RA-2/MWR CCVT Plenary Meeting 12/Sep/2001 1 Data Circulation Presentation Overview Rehearsal summary RA-2/MWR data circulation during commissioning phase.

Slides:



Advertisements
Similar presentations
Testing Relational Database
Advertisements

Copyright © 2001, Prentice Hall, Inc. CHAPTER 15.
SIP, Presence and Instant Messaging
Fall VoN 2000 SIP for IP Communications Jonathan Rosenberg Chief Scientist.
Texas Digital Library Services Preservation Network.
ASIAES Project Overview Satellite Image Network for Natural Hazard Management in ASEAN+3 region Pakorn Apaphant Geo-Informatics and Space Technology Development.
17 Copyright © 2005, Oracle. All rights reserved. Deploying Applications by Using Java Web Start.
Centre for Strategy & Evaluation Services Evaluation of the SME Funding Schemes - summary European Agency for Safety and Health at Work.
ECMWF June 2006Slide 1 Access to ECMWF data for Research Manuel Fuentes Data and Services Section, ECMWF ECMWF Forecast Products User Meeting.
The Five Ss.
Configuration management
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
1 Online communication: remote login and file transfer.
Michelle Mizumori Director of Reliability Coordination
3rd Plenary MeetingRA-2/MWR Cross-Cal & Val Team, ESRIN 12/09/01 Third Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting Jérôme.
6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 Sixth Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting.
05/Dec/20018th Envisat Plenary Meeting1 RA-2/MWR CCVT readiness status RA-2/MWR CCVT Rehearsal requirements: –It is recommended that the rehearsal focus.
8th EnviSat Calibration and Validation Progress Meeting ESRIN, 05/12/01 1 RA-2/MWR Level 2 algorithms verification and products validation group status.
Ch 11 Distributed Scheduling –Resource management component of a system which moves jobs around the processors to balance load and maximize overall performance.
Kpmg 1 Industry Consultative Group 14 July 2000 Broadband Fixed Wireless Access 40GHz BFWACG(00)36 Market and financial modelling Preliminary Findings.
Module 12 WSP quality assurance tool 1. Module 12 WSP quality assurance tool Session structure Introduction About the tool Using the tool Supporting materials.
Implementing A Simple Storage Case Consider a simple case for distributed storage – I want to back up files from machine A on machine B Avoids many tricky.
DOSTAG Meeting #51, 3 rd May 2007 Access to ESA Earth Observation data (past and current missions)
How Clients and Servers Work Together. Objectives Web Server Protocols Examine how server and client software work Use FTP to transfer files Initiate.
Applied Software Project Management Andrew Stellman & Jennifer Greene Applied Software Project Management Applied Software.
File Transfer: FTP and TFTP
How Clients and Servers Work Together. Objectives Learn about the interaction of clients and servers Explore the features and functions of Web servers.
Application Layer  We will learn about protocols by examining popular application-level protocols  HTTP  FTP  SMTP / POP3 / IMAP  Focus on client-server.
File Transfer Protocol (FTP)
Introduction to Streaming © Nanda Ganesan, Ph.D..
Chapter 31 File Transfer & Remote File Access (NFS)
1 CMSCD1011 Introduction to Computer Audio Lecture 10: Streaming audio for Internet transmission Dr David England School of Computing and Mathematical.
Week 11 Further Web Design Concepts and Tools FTP, CMS, Wordpress and Responsive Web Design.
Research on cloud computing application in the peer-to-peer based video-on-demand systems Speaker : 吳靖緯 MA0G rd International Workshop.
The aim We had to “build” a laptop from scratch. We needed to install the software and the Operating system needed. We came across all sorts of problems.
System Testing There are several steps in testing the system: –Function testing –Performance testing –Acceptance testing –Installation testing.
Customized cloud platform for computing on your terms !
Session Session 26 SAIG (Title IV WAN) Connectivity.
 Introduction to Operating System Introduction to Operating System  Types Of An Operating System Types Of An Operating System  Single User Single User.
Four Phases of Report Authoring Targeted for Executives and Upper Management By: Ben Aminnia President, L.A. SQL Server Professionals Group
Home Media Network Hard Drive Training for Update to 2.0 By Erik Collett Revised for Firmware Update.
Presentation by Clare Drew – Goss Interactive Steve Thomson – All Wales Unit.
By Touseef Tahir Software Testing Basics. Today's Agenda Software Quality assurance Software Testing Software Test cases Software Test Plans Software.
System Analysis of Virtual Team Collaboration Management System based on Cloud Technology Panita Wannapiroon, Ph.D. Assistant Professor Division of Information.
Streaming Media A technique for transferring data on the Internet so it can be processed as a steady and continuous stream.
Page 1 ENVISAT Validation Workshop, 9 – 13 Dec 02, ESRIN AATSR Cal/Val Data Distribution Hannah Tait AATSR System Analysis Engineer (EOP-PPP) ESA ESTEC.
Swift HUG April Swift data archive Lorella Angelini HEASARC.
Project Launch Presentation. Overview  Group Members: Joshua Booth Jiajia Jiang Weijuan Shi  Client: G & T Security.
SWE 622- Distributed Systems Project Phase I Eric Barnes, David Chang, David Nelson Fisayo Oluwadiya, Xiang Shen.
S O A P ‘the protocol formerly known as Simple Object Access Protocol’ Team Pluto Bonnie, Brandon, George, Hojun.
National Aeronautics and Space Administration Aquarius Validation Data System Overview and Status Algorithm Workshop March 21-22, 2007 John Gunn Earth.
1 Day 2 Logging in, Passwords, Man, talk, write. 2 Logging in Unix is a multi user system –Many people can be using it at the same time. –Connections.
Understand Click Once Deployment Windows Development Fundamentals LESSON 5.1B.
«Media Monitoring Centre» Company Presentation Media Monitoring, Media Analysis, Information Services.
Website Design:. Once you have created a website on your hard drive you need to get it up on to the Web. This is called "uploading“ or “publishing” or.
Enterprise Network Systems TCP Mark Clements. 3 March 2008ENS 2 Last Week – Client/ Server Cost effective way of providing more computing power High specs.
File Transfer And Access (FTP, TFTP, NFS). Remote File Access, Transfer and Storage Networks For different goals variety of approaches to remote file.
Power Guru: Implementing Smart Power Management on the Android Platform Written by Raef Mchaymech.
INTERNET APPLICATIONS CPIT405 Install a web server and analyze packets.
Component D: Activity D.3: Surveys Department EU Twinning Project.
An informal, team oriented, OO design system
Applied Software Testing
Session
Warm Handshake with Websites, Servers and Web Servers:
File Transfer: FTP Objectives Chapter 19
Application layer Lecture 7.
Meeting, training & teaching in the interactive iWorld
Point 6. Eurostat plans for Time Use Survey data processing and dissemination Working Group on Time Use Surveys 10 April 2013.
Algorithms for Selecting Mirror Sites for Parallel Download
Exceptions and networking
Presentation transcript:

