TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson 1 ` TÜV Product Service Ltd Medical and Health Services Open Day 24 June 2010 Electrical.

Slides:



Advertisements
Similar presentations
Using the SQL Access Advisor
Advertisements

Automation and Motion IEC Control Marketing, , 1 Safety Integrated® Topics for today.
Evidence-based Dental Practice Developing guidelines or clinical recommendations Slide #1 This lecture follows the previous online lecture on evidence.
Use of Tracers as a Leadership Tool
Chapter 24 Quality Management.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Medical devices: Application of risk management to medical devices
Status of IEC rd edition in European Union, USA and Canada
UNITED NATIONS Shipment Details Report – January 2006.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Rue du Rhône CH-1204 Geneva - T: F: Safety of Electronic Equipment Safeguards to reduce.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
XP New Perspectives on Microsoft Office Word 2003 Tutorial 7 1 Microsoft Office Word 2003 Tutorial 7 – Collaborating With Others and Creating Web Pages.
State of New Jersey Department of Health and Senior Services Patient Safety Reporting System Module 2 – New Event Entry.
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
CE PUWER. Which legislation applies? Which legislation applies? Product legislation Free movement of goods Employment legislation Employee protection.
Site Safety Plans PFN ME 35B.
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 Transitioning to Version 8 Building Data Entry Issues in NEAT/MHEA and Oak Ridge National.
Week 2 The Object-Oriented Approach to Requirements
Focus on Patients Manufacturer’s viewpoint The intended use/purpose of a medical device can be depicted using an idealized functional input/output diagram:
Effectively applying ISO9001:2000 clauses 6 and 7.
Chapter 1 Introduction to the Programmable Logic Controllers.
Red Tag Date 13/12/11 5S.
1. 2 Earthquake effects on health care facilities 2.
ETS4 - What's new? - How to start? - Any questions?
© Telcordia Technologies 2004 – All Rights Reserved AETG Web Service Advanced Features AETG is a service mark of Telcordia Technologies. Telcordia Technologies.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
© Paradigm Publishing, Inc Access 2010 Level 1 Unit 1Creating Tables and Queries Chapter 2Creating Relationships between Tables.
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Chapter 4 Gates and Circuits.
Chapter 4 Gates and Circuits.
Gates and Circuits Nell Dale & John Lewis (adaptation by Erin Chambers and Michael Goldwasser)
Chapter 4 Gates and Circuits.
Direct-Current Circuits
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
Defect Tolerance for Yield Enhancement of FPGA Interconnect Using Fine-grain and Coarse-grain Redundancy Anthony J. YuGuy G.F. Lemieux September 15, 2005.
© 2012 National Heart Foundation of Australia. Slide 2.
1 Attributing the costs of health & social care Research & Development – Understanding AcoRD Trudi Simmons Senior Manager – Research Finance & Programmes.
School Census Summer 2010 Headlines 1 Jim Haywood Product Manager for Statutory Returns Version 1.0.
Subtraction: Adding UP
Datorteknik TopologicalSort bild 1 To verify the structure Easy to hook together combinationals and flip-flops Harder to make it do what you want.
Analyzing Genes and Genomes
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
Module 12 WSP quality assurance tool 1. Module 12 WSP quality assurance tool Session structure Introduction About the tool Using the tool Supporting materials.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Datorteknik TopologicalSort bild 1 To verify the structure Easy to hook together combinationals and flip-flops Harder to make it do what you want.
Immunobiology: The Immune System in Health & Disease Sixth Edition
A lesson approach © 2011 The McGraw-Hill Companies, Inc. All rights reserved. a lesson approach Microsoft® PowerPoint 2010 © 2011 The McGraw-Hill Companies,
Energy Generation in Mitochondria and Chlorplasts
Benchmark Series Microsoft Excel 2013 Level 2
Graduate Admission System User Guide for Applicants 1 Last updated: April 2014.
What’s new in WebSpace Changes and improvements with Xythos 7.2 Effective June 24,
Chapter 9: Using Classes and Objects. Understanding Class Concepts Types of classes – Classes that are only application programs with a Main() method.
Clinical Engineering The Royal Liverpool and Broadgreen University Hospitals NHS Trust NHS LIVERPOOL SHORT COURSES IN ELECTRICAL SAFETY ISO 9001: 2000.
Presentation transcript:

