1-800-DIG-SAFE. KUUDPA Regulation Update Regulatory Process Department of Administration  Submitted: January 2005  Approval Received: July 2005 Attorney.

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

1 Industry Brief Apr Outline How is Alberta preparing? How is Alberta preparing? Albertas Health Response Albertas Health Response Albertas Operational.
1 Welcome Safety Regulatory Function Handbook April 2006.
New Jersey Election Law Enforcement Commission Pay-to-Play January 2013.
Goals for 2003 Kansas Interconnection Standards Development Larry Holloway Chief of Energy Operations Kansas Corporation Commission.
Report to TACIR on Underground Utility Damage Prevention in Tennessee
The Regulatory Perspective
Surface Mine Safety Regulation 25 PA Code Chapter 209.
Tennessee Advisory Commission on Intergovernmental Relations September 2010.
Site Safety Plans PFN ME 35B.
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
THE DEPARTMENT OF HEALTH AND HUMAN SERVICES (HHS) OFFICE FOR CIVIL RIGHTS (OCR) ENFORCES THE HIPAA PRIVACY, SECURITY, AND BREACH NOTIFICATION RULES HIPAA.
IBM Corporate Environmental Affairs and Product Safety
EMS Checklist (ISO model)
CAERNARVON TOWNSHIP LANCASTER COUNTY June 17, 2013.
Effective Contract Management Planning
Subsidy Contract Lead Partner seminar October 2008, Riga Arina Andreičika Managing Authority
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Damage Prevention Programs Notice of Proposed Rulemaking.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
J Garza Consulting and Associates 1 Pilot Car Escort Certification Model For State Implementation.
Compliant and Sound Financial Practices. Unit Finances Do not take handling money lightly. The Treasurer must be honest, above board with all transactions,
Miss Utility Maryland Law Change Effective October 1, Minute Overview.
Bangor Water Districts Experience With Gas. Bangor Water Districts Experience With Natural Gas.
General OH&S Induction Training Course 1 WHAT’S SO IMPORTANT ABOUT OCCUPATIONAL HEALTH & SAFETY? IN THE YEAR 2003, MORE PEOPLE WERE KILLED IN WORK RELATED.
1 Important Changes to the Victorian Electricity Industry for Electrical Infrastructure Civil Works 1 July 2009.
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
NSW Work Health & Safety Act Module: H&S Committees – Roles and Functions 1.
Greater Chicago Damage Prevention Council REQUESTING PERMITS Excavator Responsibilities (Contractual and Municipal) A permit is required for any excavation.
Coastal Use Permit Program Pipeline Permitting Coastal Use Permit Program Pipeline Permitting Scott Angelle, Secretary Louisiana Department of Natural.
What CQC do CQC are the health and social care regulator for England CQC register and monitor all health and social care providers in the country to ensure.
FLORIDA - Bill 1178/979 In Florida, it is lawful to capture drone images for circumstances including : 1. Professional or scholarly R&D by a person affiliated.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Damage Prevention PHMSA Update Annmarie Robertson PHMSA/Office.
Railroad Commission of Texas Railroad Commission of Texas Pipeline Safety Division Damage Prevention Program.
4/23/2015 P.E.S.A.W.(public employees safe at work) 1 Safety Webinar: Hazard Communication and “Your Right to Know” Sponsored by the Georgia Department.
Call Before you dig Safe digging is no accident. Alberta Damage Prevention Council.
Crossing Agreements Canadian Best Practice Crossing Agreements A Canadian Best Practice Brad Watson TransCanada Pipelines and Alberta Common Ground Alliance.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
Georgia underground marking standards
Notices of Violation, Orders to Cease Operation and Consent Orders.
Pesticide Container-Containment Regulations: FIFRA 19(f)(2) Determinations of Adequacy.
Montana Safe Digging Law 2014 Joint Engineers Conference Thu - Nov :00am-11:30am.
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
Utilities in MaineDOT’ s Right of Ways. MaineDOT’ s Jurisdiction All State and State Aid roads. All Facilities and.
Conversation on the Chemical Facility Anti-Terrorism Standards (CFATS) and Critical Infrastructure Protection Chemical-Terrorism Vulnerability Information.
SB 490 Amendments to the Kansas Underground Utility Damage Prevention Act Effective January 1, 2003.
| Part 1: Background About Georgia 811 Georgia Dig Law Notification requirements Penalties Hours of operation Positive Response.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline and Hazardous Materials Safety Administration Program.
OH&S Management System
Introduction to Construction General Permit Inspections.
Regulatory Aspects of the Underground Hydrocarbon Storage (UHS) Program and the Role Contractors Have in This Lyons Celebration Center, Lyons, Kansas February.
Comprehensive Review of the Public Safety Communications Center Phase 2 Report County of Dane, WI February 12, 2009.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
Damage Prevention – Are States as engaged as they need to be ? Pipeline Safety Trust Meeting November 20, 2008 New Orleans, LA Glynn Blanton, PHMSA State.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Damage Prevention Update and Damage Prevention Rulemaking Sam.
Upgrades to ODE Collaboration Center and New Complaint Form and Procedures January 15, 2015.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Meet your Regulator Workshop with FANR licensees October 2011 Dr. John Loy Director, Radiation Safety Federal Authority for Nuclear Regulation.
Improving Compliance with ISAs Presenters: Al Johnson & Pat Hayle.
Chicago Area Facilities (CAF) Ground Disturbance and Excavation Procedure.
Kentucky Pipeline Safety Seminar
Effective Damage Prevention Programs
Georgia underground marking standards
U. S. Department of Transportation
Melissa Holbrook Kentucky Public Service Commission September 19, 2017
2018 MDPB Annual Meeting May 24, 2018
Presentation transcript:

1-800-DIG-SAFE

KUUDPA Regulation Update

Regulatory Process Department of Administration  Submitted: January 2005  Approval Received: July 2005 Attorney General Review  Submitted: August 2005  Denied Approval: October 2005

Senate Bill 464 The KCC shall have full power and authority to adopt all necessary rules and regulations for carrying out the provisions of KUUDPA.

Regulation Status KCC legal “Going Downtown Soon.”

KUUDPA Exemptions Excavation does not include:  Tilling for normal agricultural purposes.  RR road or ditch maintenance.  Operations related to exploration and production of crude oil or gas.

KUUDPA Exemptions Excavator does not include:  Homeowners excavating on their own premise.

KUUDPA Exemptions Facility does not include:  Water utilities  Sewer utilities  Production lines, gathering lines, injection lines, and salt water disposal lines outside of a city.

KCC Review of KUUDPA Exemptions Summer of 2006 meeting:  Water; Sewer  KRWA  League of Municipalities  KIOGA; EKOGA  Kansas One Call

Other Summer Activities: 06-GIMX-491-COM SWBT Complaint against Electric utilities disconnecting common ground. Response is SWBT making unauthorized underground connections.

Other Summer Activities: Telecom Construction Practices General Investigation into need for Construction Standards for Telecom Infrastructure.  Westar complaints about direct buried cable through utility poles.  Depth of burial of telecom service drops.

Other Summer Activities: KDOT Proposal KDOT letter October 2005 “Project delays and large unexpected costs due to waiting on utilities to be moved, undetected utilities, misplaced utilities have been and are big problems on roadway construction projects……”

Other Summer Activities: KDOT Proposal KCC suggested a need for more formalized agreements at preconstruction meeting. KCC agreed to facilitate a meeting to discuss possible outcomes.

Other Summer Activities: Status of 811 Docket 06-GIMT-049-GIT Recent order requesting update on status.  Request includes KOC asking for response on what they have obtained to date.

Other Summer Activities: DOT,DIMP & You Distribution Integrity Management  Nine Objectives Proposed by DOT for improvement of States’ One Call Laws.

Other Summer Activities: DOT,DIMP & You 1. Enhanced communication between operators and excavators. 2. support and partnership of all stakeholders in enforcement, system improvement, etc. of the program. 3. Operator’s use of performance measures for persons performing locates.

Other Summer Activities: DOT,DIMP & You 4. Partnership in employee training. 5. Partnership in public education. 6. Enforcement agencies’ role as partner and facilitator to help resolve issues. 7. Fair and consistent enforcement of the law.

Other Summer Activities: DOT,DIMP & You 8. Use of technology to improve all parts of the process. 9. Analysis of data to continually evaluate/improve program effectiveness.

Other Summer Activities: DOT,DIMP & You Federal legislation is likely needed to support the development and implementation of such programs by all states. Work on this legislation can begin immediately.

Docket 06-MEXP-562-SHO Docket for Miles Excavating to show cause why they should not be fined $7,500 for failing to wait 2 days before beginning excavations, (3 times). Miles Excavating ordered to pay $7,500 in penalties.

