Review of Section L – Maintenance and Operational Planning A Presentation to the Transmission Workstream – November 2005 Steve Gordon, ScottishPower Energy.

Slides:



Advertisements
Similar presentations
A Federal View of the Interface of Natural Gas and Electricity Prices Moving Toward Greater Reliance on Wholesale Energy Markets November 30, 2006 Crowne.
Advertisements

Code Governance Review: WWU views on potential changes to UNC and the Modification Panel Simon Trivella – 30 th March 2010 Governance Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 April 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Enduring Offtake Arrangements including an Off-Peak Interruptible Service Peter Bolitho.
NTS to LDZ Meters – Audits & Validations Created by Alison Chamberlain on behalf of Transporters, for meeting 6 th August, 2010, 31 Homer Road Solihull.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
1 CODE MODIFICATION PROPOSAL No 0243 Amendments to the process for initialisation of Enduring NTS Exit (Flat) Capacity at the Moffat NTS Exit Point Presentation.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
MOD506 – Gas Performance Assurance Framework and Governance Arrangements.
Mod 116B Steve Rose - on behalf of RWE Trading. 2 Background Mod 116 B was raised after discussion with a number of shippers about aspects Mod 116 which.
Provision of third party access to licence exempt electricity and gas networks Andy Pace 4 October | Energy Networks Association - DCMF.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
UNC modification proposal 0407 : Standardisation of notice periods for offtake rate changes for all National Grid NTS Exit Users Transmission Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Mod 0273: Governance of Feasibility Study Requests to Support Changes to Network Exit Agreements – National Grid NTS Response.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
MIPI European Transparency Project (ETP) Transmission Workstream 7 th October 2010.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Gas Roads & GTE Colin Hamilton (European Policy) 2 nd July 2009.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
RIIO Gas Transmission Workshop - 5 th Sept Supplementary information 1 Hypothetical examples to illustrate the impact of combining the constraint management.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Transitional Exit Capacity Proposals -Update Offtake Agreement Workstream, 30 Nov 05 Dave Adlam.
ScottishPower, Energy Retail Gas Long Term Vacant (LTV) Proposal February 2010 Karen Kennedy ScottishPower.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
Ofgem’s decision on UNC modification proposal 044 Sonia Brown.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
NTS Exit Regime Transmission Workstream – 6 th July 2005.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
UNC Modification Proposal 0097: Modification to release aggregated ex-post information for pipeline interconnector offtake flows Christiane Sykes E.ON.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –26 th November 2009 Distribution Workstream.
Distribution workstream 29th January 2009
Transmission Workstream February 2009
PowerTech 2017, Manchester| 19 June 2017
Code Governance Review UNC Modification Proposals
Transmission Workstream 4th July 2007
SO Incentives from April 2010
Richard Fairholme, E.ON UK
Amendment to NEA & NExA Measurement Provisions Change Process
Richard Fairholme Transmission Workstream, 2nd October 2008
Exit Capacity Substitution and Revision
Connection Codes Implementation
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Proposed Transitional Gas Exit Arrangements
Assured Pressures Proposal
Reinstatement of NTS Interruption
GT Response to Action AMR014 Project Nexus AMR Workgroup 20th July | Energy Networks Association.
Information Provision for Transitional Exit Capacity
Stefan Leedham Transmission Workstream 2nd November 2006
OFFERING CAPACITY AT DONOR ASEP IN TRADES & TRANSFER PROCESS
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
Presentation transcript:

Review of Section L – Maintenance and Operational Planning A Presentation to the Transmission Workstream – November 2005 Steve Gordon, ScottishPower Energy Management Limited

Overview Relevant changes since 1996 What Hasn’t Changed much? Time for a review? Current Mod NG response and proposed mod Other Issues for Consideration

Changes To the Market Advent of competition Growth of the CCGT market Increase in the number of directly connected sites to NTS Advent of NETA then BETTA DN Sales & diversity of ownership of transportation network Closer alignment of the gas and electricity regimes Move towards import dependency and a requirement for demand-side response.

What Hasn’t Changed Much during that time? NExAs – specifying information about offtake rates, notice periods and planned maintenance Section L!

Time for a Review? Yes

Mod 060 Discussed with NGT and sent to consultation on 20 th October Main Aims: –Ensure that information is provided to maintenance affected points in the spirit of the intent of the code. –Ensure confidentiality of that information.

NGT Initiative Earlier publication of information on system affected points Early confirmation of window Earlier confirmation of exact dates New mod (discussed today) codifies this approach

Other Issues Distribution and Transmission Maintenance Programmes Classification/Categorisation of Different Types of Works Publication of Inspection Programme Information Incentivising an Efficient Maintenance Programme