ONTMOET DE SCHELDE ir. Maarten Jans commissioned by ir. Wim Dauwe Waterways and Sea Canal (W&Z) Sea Scheldt Department The Sigmaplan: policy-integration.

Slides:



Advertisements
Similar presentations
Land-use Framework Provincial leadership
Advertisements

DYNAMICS OF LEADERSHIPS What it Takes to be a Leader: A Primer Samuel R. Chand.
Advanced Piloting Cruise Plot.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Chapter 6. Competitive strategy: The analysis of strategic position
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
ActionDescription 1Decisions about planning and managing the coast are governed by general legal instruments. 2Sectoral stakeholders meet on an ad hoc.
Rijksinstituut voor Integraal Zoetwaterbeheer en Afvalwaterbehandeling (RIZA) 1 Prospective analysis & IEA for the water environment lessons learned in.
Regional Policy Common Indicators: Infrastructure Definitions and Discussion Brussels, 22 nd November
1 Regional Policy investing in ecosystems & green infrastructure for regional development Mathieu Fichter Policy Analyst Environment European Commission.
1. 2 Why are Result & Impact Indicators Needed? To better understand the positive/negative results of EC aid. The main questions are: 1.What change is.
PROJECT ASSESSMENT – MAIN RESULTS FROM DESK REVIEW Implementing Partners Workshop, European Commission Investing in People thematic programme –
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
1 Implementing Internet Web Sites in Counseling and Career Development James P. Sampson, Jr. Florida State University Copyright 2003 by James P. Sampson,
1 September 27 and October 1, Introduction Jenny Hartfelder– Speaker, Rocky Mountain WEA Janet Hurley Cann– Speaker-Elect, WEA of South Carolina.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
ABC Technology Project
EU market situation for eggs and poultry Management Committee 20 October 2011.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
2 |SharePoint Saturday New York City
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
Strategic Financial Management 9 February 2012
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Universität Kaiserslautern Institut für Technologie und Arbeit / Institute of Technology and Work 1 Q16) Willingness to participate in a follow-up case.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
City Council Meeting Agenda Items October 28, 2013.
1 Tracking Innovation in NC Patterns and Implications for NC's Eastern Region John Hardin, Executive Director NC Board of Science & Technology
Ecological Systems Maintaining and Enhancing Natural Features and Minimizing Adverse Impacts of Infrastructure Projects Course Review.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Current UK and EU Policy on Water Management Thames Tunnel Commission 29/7/11.
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Organization Theory and Health Services Management
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
1 Landscape Unit Planning Guide Training 2 Agenda for the day 8:30 AM - 4:30 PM - opening remarks - introduction - wildlife tree retention - review principles.
The Dutch National Strategy A National Framework for adapting Spatial Planning to Climate Change J.W.L. (Hans) ten Hoeve Ministry of Housing, Spatial Planning.
The Sigmaplan – Flanders Updating the Flemish Sigmaplan : Large scale flexible and sustainable river management Waterwegen & Zeekanaal (W&Z) nv Waterways.
Strategic Environmental Assessment for the Operative Programmes Anita Gulam Ana Kovačević Ministry of Environmental and Nature Protection, Republic of.
Katrien Debeuckelaere Legal Advisor, Land Use Planning, Flemish Region
Presentation transcript:

ONTMOET DE SCHELDE ir. Maarten Jans commissioned by ir. Wim Dauwe Waterways and Sea Canal (W&Z) Sea Scheldt Department The Sigmaplan: policy-integration and stakeholder management 1/07/2014

ONTMOET DE SCHELDE 2 NWRM – workshop Agenda  Waterways & Sea Canal  the Sigmaplan Introduction  Policy-integration and preparation Safety, Nature and Economic growth for Flanders  Stakeholder management Participation and public support

ONTMOET DE SCHELDE 3 NWRM – workshop Agenda  Waterways & Sea Canal  the Sigmaplan Introduction  Policy-integration and preparation Safety, Nature and Economic growth for Flanders  Stakeholder management Participation and public support

ONTMOET DE SCHELDE 4 Waterways & Sea Canal Flemish Government agency (Belgium)  Stimulate multifunctional use of the waterways  Ensure safety and manage flood risk (Sigmaplan)  Manage living on and around the waterway – Stimulate recreation, tourism and nature experiences – Enhance the link between water & city

ONTMOET DE SCHELDE 5 NWRM – workshop Agenda  Waterways & Sea Canal  the Sigmaplan Introduction  Policy-integration and preparation Safety, Nature and Economic growth for Flanders  Stakeholder management Participation and public support

ONTMOET DE SCHELDE 6 the Sigmaplan Why?

