29 October NikhefEddy Jans 0 CERN water incident of October 27 GV302 dosimeters shift s.

Slides:



Advertisements
Similar presentations
County-level Estimates of Leisure Time Physical Inactivity among Adults aged 20 years old Trends
Advertisements

Sustainable Development and Competitiveness IF Metall Höga Kusten and IF Metall Mellersta Norrlands skills development projects Esbjörn Jonsson,
London Underground Crime Data ( ) & Operation “BTP-LU-RCT” Barak Ariel & Lawrence Sherman 4 th International Evidence Based Policing Conference.
+ WELCOME! TISP: Uruguay 10 May Results from Day 1: Sort it Out Ship the Chip TISP: Uruguay 10 May 2009.
Weekly Attendance by Class w/e 6 th September 2013.
20/01/09 OPERA general meeting Nagoya CNGS report.
TEC X5 Setup (1) 1 Front + 1 Back petal, fully equipped (28 modules F.P modules B.P. + AOH + DOHM) Petal assembly IPN-Lyon (F.P.), RWTH-Aachen I.
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
HiRadMat : report from WG2&3 – WANF dismantling January 15, 2010S. Evrard 1 Worksite: activities achieved or in progress WANF cleaning: status Proposal.
14 June 2007VELOEddy Jans 0 Recent VELO-installation++ activities June 14, 2007 Potmeter calibration Bake-out Cabling & Commissioning.
Shift Blocks Preview takes into account discussion at Run Coordination Meeting of 2009/04/01 Prepared by C.Clement, B. Gorini M. Aleksa, A. Ciocio, S.
14 February 2008VELO NikhefEddy Jans 0 Cooling and warm-up of the VELO under neon atmosphere conditions results (Jan 28  30) implications.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
PIP- BOOSTER RF Tuner and Cavity Refurbishment 3/7/12 M. Slabaugh.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
ECAL planning, 10 Jul 2003 AB CMS schedule draft v33.1:surface.
CAF shifts and procedures Marcello, Raffaello, Alberto, Pigi, Sungeun, David, Silvia, Anna & all the 2009 shifters.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
ATF2 Accelerator Status and Plans for JFY 2014 runs N. Terunuma, KEK.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Muon Shift Organization Outline Class 1 Atlas Control Room Shifts Booking Present Status + Experience+ Feedback Class 2 reminder A. Polini & Z. Yan May.
AGS/Booster Status March 11, 2014 Time Meeting Haixin Huang.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
K0 meeting 2007/10/17 Taito Kawasaki. ~ 10/8 (Mon) : Prepare for experiment 10/9 (Tue) : Beam on (1.0 GeV mode) | 9 days, 18 shifts | Normal run : 31.
Prompt Calibration Loop 11 February Overview Prompt calibration loop in SCT –Provides ATLAS with conditions data used for the bulk reconstruction.
25 January 2007VELO sub-projectsEddy Jans 0 VELO-meeting January 25, 2007 Sub-projects: SX & SX connectorize cooling cables alignment procedure.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
ATF hardware status - Orbit Stabilization T.Naito(KEK) ATF2 Project meeting Laboratoire de l'Accélérateur Linéaire (LAL) 1.Orbit oscillation.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
CERN Jan 2006 Specific safety Issues for 2006 compared to 2004 P. Cennini AB Safety Requirement in case the Installation activities are going on.
1 HBD Update Itzhak Tserruya DC meeting, May 7, 2008 May7, 2008.
MTE: Statistics of kickers faults Etienne Carlier, Luis Feliciano, Laurent Ducimetière, Brennan Goddard, Luc Sermeus 1 19 October 2015 MTE internal review.
5 July 2005T. Yasuda, Fermilab D0 Shift Captain Responsibilities Taka Yasuda Fermilab.
VELO Replacement Girish Patel University of Liverpool.
Muon Piquet Training: General Informations March 8-th 2016.
Schedule Access to the hall b508. Magdalena Kowalska.
Test beam check list Michael JECKEL EN-EA-EC.
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
Installation of an Instrument on a CERN machine
Collaboration meeting 26 to 28 June 2017
Shift instructions August 16, 2017 Antoni Aduszkiewicz
Preparation for CERN test beam
2011/ 07/06 Jacqueline Yan IPBSM
Injury: Fall from height
Renovation of the 45-year old PS magnets
RF operation of REX-ISOLDE
Hi Tech Laxmi Nagar Excel, PPT Etc. Basic Computer Course Short Term Computer Hardware Repairing Course 10 Tips Methods Laptop Repairing Course 3 Months.
LHCb & EYETS
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Detector R&D KoRIA In-Kwon Yoo (Pusan Nat’l University) HIM-KIAS
التدريب الرياضى إعداد الدكتور طارق صلاح.
BLM planning 03/03/2014.
VELO-meeting January 25, 2007 Sub-projects: SX & SX
Status of FMS Refurbishment
LS1 status 17/03/2014.
Setup for testing LHCb Inner Tracker Modules
X-ray Irradiator at UCSF MB
Teleconference ACS – FREIA 19th June 2017
Presentation transcript:

29 October NikhefEddy Jans 0 CERN water incident of October 27 GV302 dosimeters shift s

29 October NikhefEddy Jans 1 Water incident of October 27 Long-distance HV cables, distribution boxes and short Lemo-HV cables got “soaked”. Drying, cleaning, repairing estimated to take ≈1.5 week Water was spilled during human intervention of magnet cool water system

29 October NikhefEddy Jans 2 GV302 - normally closed type - looses its closed contact after ≈3 hours. If this happens for 25 seconds the vacuum PLC closes the valve.

29 October NikhefEddy Jans 3 Effect of closing of GV302 on beam vacuum

29 October NikhefEddy Jans 4 present setup by VAC-valve expert of CERN proposed setup

29 October NikhefEddy Jans 5 Dosimeters rad course dosi To get a dosimeter you: must follow at CERN the half-day radiation course have a recent (< 6 months old) medical certificate including blood count KazuAkibaYesYes EddyJansYesYes TjeerdKetelYesYes LucJansenYesYes BartVerlaatYesYes MartinDoetsYesYes Martinvan BeuzekomYesYes Hansde VriesYesNo ChiaraFarinelliYesNo SerenaOggeroYesNo Pietde GroenYesNo Ivan MousYesNo WilcoVinkYesNo Frans MulYesNo Gertjan MulNoNo Krista de RooNoNo ErnoRoelandNoNo MarcoKraanNoNo Berend MunnekeNoNo

29 October NikhefEddy Jans 6 Shifts Tasks of VELO-shifter after ECS + data-analysis training: go through powering up procedure perform IV scan and compare data, take NZS-data, analyse and look for evidence of extra noise determine noisy and dead strips take ZS runs, analyse data and look for differences take NZS round robin data, analyse and compare with ZS error bank analysis, make compilation of issues go through powering down sequence

29 October NikhefEddy Jans 7 Institute Res Comm Total Shifts Blocks of 6 shifts Bristol CERN Glasgow Lausanne Liverpool Manchester MSU Nikhef Oxford Syracuse UCD Warwick Proposed distribution of shift load for 2009 a “block” is a sequence of 2 day + 2 evening + 2 night shifts.

29 October NikhefEddy Jans 8 Proposed distribution of shift load for 2009