RA-2/MWR CCVT Plenary Meeting 12/Sep/ Data Circulation Presentation Overview Rehearsal summary RA-2/MWR data circulation during commissioning phase RA-2/MWR data circulation requirements –Envisat products distribution –Other products distribution Readiness

RA-2/MWR CCVT Plenary Meeting 12/Sep/ Rehearsal : RA-2/MWR CCVT rehearsal results RA-2/MWR CCVT participation to the 2nd Envisat rehearsal campaign - based on reports received by the RA-2/MWR CCVT coordinator: –11 participants out of about 26 Pis, including RA-2 Absolute Cal. Team USF interactive functions performance evaluation results: –All participating members have tried out USF functions –Evaluation expressed as Poor/Average/Good –An overall average evaluation rating may be collocated between Poor and Average. USF batch function (Perl I/F) performance evaluation results: –The batch Perl I/F has been tested by two team members –The rating is Good.

RA-2/MWR CCVT Plenary Meeting 12/Sep/ Rehearsal : Frequently reported issues No RA-2/MWR Level 2 products were available, making the rehearsal less interesting for most RA-2/MWR CCVT members. The system is poorly designed and too complex for accessing RA- 2/MWR data. The USF GUI has been generally found requiring too many operations to perform simple RA-2/MWR product orders. Many transitory glitches have been encountered, slowing down the rehearsal run. The system looked sometimes overloaded. Number of FTP downloads could be reduced by including several files in one transfer session. USF client doesn’t run on Apple/Mac platforms. An easy-to-access FTP archive is suggested by many users for straight forward data access.

RA-2/MWR CCVT Plenary Meeting 12/Sep/ Rehearsal : Non Envisat data circulation A data circulation exercise has been carried out by few RA-2/MWR CCVT members for non-Envisat data, namely data needed for Cal/Val activities from ERS-2 satellite, other satellites and in-situ measurements. The exercise has run in parallel to the rehearsal, and has been mainly focused to test the circulation of data as OPR01 and WAP01. Circulation of OPR01 products takes places since long and is originated from the F-PAF on-line on a FTP server. Some new user new to this could test the access successfully. The WAP01 product is specifically though for the Envisat commissioning phase, and is not yet available. The circulation of non-Envisat data has been run successfully.

RA-2/MWR CCVT Plenary Meeting 12/Sep/ Rehearsal : Conclusions The rehearsal experience highlighted the fact that today the USF is not fully suitable for RA-2/MWR CCVT data circulation requirements. –The USF is considered poorly designed for RA-2/MWR users needs, a simpler FTP archive distribution mechanism is often indicated as preferred to the USF. –RA-2/MWR CCVT members typically need standing orders over a long period of time, resulting in a great number of items hard to handle with the USF at present. The alternate USF “Subscription” mechanism currently under implementation will better fulfill RA-2/MWR data distribution requirements.

