New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Advanced Piloting Cruise Plot.
1
Kapitel 9. Copyright © Houghton Mifflin Company. All rights reserved.9 | 2 1. Reflexive pronouns.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
David Burdett May 11, 2004 Package Binding for WS CDL.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Create an Application Title 1A - Adult Chapter 3.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
1 Discreteness and the Welfare Cost of Labour Supply Tax Distortions Keshab Bhattarai University of Hull and John Whalley Universities of Warwick and Western.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Solve Multi-step Equations
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
PP Test Review Sections 6-1 to 6-6
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
2 |SharePoint Saturday New York City
Green Eggs and Ham.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
Name Convolutional codes Tomashevich Victor. Name- 2 - Introduction Convolutional codes map information to code bits sequentially by convolving a sequence.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
PETROLEUM CLEANUP PREAPPROVAL PROGRAM SOP UPDATE HIGHLIGHTS Florida Department of Environmental Protection February 16, 2012 Charles T. Williams Environmental.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
LO: Count up to 100 objects by grouping them and counting in 5s 10s and 2s. Mrs Criddle: Westfield Middle School.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Florida Department of Environmental Protection Petroleum Cleanup Program Contamination Notification Training February 2009 Charles T. Williams Environmental.
Subtraction: Adding UP
Indicator 1 – Number of Older Americans Indicator 2 – Racial and Ethnic Composition.
Januar MDMDFSSMDMDFSSS
Analyzing Genes and Genomes
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Energy Generation in Mitochondria and Chlorplasts
Presentation transcript:

New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of Petroleum Storage Systems

Section A : Packaged Work Scopes 2

3 A-1: Pumping Test or Multi-Phase Pilot Test (In House)  The base hrs have been changed from 12 to 10, kits from 120% to 100%  Excluded permit hrs and NPDES fee  Can now task any combination of whole or partial days (1/10 day)  Should be adjusted to nearest 1/10 day actual

4 A-2: Air Sparging And/Or Vapor Extraction Pilot Test (In-House)  Merged prior separate single or combined templates  Changed base hrs from 14 to 10, kits from 140% to 100%  Excluded permit hours  Can now task any combination of whole or partial days by 1/10  Should be adjusted to nearest 1/10 day actual

A-2: Air Sparging And/Or Vapor Extraction Pilot Test (In-House) 5 BeforeAfter

6 A-3: Monthly O&M Visit  Can be used for in house inspection to evaluate DEP-owned equipment not located at subject property for potential re-use reservation  Do not use for subcontractors

7 A-4, 5, 6: Small Medium & Large RAI Monthly Allowances  Added water level measurements

8 Section B: Office Activities, Part I 

9 B-1: Proposal Preparation  Excluded for LTNAM work orders or when only task is RAP, RAPMOD or continuation of on-going NAM or PARM

10 B-4: Site Health & Safety Plan  Must be comprehensive  Not allowed more than once per contractor, except in extenuating circumstances

11 B-5: Notice Of Discovery of Contamination Package  Includes copies of existing contamination plume maps

12 Section C : Field Activities

13 Section C : Field Activities  C-3 & 4: Drilling Setup Now 1 & 2 person options with corresponding 1 or 2 person kit Changed 2 hrs to 1 hr/person and 20% to 10% kit Excluded time for on/off site utility clearance Does not apply to well abandonment or DPT, but may apply to drilling with auger attachment only of DPT rig

14 Section C : Field Activities  C-5 through 16: SB for Soil Screening or Piezometer Install (all depths) & Single or Double Cased Well Installation Up to 40 ft Now 1 & 2 person options with corresponding 1 or 2 person kit

15 Section C : Field Activities  C-17 through 22: Single Cased Recovery or Multi-Phase Well Installation/Injection Well Installation/Soil Vapor Extraction Well Installation (all up to 40 ft) Now 1 & 2 person options with corresponding 1 or 2 person kit Added multi-phase wells and injection wells Changed MW installation kit to piezometer or remediation well installation kit Excludes TOC survey if applicable Includes ½ hr for development

Section C : Field Activities 16  Well Install: Single Case/Multi Case/ Recovery/AS/Soil VE 40’ use backup spreadsheet and enter in Section D: Other Field Work)

17 Section C : Field Activities  C- 23: Well or Piezometer Abandonment One Person Added 10% modified level D Added 10% per diem

18 Section C : Field Activities  C-25, 26, 29, 30: Well Sampling with Water Level and Area Survey Now 1 & 2 person options with corresponding 1 or 2 person kit

19 C-31 Through 34: Oversight Kits & Per Diem  All may be tasked in any* combination of whole or partial day (1/10 day) *Per diem requires > 1 consecutive day of field work, otherwise prorated to 1/10 day  Oversight Kit is 2 person soil assessment kit less per diem (one size fits all) For field work (includes required sampling and testing equipment)  Oversight Allowance has vehicle and modified level D for 2 persons (one size fits all) For use when sampling/testing equipment is not required

Section C: Field Activities BeforeAfter 20

21 Section H: Office Activities, Part II

22 H-1: General/SA Report  Changed 25% to 20% of field work in sections C & D  Not used after SAR approval  Reiterate existing $10K cap per work order

23 H-2: Letter/NPDES Report  Though limited to quarterly, includes 3 monthly discharge reports on DEP form (10)

24 H-4: O&M Annual Report  Must be signed and sealed by registered P.E.

25 H-7 Through 10: RAP or RAPMOD, All Levels, Full & Limited Scope  Must be signed and sealed by registered P.E.  No proposal prep allowed if only scope of work

H-14: Construction Drawings and Specifications  Generally not allowed in conjunction with source removal work orders 26

H-15: Bid Package, Solicitation and Evaluation  This document should be prepared either subsequent to or concurrent with the preparation of construction drawings (used to say prior to) 27

H-19: Long Term Natural Attenuation Plan  For LTNAM only  No proposal prep if only scope of work 28

H-20 & 21: RA Interim and General RA Reports  Use depends on the level of effort  See Template Descriptions in Appendix A.1  See SOP Section for template report options for SSA during RA Phase 29 September 25, 2007

Section H: Office Activities, Part II BeforeAfter 30

Template Report Options for SSA During RA Phase  Section – Three template report options H-20: RA Interim Report – use directly if sampling 10 or less MWs or installing & sampling 3 or less MWs/borings H-21: RA General Report – use equivalent in ‘Other’ report type (H-26) if sampling 10 to 20 MWs or installing & sampling 4 to 10 MWs/borings H-17: Soil Source Removal Report – use equivalent in ‘Other’ report type (H-26) if sampling more than 20 MWs or installing & sampling more than 10 MWs/borings 31

Template Equipment Kits (18)  All kits, except In-House RAC, FP Recovery and Oversight split into 1 & 2 person options  Added Oversight Kit (with equipment) and Oversight Allowance (no equipment), excludes per diem, one size covers 1 or 2 persons  Added wash tubs, garbage can/bags, rake, sample labels and step ladder to example expendables list 32

Equipment Rate Schedule: (1 and 2 Person Options) 33

Equipment Rate Schedule: Oversight Kits 34

Equipment Rate Schedule: Added Expendables 35

SOP Appendix A.1  The preapproval template workbooks, template descriptions, template breakdown, and template equipment kit rate schedules can be found in SOP Appendix A.1  THE END 36