Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 April 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 July 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Reform Review Transmission Workstream 07 January 2010.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 116B Steve Rose - on behalf of RWE Trading. 2 Background Mod 116 B was raised after discussion with a number of shippers about aspects Mod 116 which.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC0376S – Increased Choice when applying for NTS Exit Capacity Transmission workgroup - 4 April 2013.
DNPC06 LDZ NEC Charges Denis Aitchison 25 th January 2010.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
NTS Exit Regime Transmission Workstream – 6 th July 2005.
Distribution workstream 29th January 2009
Transmission Workstream February 2009
Exit Capacity Release Methodology Statement
Transmission Workstream, 6 August
Transmission Workgroup – 1st December 2011
UNC 0407 Analysis Scope - Update
Capacity Methodology Statements: Impact of Mod 452
Exit Capacity Substitution and Revision
7th July 2011 Transmission Workgroup - Elexon
Jeff Chandler - 3rd October 2013 UNC Tx Workgroup
Proposed Transitional Gas Exit Arrangements
Mark Freeman 29th January 2007
Flat, flex, assured pressures Network Development Statement
Transmission Workstream 05 November 2009
Presentation transcript:

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. 21 st February 2012 Workgroup Meeting 0413S - DN Adjustment of notices for the reduction of Enduring Annual NTS Exit (Flat) Capacity

2 “AS IS” PROCESS STEPS A.July Application window  Enduring Annual Flat increase and reduction submissions  DN requests for flex & pressure B.Indicative flex & pressure statements (~mid August)  NTS response to requests – accept or part accept or reject C.DN resubmission for Enduring Annual, flex & pressure (~end Aug)  Flat adjustment only if flex or pressure not fully met in Y+4,5 or 6  Only reasonably adjust Enduring Annual for Y+4,5,6 D.NTS discuss with DNs & finalise by 30 th Sept

3 ISSUE FOR REDUCTIONS Y+1,2,3  DNs can submit Enduring Annual Reductions for Y+1,2,3 in July window  These reductions affect entitlement for Y+4,5,6 but current UNC does not permit adjustment where Y+4,5,6 flex or pressure not met in full for DN  Impact could be less accurate matching of DN flat bookings to DN requirements when their flex & pressure is agreed with NG NTS

4 Outline of Modification 0413S - Example Flat capacity Gas Year Flat capacity Gas Year Flat capacity Gas Year Flat capacity Gas Year Flat capacity Gas Year Flat capacity Gas Year July requestsDN Adjustment Req e.g. more flat needed from Y+4 Can be allowed?* Case 1 Case 2 Case 3 Yes No without Mod 413S Yes with Mod 413S * Flat adjustment consistent with Y+4,5,6 flex or pressure not available as requested. Reductions need to satisfy User Commitment

5 Timeline  Workgroup report to Panel by 17 th May  Little time for consultation and conclusion before 1 st July 2012 (opening of Reductions request window).  Likely that provisions (if implemented) only available for 2013 application window  Workgroup report to Panel by 15 th March  Potential to conclude before 1 st July 2012

6 Seeking Workgroup views…