RA-2/MWR CCVT Plenary Meeting 12/Sep/ Data Circulation During Commissioning Phase In parallel to the USF another data distribution mechanism will be set- up in a “subscription” fashion for “standing” data distribution. This mechanism allow products to be distributed to a list of subscribers as soon as they are available. The USF will be available, and may be used by RA-2/MWR CCVT members orders on request. –Orders via the USF shall be executed from a single user acting as coordinator for the whole CCVTeam. –CCVT members who plan to order through the USF shall send requests to the data circulation coordinator who will actually enter the order to the USF.

RA-2/MWR CCVT Plenary Meeting 12/Sep/ Data Circulation During Commissioning Phase Subscription-mode distribution of Envisat RA-2/MWR products will take place through: Satellite broadcast (DDS) –DDS distribution is planned for RA2 Level 0 and Level 1b products. Receiving equipment is needed, existing receiving station will be used. FTP transfer –MWR Level 0, NRT RA-2/MWR (FDGDR, FDMAR), DORIS products are planned to be disseminated through FTP archives accessible on the Internet to a list of subscribers on a daily basis. Users will get requested data initiating the transfer from their FTP client.

RA-2/MWR CCVT Plenary Meeting 12/Sep/ Data Circulation During Commissioning Phase Physical media distribution –Off-Line RA-2/MWR products (IMAR, IGDR, GDR, SGDR) are planned to be distributed according to product subscription lists. The delivery delay is expected to be of 3-5 days for IGDR and IMAR, and less than 50 days for GDR and SGDR. Products will be delivered on CD-ROM, as resulting the preferred medium for CCVT members. CCVT members shall expect one CD-ROM per day, or at least two for those receiving SGDR.

RA-2/MWR CCVT Plenary Meeting 12/Sep/ RA-2/MWR CCVT data circulation requirements Subscription lists are provided according to CCVT member data requirements. Envisat standard products distribution:

RA-2/MWR CCVT Plenary Meeting 12/Sep/ RA-2/MWR CCVT data circulation requirements Other products distribution: –ERS-2 products: »OPR01: This is the ERS-2 OPR product built from preliminary orbits instead of precise ones, as to reduce its latency to about 4 weeks. Circulation of OPR01 products takes places since long and is originated from the F-PAF on-line on a FTP server. Availability of the service to interested CCVT members has been tested as part of the rehearsal. »WAP01: This is the ERS-2 WAP product built from preliminary orbits instead of precise ones, as to reduce its latency to about 6 weeks. Circulation of WAP01 products is not yet set-up as it is designed specifically for RA-2/MWR CCVT needs. It will be originated from the UK-PAF and made available on a FTP server.

RA-2/MWR CCVT Plenary Meeting 12/Sep/ RA-2/MWR CCVT data circulation requirements OPR01 authorized users list: –BENVENISTE jerome –MOORE philip –COTTON david –SHUM ck –SCHAROO remko –LILLIBRIDGE john –QUEFFEULOU pierre –DORANDEU Joel To be added: –W.BOSCH, L. FENOGLIO- MARC, C. REIGBER WAP01 potential users list: –BENVENISTE jerome –BERRY Philippa –BRENNER Anita/ZWALLY Jay –LAXON Seymour/ BAKER Steven

RA-2/MWR CCVT Plenary Meeting 12/Sep/ RA-2/MWR CCVT data circulation requirements –ERS-2 products: »Standard ERS-2 products: ERS-2 products are available as usual. It is assumed that CCVT members which plan to make use of ERS-2 products at commissioning phase have already access. –BUFR formatted products: »BUFR formatted products will be distributed from LRAC and will be available on a FTP server. Interested users will receive access information as username and password to log on and get data as available. –Software to decode BUFR exists.

RA-2/MWR CCVT Plenary Meeting 12/Sep/ RA-2/MWR CCVT data circulation requirements –Envisat non-standard products for passive calibration: »The passive calibration activity requires some products to be further processed and distributed in a non-standard state, under the responsibility of the IECF. The distribution to the interested CCVT member (Pierdicca at Univ. of Rome) will be done through the CCVT web site and/or FTP server.

RA-2/MWR CCVT Plenary Meeting 12/Sep/ Readiness Open issues: –A new rehearsal will take place before launch as soon as the USF is open again. The rehearsal will be conducted by the data circulation coordinator only. –Distribution paths based on the subscription mechanism are to be open before launch. –WAP01 distribution path to be open before launch. –BUFR distribution path to be open before launch. Freeze of RA-2/MWR CCVT data requirement: –RA-2/MWR CCVTeam data requirements are considered “frozen” as they are presented in this meeting.