ONTMOET DE SCHELDE 7 the Sigmaplan Why?

ONTMOET DE SCHELDE 8 Baasrode WintamAntwerpen Wintam the Sigmaplan Why?

ONTMOET DE SCHELDE 9 the Sigmaplan What?  Sigmaplan 1976 ˗ Higher and stronger dikes: 512 km ˗ 13 Flood Control Areas ˗ Tidal Barrier

ONTMOET DE SCHELDE 10 the Sigmaplan What?  Sigmaplan 1976 ˗ Higher and stronger dikes: 512 km ˗ 13 Flood Control Areas ˗ Tidal Barrier

ONTMOET DE SCHELDE 11  Sigmaplan 1976 ˗ Higher and stronger dikes: 512 km ˗ 13 Flood Control Areas ˗ Tidal Barrier the Sigmaplan What?

ONTMOET DE SCHELDE 12  Sigmaplan 1976 ˗ Higher and stronger dikes: 512 km ˗ 13 Flood Control Areas ˗ Tidal Barrier the Sigmaplan What?

ONTMOET DE SCHELDE 13 NWRM – workshop Agenda  Waterways & Sea Canal  the Sigmaplan Introduction  Policy-integration and preparation Safety, Nature and Economic growth for Flanders  Stakeholder management Participation and public support

ONTMOET DE SCHELDE 14  Updated Sigmaplan dd. 2005, necessity: ˗ Endangered Aquatic and marine fauna and flora (natura 2000 – habitat directive) ˗ Reassessment of flood risk (climate change – spatial planning) ˗ Economic value of the river Scheldt Policy integration and preparation Safety, Nature and Economic growth for Flanders

ONTMOET DE SCHELDE 15 Policy integration and preparation Safety, Nature and Economic growth for Flanders  1976 (start) – 2005 (actualisation) – 2030 (completion)  500+ kilometers river dykes  5,000 hectares flood control and nature areas project areas of the Sigma Plan

ONTMOET DE SCHELDE 16 NWRM – workshop Agenda  Waterways & Sea Canal  the Sigmaplan Introduction  Policy-integration and preparation Safety, Nature and Economic growth for Flanders  Stakeholder management Participation and public support

ONTMOET DE SCHELDE 17  Multiple goals, several win-win’s, many stakeholders ˗ Optimizing Safety: waterway managers, local residents, … ˗ Developing natural quality: environmental organisations, … ˗ Economy: port companies, farmers, boatmen… ˗ Recreation : cyclists, hikers, canoeists, pleasure craft operators ˗ Overal: resident, local municipalities (politicians)  Difficult choices need to be made Room for the river = less space for humans need to expropriate or purchase soils and develop compensation measures Stakeholder management Stakeholders

ONTMOET DE SCHELDE 18 Stakeholder management Different levels  Program level ˗ Planning Phase ˗ Implementation Phase  Project level ˗ Planning Phase ˗ Construction Phase

ONTMOET DE SCHELDE 19 Stakeholder management Different levels  Program level ˗ Planning Phase ˗ Implementation Phase  Project level ˗ Planning Phase ˗ Construction Phase

ONTMOET DE SCHELDE 20  comprehensive studies Stakeholder management planning phase DAMAGE AND VICTIME MODEL Damage (€) per return period for 2000 and 2100 for every municipality HYDROLOGICAL MODEL Flooding simulations per return period for 2000 and 2100 COSTS-BENEFITS MODEL Flooding risks, profitability, pay-back time ADDITIONAL EFFECTS Agriculture, View of neighbours, Nature CALCULATING COSTS MODEL Estimation investment costs and maintenance costs SELECTION OF MEASURES

