Industry LNG Seminar Institute of Mechanical Engineers 11 February 2009 Abdulrahman Al Mannai Commercial Manager.

Slides:



Advertisements
Similar presentations
Allocation of Capacity in Portugal Under the New Regulation 24th IG meeting S-GRI, Madrid September 23, 2013.
Advertisements

Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
Paris, 14 th December th IG Meeting South Gas Regional Initiative.
Gas Reform In Western Australia Including Upstream Centre for Mining and Energy Upstream Gas Regulation and Competition Reform Sydney October 1998.
1 Considerations in Gas Contracts Using LNG Supply Texas Utility Lawyers Association October 13, 2005 Craig Enochs Jackson Walkter L.L.P.
Total Utility Management Services, LLC is committed to helping your organization make the best informed energy decisions with decades of cost-proven results.
ERGEG Gas Regional Initiative North-West IP Medelsheim / Obergailbach TSOs’ joint diagnostic 9 October 2007.
South Region LNG market changes and cross border flows SGRI – 15th November 2013.
Review of NTS entry charge setting arrangements - IA 1 July 2010.
QENERGY Europe Initiating the LNG Bunkering Project LNG as the basic ship fuel.
Supply Chain / Hoko Student will understand the roles supply chains in a business: Define a supply chain Understand the components and the effects of a.
15 th September 2013 Enagás and TIGF Information to NRAs.
CMP PROPOSAL FOR HARMONISATION 17 th IG meeting Madrid 2 nd November 2011.
GRI-S : Infrastructures The Union list of projects of common interest European Commission DG Energy Internal Market I: Networks and Regional Initiatives.
Gas Regional Initiative - Region South-South East 1st Implementation Group Meeting An Action Plan for the South-South East Europe Natural Gas Market Vienna,
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
GRI North West – RCC Meeting on 28 August Day Ahead – status and legal issues Background Day Ahead pilot project was launched within the ERGEG.
26 th IG meeting 23 th January 2014 Enagás, REN and TIGF Issues to be discussed.
PILOT PROJECT FOR CAM HARMONISATION 16 th SG meeting Madrid 31 st May 2012.
Allocation of capacities between Portugal and Spain Madrid 30 th April 2013.
1 Madrid, 07 th February th SG Meeting South Gas Regional Initiative.
Directie Toezicht Energie, Bonn WS 8 february Bonn 1 SG Workshop: Secondary markets for interconnection capacity: way to adress contractual congestion.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Grain LNG The UK’s Foremost LNG Terminal Ofgem LNG Seminar 11 February 2009.
Oil & Gas Project Financing An LNG Case Study
FINANCING LNG PROJECTS. Contracting for and financing LNG assets April 2006.
European Developments: Capacity Transmission Workgroup 6th October 2011.
A Foundation for Growth
1 Klaipėda LNG Terminal Serving the Regional Gas Market Photo – A. Kubaitis.
EVALUATION OF LIQUEFIED NATURAL GAS RECEIVING TERMINALS FOR SOUTHERN CALIFORNIA April Chan Jana Hartline Rob Hurley Leanna Struzziery Faculty Advisors:
Nominations and Scheduling Questar Gas Company Annual Account Management Customer Meeting Will Schwarzenbach Director, Gas Supply.
LNG Workshop Centrica LNG 11 February 2008 Simon Sydenham.
Energy Risk Management – 3 October 2006 Increasing interactions with global energy markets - the impact on the GB gas market Jo Witters Wholesale Markets,
Russia as a key player on the world energy market Elena Telegina Director of the Institute of Geopolitics and Energy Security of Russia Member of the Board,
Madrid, 11th February th IG Meeting South Gas Regional Initiative.
Transparency Workstream Gas Regional Initiative North West Region By: Cemil Altin Workstream Leader Bonn Workshops 8-9 February 2007 NRA logo.
Market Information Provision Initiative Phase 2 Nolan Robertson Market Information Team Leader.
Building On Success BRASS LNG. Brass Nigeria Brass LNG.
1 North American Energy Standards Board EPSA Regulatory Affairs Conference NAESB Activities in the Wholesale Electric Market Washington, DC October 25,
To ensure compliance before July 31 st CRC Allowance Ordering, Purchasing and Surrendering process.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
® July 30 th, 2014 Utah PSC Technical Conference.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Bjørn W Melaa Excom Vice Chairman The Gas Regional Initiatives and the CBP "working towards a standardised European gas network"
Jonas Törnquist EFET Gas Market Transparency Requirements ERGEG Enabler Group Meeting Dublin, April 2007 Törnquist.
8 February Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
Hazira LNG Pvt. Ltd (HLPL).
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
QATARGAS II/SOUTH HOOK PROJECT
GRI NW TRANSPARENCY PROJECT Transparency Workshop 31 March 2009.
All Island Single Electricity Market IWFA Update Laura Brien
Click to edit Master title style 1 Neta Meidav Manager, Ofgem GRI NW 9 th Stakeholder Group Meeting 25 November 2011, Rotterdam GRI NW Transparency Project.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
18 December Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
Gas storage: GB experience and future trends Sonia Brown Director, European Strategy and Environment GSE Conference - May 2007.
Work Plan and Key Deliverables 2 November WORK PLAN.
Views on the EC Draft LNG Paper
“Hydrocarbons Exploration Activities Offshore Cyprus”
GIE Annual Conference Recent developments in Transparency in the EU
26th IG meeting 23th January 2014
Allocation of Capacity in Portugal Under the New Regulation
2009 TSO Transparency Gas Regional Initiative North-West
GRI NW TRANSPARENCY PROJECT
Allocation of Capacity in Portugal Under the New Regulation
LNG terminals of tomorrow
Capacity Allocation Mechanisms
DAILY CAPACITY PUBLICATION
Presentation transcript:

