acceptance of Mining & Social Licence to Operate Pre- Development (Feasibility)

6 © The State of Queensland, Department of Employment, Economic Development and Innovation, 2011 Geothermal Petroleum Mineral and Coal Queensland Tenure – Terminology and Hierarchy Application forms available at: Authority to Prospect (A to P or EPP) Exploration Exploration Permit for Minerals (EPM) Exploration Permit for Coal (EPC) Potential Commercial Area (PCA) Development Mineral Development Licence (MDL) Petroleum Lease (PL) Production Mining Lease (ML) Geothermal Lease (GL) (Proposed Mid-2011) Potential Geothermal Commercial Area (PGCA) Geothermal Exploration Permit (GEM)

7 © The State of Queensland, Department of Employment, Economic Development and Innovation, 2011 EXPLORATION PERMITS

8 © The State of Queensland, Department of Employment, Economic Development and Innovation, 2011 EXPLORATION Exploration permits are the main exploration tenement used by the mining industry throughout the State. They are issued for first-stage, broad-scale exploration. Exploration usually involves activities with no significant or lasting impacts, but these may be followed by more intensive activities such as trenching and close-spaced drilling. Allows the holder to take action to determine the existence, quality and quantity of minerals on, in or under land by methods which include prospecting, geophysical surveys, drilling and sampling and testing of minerals to determine mineral bearing capacity or properties of mineralisation.

9 © The State of Queensland, Department of Employment, Economic Development and Innovation, 2011 Queensland Mineral Exploration Expenditure by Mineral Sought to 2010 Source: ABS ( Mineral and Petroleum Exploration, Australia, Jun 2010) A$ Millions GFC Wet

10 © The State of Queensland, Department of Employment, Economic Development and Innovation, 2011 Current Queensland Exploration and Development Activity Source: Intierra – September 2010 No. of Projects Coal (70 companies) Minerals (258 companies)

11 © The State of Queensland, Department of Employment, Economic Development and Innovation, 2011 MINING LEASE (ML)

12 © The State of Queensland, Department of Employment, Economic Development and Innovation, 2011 MINING LEASE (ML) Mining leases are granted for the purposes of carrying out mining operations and are the main production tenure. They are used by a wide range of holders from the individual prospector to the largest mining companies and may be for any term and have no size restrictions, except in specified restricted areas. Term – no restriction on term however the term sought must be justified. Holder has a right to apply for renewal of term. Mining leases require a Prospecting Permit, an Exploration Permit or a Mineral Development Licence as a prerequisite. There are provisions for notification of applications and objections from any person, and any objections are heard in the land Court. Environmental conditions are set by the Environmental Protection Agency after various impact assessment processes which depend on the size and nature of the operation proposed.

13 © The State of Queensland, Department of Employment, Economic Development and Innovation, 2011 MINING LEASE (ML) Before a mining lease is granted, compensation to landowners must be determined, either by negotiated agreement or determination in the Land Court. Mining leases may also be granted for infrastructure purposes associated with mining. The application fee is prescribed in the Mineral Resources Regulation No maximum or minimum area. May require survey. Rental is calculated by multiplying the number of hectares contained in the lease, by the prescribed rent date as detailed in the Mineral Resources Regulation 2003.

14 © The State of Queensland, Department of Employment, Economic Development and Innovation, 2011 COAL MINING AND COAL SEAM EXTRACTION A petroleum authority and a coal tenement may co-exist over the same area of land (overlapping tenures). Commercial production of petroleum (coal seam gas) must be undertaken under a petroleum lease. Coal miners retain a right to use – “incidental coal seam gas”. Legislation requires the two parties to engage in a consultation process. IMPACTS –The applicant for a petroleum lease must identify possible impacts on the coal resources and consult with the coal mining lease holder. –This consultation process ensures that the extraction techniques for the coal seam gas also optimise coal production.

15 © The State of Queensland, Department of Employment, Economic Development and Innovation, 2011 Galilee Basin Bowen Basin Surat Basin Clarence-Moreton Basin Queensland Coal Basins

16 © The State of Queensland, Department of Employment, Economic Development and Innovation, 2011 Queensland Coal 34 billion tonnes of proven coal resources (45% of Australia’s total) Largest seaborne exporter of coal in the world (almost 20% of total seaborne trade) Largest seaborne exporter of coal in the world (almost 20% of total seaborne trade) 54 operating coal mines 54 operating coal mines Produced ~207 Mt of saleable coal in Produced ~207 Mt of saleable coal in

17 © The State of Queensland, Department of Employment, Economic Development and Innovation, 2011 Year ending 30 June Million tonnes Coal exports = 183 Mt* * Provisional figures subject to revision Queensland Coal Exports by Type – Thermal and Metallurgical

18 © The State of Queensland, Department of Employment, Economic Development and Innovation, 2011 Queensland Coal Export Destinations Total coal exports = 183 million tonnes

19 © The State of Queensland, Department of Employment, Economic Development and Innovation, 2011 Major Infrastructure Developments Rail Northern Missing Link (GAPE Project) (New) Mount Isa – Townsville Rail (Upgrade) Capacity: Approx 7.5 Mtpa More details at Surat Basin Railway Project (New) Ports Abbot Point (Upgrade) Capacity: 50 Mtpa Completion target: 2011 Balaclava Island (New) Capacity: Approx. 35 Mtpa Completion target: Jun 2014 Wiggins Island (New) Capacity: 30Mtpa Completion: 2014

20 © The State of Queensland, Department of Employment, Economic Development and Innovation, 2011 Queensland Coal and CSG Basins Galilee Basin Bowen Basin Surat Basin Clarence- Moreton Basin ~ 34 billion tonnes of proven coal resources ~ 28,000 Petajoules of 2P Coal Seam Gas reserves Bowen Basin major source of export coal all of Queensland’s export coking coal Surat and Clarence Moreton Basins high volatile thermal coals for export, domestic markets conversion coal Galilee Basin planned, large-scale, open-cut mining projects to supply high volatile thermal coal to the export market

21 © The State of Queensland, Department of Employment, Economic Development and Innovation, 2011 Mr Jim Grundy General Manager Mining and Petroleum Operations Phone: Web: