Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.

Slides:



Advertisements
Similar presentations
Review of NTS entry charge setting arrangements - IA 1 July 2010.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Hybrid Option(s) Ritchard Hewitt – August Fundamentals  Parameters – Cost Reflective, Incentive, Value  Cost – What does it cost the service provider.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
RG0291 – NTS Licence SC27 – Balancing Arrangements Linepack – Commercial Considerations/Options Review Group 291 – 19 th July 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review Group 291 – Balancing Arrangements Default Cashout Workshop 3 – 21 st June 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Ofgem’s decision on UNC modification proposal 044 Sonia Brown.
European Developments Transmission Workgroup 3 rd May 2012.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Review of the UNC Post-emergency Claims Arrangements Strawman February 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Review Group 291- Ofgem Update
Code Governance Review UNC Modification Proposals
SO Incentives from April 2010
Mod 0333: Supporting Information Pack
0291 – NTS Licence Special Condition 27 – Balancing Arrangements
Exit Capacity Substitution and Revision
Cashout actions and further considerations
Transmission Workgroup June 7th 2012
Joint Office Presentation for Modification 0678
Review Group 291- Ofgem Update
Ritchard Hewitt – September 2010
Draft Mod: Update of default System Marginal Prices
UNC Transmission Workstream 7th December 2006
Transmission Workstream 2nd December 2010
Entry Overrun Calculation
Presentation transcript:

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Mod 0333: Update of default System Marginal Prices Transmission Workstream: 9 th November 2010

Contents  Progress to date  Balancing performance analysis  Assessment of Mod 0333 against Relevant Objectives  Assessment of any alternative options?  Next Steps

Progress to date  Review Group 0291 looked at possible options to update values  Mod 0333 raised using proxy of compressor fuel (injection + withdrawal) & pipeline (space) costs  UNC Panel sent mod to Tx Workstream for up to 3 months, with a target of 1 month mindful of April 2011  Following feedback from October Tx Workstream an option for the Mod has been developed to reflect;  NTS entry & exit capacity charges  1 October Annual Review  Removal of Imbalance volume from methodology  Workstream Report due no later than December Panel

Balancing Performance (1) Imbalance volumes  Since 2000/2001 average daily imbalance volume has reduced by 16GWh  This equates to daily reduction of £252k* gross cashout amount  Equivalent to annual reduction of £107M* gross cashout amount  Indication is that introduction of default cashout has provided incentive for users to balance *based on 29/10/2010; WD price of p/kWh Gas Year price of p/kWh + average cashout of p/kWh Gross cashout volume per day Gross cashout as % of throughput per day Trend of Gross cashout volume Soft Landing Introduced Default Cashout introduced Imbalance tolerances removed

Balancing Performance (2) Market Balancing Actions  Residual Balancing volume has also decreased since 2001  Equivalent to annual reduction of 5,497GWh or £9.9M  Reduction in costs should be considered alongside Linepack Measure Incentive & Shipper imbalance performance (previous slide)  Introduction of Linepack Measure Incentive may be expected to increase Residual Balancing volume Linepack incentive introduced

Assessment of Mod 0333 against Relevant Objectives  (a) “the coordinated, efficient and economic operation of the pipe-line system to which this licence relates”  Updated default cashout levels will provide a robust proxy for operational costs of managing imbalanced gas volumes  Users will be able to take informed decisions on their use of Linepack flexibility by assessing the benefits and costs of being ‘cashed out’

Assessment of Mod 0333 against Relevant Objectives  (d) “so far as is consistent with sub-paragraphs (a) to (c) the securing of effective competition”  Proposed default cashout charges will continue to incentivise users to balance  Users will continue to be encouraged totrade out their imbalance positions efficiently & economically thereby promoting competition and market liquidity  Updated cashout values based on proxy for operational costs will ensure users have greater transparency of the costs of Linepack flexibility & the ability to compare these costs with alternative sources of flexible gas.  Providing improved information will encourage further competition in the provision of flexibility services

Assessment of Mod 0333 against Relevant Objectives  (f) “so far as is consistent with sub-paragraphs (a) to (e), the promotion of efficiency in the implementation and administration of the network code and/or the uniform network code”  Introduces mechanism to ensure default cashout prices are updated on an annual basis (more efficient than an annual mod)  (c) “the efficient discharge of the licensee's obligations under this licence”  In proposer’s view, Mod 0333 is the most appropriate update to the default cashout values in line with C27 obligations

Summary  Mod 0333 is in the proposer’s view the most appropriate update to the default cashout prices  Reflects a proxy for operational costs of providing linepack flexibility  Maintains current commercial incentive for users to balance (preserves efficient primary balancing role)  Maintains basis for competition and market liquidity to allow users to efficiently and economically trade out imbalance positions

Assessment of alternative options?  In previous discussions a number of alternative options have been raised  Would Tx workstream like to take the opportunity to evaluate some / all alternative options against relevant objectives?  Remove default cashout  Use solely compressor costs  Update current storage based methodology  Market based option (% SAP, average bid/offer spread)  Polluter pays, helper get SAP  ?

Next Steps  Workstream Report due at December Panel  ??

Appendix: Assessment of alternative options? SAP Compressor Costs Update current methodology % SAP SAP & SMP (a) Economic & Efficient operation of the system (Cashout & Residual Balancing volumes) (d) Securing of effective competition (Impact to market liquidity & alternative flexible sources)