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson 1 ` TÜV Product Service Ltd Medical and Health Services Open Day 24 June 2010 Electrical Safety Testing of Active Medical Devices – New challenges. IEC :2005

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson 2 IEC :2005 The 3 rd Edition :2005. Background and what went into it :2005. The major changes 3.Update on the collaterals 4.The technical challenges 5.The timing and implementation challenges 6.The cost challenges

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson IEC :2005 The 3 rd Edition IEC : rd Edition ‘The General Safety Document’ 3

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson 4 Background :2005. Background and what went into it :2005. The major changes 3.Update on the collaterals 4.The technical challenges 5.The timing and implementation challenges 6.The cost challenges

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson IEC rd Edition Background. 1 st Edition Formed from an amalgamation of national requirements but mainly from the UK and Germany (HTM8 and VDE 0750). This was a ground-breaking document for which the main UK participant was awarded an OBE. This edition lasted until nd Edition More in-depth with greater emphasis on creepage and clearance distances and insulation tests. With the later Amendments 1 and 2, this document is still valid and will continue to be so until June pages plus 40 pages of guidance and rationale. 5

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson IEC rd Edition Background. 3 rd Edition Massive document of 200 pages PLUS 180 pages of guidance and rationale. Met with horror and disbelief at first. Much opposition to it becoming a harmonised standard but it was harmonised anyway. 6

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson IEC rd Edition What went into the 3 rd Edition? The contents of the 1 st Edition and the 2 nd Ed + Amdts 1 & 2 Some alarm requirements from other mainly medical stds WG 14 Recommendations 1 to 56 Large parts of IEC (IT equipment) Requirements for Expected Service Life (a ‘one-liner’ with big implications) 7

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson IEC rd Edition What went into the 3 rd Edition? (contd) UL national deviations Medical Systems PEMS Risk Management requirements Essential Performance (in concept but see Particular Stds) Mechanical safety requirements from a variety of sources 8

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson 9 IEC rd Edition :2005. Background and what went into it :2005. The major changes 3.Update on the collaterals 4.The technical challenges 5.The timing and implementation challenges 6.The cost challenges

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson IEC rd Edition New clause numbering. (Now 17 clauses instead of 59) Clause 4. New Single Fault Conditions. New major requirement for a Risk Management (RM) file to ISO There are over a hundred references to the RM file in the standard and manufacturers must ensure that the questions posed are answered in the RM file. Therefore in reality there must be an RM file tailored to the GSD. (example: PE of moving parts. Requirement, blah blah blah. Compliance is checked by inspection of the RM file) Essential Performance. The risk must be assessed of the loss of the primary intention of the equipment or critical aspects of its performance. 10

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson Examples of Essential Performance Essential performance - a high speed tutorial Each item of equipment has a primary intention, a ventilator must ventilate, a defibrillator must defibrillate and an X-ray system must produce an image. This is their Essential Performance In addition, in any specific application, one or some of the pure performance aspects of a product may be critical to the safe and effective operation of the equipment. They are not nice-to-have features, they are ESSENTIAL. For many attributes which in general are probably pure performance, one can think of an item of equipment for which the attribute is critical, examples: 11

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson Examples of Essential Performance...and so on 12 ‘Pure’ safetyBut critical in Fast operationInterventional MRI QuietBaby incubator, audiometer High definitionOphthalmological ultrasound Comfortable patient supportConscious neurosurgery, dentistry Quick set-upEmergency ventilator, stretcher Nice display coloursDoppler colour flowmetry

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson Essential performance - examples Some more general examples of essential performance (but still somewhat equipment specific): Does not switch to full output power Does deliver correct output Makes a correct diagnosis (or a very detailed diagnosis but not an underdiagnosis) Does not overpump Has adequate bandwidth to show abnormalities Questions unusual operations Operates smoothly (hoists, treadmills, ergometers) 13

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson IEC rd Edition New requirements on a clause by clause basis Clause 5. General Requirements for testing..... and Clause 6. Classification No significant changes Clause 7. Identification, marking and documents. No significant changes, but see EN 980:2008 and new requirement in MDD to have IfUs as controlled docs. Clause 8. Protection against electrical hazards. This is where substantial new material appears Connection to a separate power source clarified 14

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson IEC rd Edition New requirements on a clause by clause basis 8.5 New concepts of MOP, MOOP and MOPP with Means of Patient Protection (MOPP) being more rigorous than Means of Operator Protection (MOOP). MOOP comes from There are detailed and complex tables for determining test voltages and C&C distances. (These replace A-a1/k and B-a/e which have GONE) and Touch Current rather than Enc Leakage Current, Earth Leakage currents of 5mA (NC) or 10mA (SFC). 10x earlier values now allowed BUT it can flow only down the Earth wire and must NOT be available on the enclosure. This enables the possible use of more ‘commercial’ power supplies. ELC now taken out of leakage current table (Table 3 page 86) 15

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson IEC rd Edition New requirements on a clause by clause basis h) New leakage current concept for multiple APs of same type connected together (total Patient Leakage current). 8.9 C&C MOPPs based on earlier editions and MOOPs based on (less stringent). Complex tables need to be studied for the applicable values in any particular case. Added concepts: Altitude of operation needs to be taken into account. Additional insulation classifications (CTI, I, II, IIIa & IIIb). Overvoltage categories extended (‘cleanliness’ of supply). Degrees of pollution extended (reminiscent of 61010). Insulating compound taken into consideration (‘potting’ and encapsulation) 16

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson IEC rd Edition New requirements on a clause by clause basis Clause 9. Mechanical hazards The hugely expanded requirements can broadly be considered in two categories. Damage to the patient or user by movement of the equipment. Hazards such as crushing (all body parts mentioned plus the clearances which need to be allowed), cutting, entanglement, stabbing, abrasion, falling and so on. Instability and damage due to pressure are included. Damage to the patient or user by failure of a suspension or support means. Required safety factors of such means are given. 17

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson IEC rd Edition New requirements on a clause by clause basis Clause 10. Unwanted or excessive radiation. Generally the same as before. Reliance is placed on the manufacturer’s RM file. Clause 11. Excessive temperatures. Significant changes in the direction of more relaxed requirements (ie higher temperatures permissible) BUT any temp in excess of 41 C (the traditional value) must be justified, is material dependent and must feature in the RM file. 18

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson IEC rd Edition New requirements on a clause by clause basis Clause 13. Hazardous situations and fault conditions Many new examples of SFCs. Motor locking, cooling failure, detachment of wires and connectors, blocking of filters and so on (see also Part 2s). Heavy dependence on RM file. Clause 14 PEMS. This former collateral ( ) now incorporated into the GSD. 19

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson IEC rd Edition New requirements on a clause by clause basis Clause 15. Construction. Where access for servicing is needed, it shall be provided. Numerous requirements for the strength of the equipment against dropping, pushing, impacting and rough handling. Clause 16. Systems. The former collateral standard is now incorporated into the GSD. Multiple socket outlets now allowed. 20

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson 21 The collaterals :2005. Background and what went into it :2005. The major changes 3.Update on the collaterals 4.The technical challenges 5.The timing and implementation challenges 6.The cost challenges

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson The collaterals Collateral standards Systems. Now part of the main standard. EMC :2007, generally as before but the requirements can be modified by the mfr’s RM file :2008 Radiation protection in diag X-ray equipment : PEMS. Now incorporated into the main standard :2007 Usability. Not a pass/fail standard but a design guideline. This is an assessment of the ergonomics of the design. The manufacturer is expected to be able to show that ‘Usability’ factors have been considered in design. For post design appraisal, TÜV is able to have the equipment assessed by a panel of expert and lay users and prepare a report on the Usability.) 22

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson The collaterals Collateral standards :2006 Alarm systems (frequently overwritten by the particular standard) :2007 Requirements for environmentally conscious design :2007 Development of physiologic closed loop controllers : Home health care (in development, FDIS Feb 2010) 23

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson 24 The technical challenges :2005. Background and what went into it :2005. The major changes 3.Update on the collaterals 4.The technical challenges 5.The timing and implementation challenges 6.The cost challenges

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson The technical challenges Designers, manufacturers and test houses have put off any involvement with the 3 rd Edition as long as possible. There was hope that the standard would not be harmonised but it was. Another reason is that (TÜV has found) the testing time and the testing costs are about 70% greater than the 2 nd Edition. 25

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson The technical challenges Apart from the increase in the number of tests, the new mechanical tests where applicable and the complexity of the standard, there is also a RM file to assess and test parameters to adjust in the light of the RM file. A number of the superficially similar requirements have detail changes and therefore do not map directly across from 2 nd to 3 rd Eds 26

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson The technical challenges 2 Are there any advantages to the 3 rd Ed? In general power supplies approved to can be used and more substantial filters are allowed to help with EMC compliance. Battery circuits and charging arrangements have been clarified In the test voltage tables, it is now acceptable to interpolate between values. 27

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson The technical challenges 2 Are there any advantages to the 3 rd Ed? Mechanical safety covered. Detailed and explicit Guidance and Rationale (in line with recent IEC standards policy) Note: Parts of previous versions of have been inappropriately used for routine production testing and testing following servicing or repair. The 3 rd Ed is even less suitable for these applications. Now covered by a specific standard, IEC

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson 29 Timing and implementation :2005. Background and what went into it :2005. The major changes 3.Update on the collaterals 4.The technical challenges 5.The timing and implementation challenges 6.The cost challenges

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson Timing and implementation Among many other things, the clause numbering in the 3rd Ed is different. Therefore a Part 2 standard intended to relate to the 2nd Ed cannot be used with the 3rd Ed. Testing of products for which there is a Part 2 must be done to the 2nd Ed until a “3rd Ed” Part 2 becomes available. Only about half a dozen 3rd Ed Part 2s are available out of about 40 Part 2s. Transition time will depend on the availability of Part 2s. In general the 2 nd Ed will stay valid until June 2012 (June 2013 in the USA). If a particular Part 2 standard is still not available by June 2012, the 2 nd Ed will remain valid for longer. 30

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson 31 The cost challenges :2005. Background and what went into it :2005. The major changes 3.Update on the collaterals 4.The technical challenges 5.The timing and implementation challenges 6.The cost challenges

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson The cost challenges 3rd Ed testing is about 70% more expensive than 2 nd Ed. What do manufacturers do if their product has been successfully tested to the 2 nd Ed? TÜV offers ‘delta’ testing. That is, not testing the 2 nd Ed aspects which have already been done but only testing the 3 rd Ed additions. This keeps costs down a bit and shortens the testing time a bit but this is not entirely straightforward. Why? Because many of the apparently similar requirements have detail changes and therefore do not map across from 2 nd to 3 rd Eds. Nevertheless it does save testing time as TÜV has carried out a very careful clause by clause equivalence appraisal. 32

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson The cost challenges What else can our clients do to keep costs down? Prepare an insulation diagram so we don’t need to do it at increased cost. Use certified major components. Provide all the supporting documentation and certification required. Provide test reports of earlier tests (the previous model) if applicable. Do prepare a relevant Risk Management file. TÜV can provide you with a checklist for the elements you need for the 3 rd Ed. 33

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson Questions Any questions? 34

TÜV Product Service Ltd © Open Day 24 June 2010Norman Richardson 35 TÜV Product Service Ltd Octagon House Concorde Way Segensworth North Tel: +44 (0) Fareham, Hampshire Fax: +44 (0) PO15 5RL, UK Website: Thank You Norman Richardson – Medical & Health Services