Industry LNG Seminar Institute of Mechanical Engineers 11 February 2009 Abdulrahman Al Mannai Commercial Manager

Qatargas II Supply Chain North Field Gas Production Onshore Liquefaction (2*7.8 MTPA Trains) Shipping. Q-Flex (~215 km 3 ), Q-Max (~265 km 3 ) Regasification. South Hook can process up to 15.6 MTPA lean LNG (21 bcma gas) Gas LNG Gas to Pipeline

Industry LNG Seminar – Institute of Mechanical Engineers 3 Background – South Hook Terminal South Hook LNG Terminal Company Ltd is a joint venture between subsidiaries of: South Hook Facilities designed and constructed in two phases  Each Phase with an annual gas redelivery capability of ~10.5 bcma  To match the capacity of the Qatargas II upstream facilities SHLNG has been granted exemption from regulated Third Party Access for both phases of capacity and a duration of 25 years from commercial start date.  Enabled South Hook Gas to purchase all primary capacity for QGII LNG (67.5%) (24.15%)(8.35%)

Commercial Relationships QatarUnited Kingdom ExxonMobil Gas Marketing Europe Limited LNG GAS

Industry LNG Seminar – Institute of Mechanical Engineers 5 Capacity Timeline Base Firm Redelivery Capacity South Hook Bundles (SHB) SHG purchased All Terminal Firm Capacity Base Firm Redelivery Capacity D-14 SHLNGSHG Capacity Sale Third Party Services Daily Interruptible Capacity Terminal Operator Services “UIOLI” SHB QGII SHG & Additional Users SHG & Additional Users

Industry LNG Seminar – Institute of Mechanical Engineers 6 South Hook Bundles time space capacity Secondary capacity sales will be in the form of South Hook Bundles (“SHB”) that will specify  Berthing slot date  Temporary LNG tank storage space  Redelivery capacity  LNG quality SHBs can be advertised for re-sale on our Electronic Bulletin Board time

Industry LNG Seminar – Institute of Mechanical Engineers 7 Redelivery profile Terminal Operator “UIOLI” Services Advertised on the website 14 days ahead of a berthing slot Auctioned over 4 days ending 10 days before the berthing slot. Gas redelivered over a 7 day period Users apply via EBB. “UIOLI” SHB example 1 “UIOLI” SHB example 2 Redelivery profile Berthing time LNG Space Berthing time LNG Space

Industry LNG Seminar – Institute of Mechanical Engineers 8 Terminal Operator “UIOLI” Services (cont.) Terminal Operator facilitates the optimisation of unused redelivery capacity Users allowed to nominate above their firm capacity Unused redelivery capacity on the day will be recycled and allocated as interruptible capacity for other Users Allocation is pro rata to firm capacity rights Interruptible Capacity time Aggregate nominations Unused capacity Available Capacity

Industry LNG Seminar – Institute of Mechanical Engineers 9 Commissioning Schedule The first commissioning cargo “Tembek” has left the Arabian Gulf en route for Milford Haven. Commissioning is an intensive activity, commercial operations (Phase 1) is currently forecast to commence in the second half of April  Sendout is under the control of the Terminal Operator during this period  SHLNG will provide schedule updates on its website Commissioning process ongoing

Industry LNG Seminar – Institute of Mechanical Engineers 10 Application To Become a User A party will need to apply and be accepted as a User of the terminal before it can hold capacity. A Confidentiality Agreement will need to be signed before all other relevant documents are released SHLNG to publish the steps required to become a User on its website during March Parties interested in the products and services available from SHG should contact Donovan Waite, Head of Trading and Business Development