Docket 06-GIME-076-GIE Docket regarding KCP&L and Northern Pipeline in which an excavator was injured after striking a buried primary electric line – “unless otherwise agreed between the parties” Question of a meet on site.

Docket 06-GIME-076-GIE Settlement agreement reached with KCPL: QC Program with contract locators. All meet on sites must be documented. KCPL not assessed a penalty.

Johnson County KUUDPA Inspector: 2005 Results 2005 Damage Investigations 105 Damages 74% Excavator error 20% Operator error 27% Total Had No Ticket 6 Outside Scope of Ticket 3 Digging Before Due Date 16 No Ticket Called to One-Call Center 4 Past Ticket Life 6 Piggy Backing

Johnson County KUUDPA Inspector: 2006 To Date Damage Investigations 44 Damages 48% Excavator error 25% Operator error 11% Total Had No Ticket 1 Outside Scope of Ticket 3 Digging Before Due Date 5 No Ticket Called to One-Call Center 3 Past Ticket Life

Johnson County KUUDPA Inspector: 2006 To Date Miscellaneous Information 158 Random Ticket Audits  95-98% Completed on Time 25 Excavator Non Compliances 14 Operator Non Compliances 68% Gas Line Hits Were Mains

Use of KOC Reports Aid the One-Call Inspector in the Kansas City Area with damages and audits. Improve education efforts of individual excavators. Identify types of construction that need more attention.

Johnson County KUUDPA Inspector: 2005 Results Logging all damage information into CGA DIRT reporting system.

EXCAVATION EQUIPMENT FAC DAMAGED AUGER BACKHOE DIRECTIONAL DRILLING GRADESCAPE HANDTOOLS TRENCHER UNKNOWN ELECTRIC NATGAS Type of Equipment Damaging Electric or Gas

TYPE OF WORK PERFORMED FAC DAMAGED CONSRUCTION ELECTRIC NAT GAS IRRIGATION LADNSCAPING POLE ROAD WORK SEWER STORM DRAIN TELECOMMUNICATIONS UNKNOWN WATER ELECTRIC NATGAS TELECOM Type of Work Performed by Excavator SITE DEVEL CATV

Air pressure tested gas main removed by an excavator to make room for electrical conduit. Excavator did not notify facility owner of the damage.

Air pressure tested gas main removed by an excavator to make room for electrical conduit. Excavator did not notify facility owner of the damage.

Excavator digging within the tolerance zone with a 2 ft auger.

N S E W DAMAGE

… found excavator to be in violation of K.S.A Emergency excavations, since the type of work did not meet the definition of an Emergency. Probable Non-Compliance Responses Scenario 1

Probable Non-Compliance Responses Response I remorsefully accept your findings of Non- compliance. I have taken steps to research regulation Emergency excavations, and would like to assure you I fully comprehend what requirements should be satisfied in order to be compliant and intend to do so immediately. Furthermore, I would like to extend my appreciation for your tolerance with regard to this issue and hope I have fulfilled your request accordingly.

Probable Non-Compliance Responses Scenario 2 The locator.. failed to locate the main going West

Probable Non-Compliance Responses Response The damage occurred due to a main installation on a cul-de-sac that went further past the last meter than normal. There are 2 steps being taken to address this issue. 1.New installations are requiring a permanent marking of the end of the main. 2.For older installations on cul-de-sacs, it will be required to refer to as built drawings to determine the end of the main.

Probable Non-Compliance Responses Scenario 3 There was a valid ticket and was marked within tolerance. There was lack of prudent care taken to protect this facility. K.S.A. violation

Probable Non-Compliance Responses Response We accept your findings. Operator had properly hand dug and located all lines when in the process of cleaning up the trench, the excavating bucket hit/pulled on a rock which cased the gas line to slightly break. Operator will exercise reasonable care when working around lines.

KCC Annual Invitational Damage Survey

Survey Size 103 Operators Received more than 2000 locate requests. Represents 93% of the total locates Requested. Only 36 Operators Responded.

Survey Accuracy ?!? Represents only 53% of Tickets received by the 103 operators.

Survey Demographics Damages Reported (survey) Electric 120.2% Gas 1,39532% Phone 2,61260% Water 521.2% Sewer 300.6% Cable % “Other“ 50.1% Total Damages Reported 4,329

Survey Interpretations? With new Regulations, they will be MUCH BETTER next year.