ONTMOET DE SCHELDE 21  Intensive consultation before en during decision making  government departments  civil society organisations  Agricultural  Nature  (recreation)  Politicians  …  Last phase: via environmental assessment report  Local municipalities, residents  Resulted in optimalisations of the plan + support on program level (= macro) Stakeholder management planning phase

ONTMOET DE SCHELDE 22 Stakeholder management Different levels  Program level ˗ Planning Phase ˗ Implementation Phase  Project level ˗ Planning Phase ˗ Construction Phase

ONTMOET DE SCHELDE 23 Stakeholder management Different levels  Program level ˗ Planning Phase ˗ Implementation Phase  Project level ˗ Planning Phase ˗ Construction Phase

ONTMOET DE SCHELDE 24 Stakeholder management Program Level - Implementaion Phase Sounding Board Committee (social feedback) Sounding Board Committee (social feedback) Steering Committee (strategic choices - policy feedback) Steering Committee (strategic choices - policy feedback)

ONTMOET DE SCHELDE 25 Stakeholder management Program Level - Implementaion Phase Sounding Board Committee (social feedback) Sounding Board Committee (social feedback) Steering Committee (strategic choices - policy feedback) Steering Committee (strategic choices - policy feedback) Nature - landscape Supporting agricultural policy Technical infrastructure recreation safety Thematical committees

ONTMOET DE SCHELDE 26 Stakeholder management Different levels  Program level ˗ Planning Phase ˗ Implementation Phase  Project level ˗ Planning Phase ˗ Construction Phase

ONTMOET DE SCHELDE 27 Stakeholder management Project Level – Planning Phase FRAMEWORK ( SIGMA PLAN 2005 ) Project target: 850 ha wetlands search area : 1,300 ha timing : start construction by 2015 STAKEHOLDERS regional and local authorities sectoral interest groups 30,000 directly involved residents RESULT land use plan safety – ecology ecological management plan recreation and tourism plan PROCEDURES Environmental Impact Assesment Regional Spation Implementation Plan Applying for permits TECHNICAL STUDIES Agriculture Impact Assessement Surface and ground water model Ecological niche model CONSTRUCTION Starting 2015 and onwards Project development process

ONTMOET DE SCHELDE 28 Stakeholder management Project Level – Planning & Implementation Phase Project Committee (local authorities, incl. politicians) Project Committee (local authorities, incl. politicians) Nature - landscape Supporting agricultural policy recreation …… Thematical committees Communication Management:

ONTMOET DE SCHELDE 29 Stakeholder management Different levels  Program level ˗ Planning Phase ˗ Implementation Phase  Project level ˗ Planning Phase ˗ Construction Phase

ONTMOET DE SCHELDE 30 Stakeholder management Program Level - Implementaion Phase

ONTMOET DE SCHELDE 31  Firm basis ◦ extensive multidisciplinary system studies ◦ legal policy decision  Uniform process lay-out ◦ preparation ◦ consultation ◦ formal procedures ◦ realisation  Main goal ◦ Safety & Nature in Scheldt estuary ◦ robust and self-sustaining ecosystem  With minimal social impact & maximal social support Conclusion key elements

ONTMOET DE SCHELDE ir. Maarten Jans commissioned by ir. Wim Dauwe Waterways and Sea Canal (W&Z) Sea Scheldt Department The Sigmaplan: policy-integration and stakeholder management 1/07/2014

ONTMOET DE SCHELDE 33 Policy integration and preparation more sustainable approach  Deeper insight in the estuary’s many functions  Integral water management ˗ Respect the various functions of the water system; ˗ Avoid negative consequences for the environment; ˗ Seek added value and synergies ROOM FOR THE RIVER APPROACH ˗ Moving dykes landward (de-poldering) ˗ More complex ‘controlled reduces tides’ (GGG) ˗ New river areas (new alignment of the embankment)

ONTMOET DE SCHELDE 34  PAST ˗ Decisions based on high water levels; ˗ Basic rule: water can be suppressed; – taller, stronger dykes – flood control areas  2005 ˗ Decisions based on potential damage (costs –benefits); ˗ ‘Floods are also part of the Scheldt’; ˗ Safety vision: Better protection by giving the river more room to breathe Policy integration and preparation Safety, Nature and Economic growth for Flanders