23-24 March 2006PMO-III workshop Hamburg BUFR… How it affects the PMO.

Slides:



Advertisements
Similar presentations
LAD :,, * 50 pa 50% 50% 24
Advertisements

1 ERD 2012 ITRS Spring Conference – Noordwijk, the Netherlands – Apr. 24, 2012 ITRS Public Conference Emerging Research Devices 2012 ERD Chapter Victor.
Wrap-up session III Module 3.2 – Alignment of the Accreditation Procedures 1 st Sustainable Development Mechanisms Joint Coordination Workshop Maritim.
Managing the Statutory Requirements for Assessment April 2011.
Mathematics Probability: Monty Hall Science and Mathematics Education Research Group Supported by UBC Teaching and Learning Enhancement Fund
Graeme Ball VOS Program Manager, Australia Chairman, Ship Observations Team PMO-III, March 2006, Hamburg, Germany. Information Exchange & VOS Promotion.
Graeme Ball VOS Program Manager, Australia Chairman, Ship Observations Team PMO-III, March 2006, Hamburg, Germany. PMO Support for the XBT SOOP.
MU.COM. PROJECT Marco Merlini, Irene Salerno COURSE FINAL TUNING AND SCHEDULE Second Transnational Workshop Sibiu, 9 March 2012.
Dr. Chantal Lacroix PROGRAMME MANAGER DEPUTY HEAD OF MISSION
FM 94 BUFR and FM 95 CREX Table Driven Code Forms (or “Self-descriptive” Code Forms). The term "self-descriptive" means that the form and content of the.
23-24 March 2006PMO-III workshop Hamburg TurboWin New developments.
JCOMMOPS as Portal for WMO No. 47 World Meteorological OrganizationIntergovernmental Oceanographic Commission of UNESCO Ship Observations Team ~ integrating.
World Meteorological OrganizationIntergovernmental Oceanographic Commission of UNESCO SOT Terms of Reference Ship Observations Team ~ integrating and coordinating.
SOT Introduction and Goals of SOT-IV World Meteorological OrganizationIntergovernmental Oceanographic Commission of UNESCO Ship Observations Team ~ integrating.
6 th RARS IG-Meeting 25 th - 26 th,Oct/2012 (EXETER - UK) INPE/INMET Brazilian Institute for Space Research National Institute of Meteorology Sérgio de.
SOT-IV DAC ReportNOAA’s National Climatic Data Center VOSClim Data Assembly Center Ingest GTSBUFR Marine Processing System VOSClim Web Page GCC FTP Server.
Graeme Ball VOS Program Manager, Australia Chairman, Ship Observations Team PMO-III, March 2006, Hamburg, Germany. Ship’s Metadata & WMO-No. 47.
Graeme Ball VOS Program Manager, Australia Chairman, Ship Observations Team PMO-III, March 2006, Hamburg, Germany. Ship’s Safety & Security.
Julie Fletcher Manager Marine Observations, NZ Chair, VOS Panel PMO-III, March 2006, Hamburg, Germany. Ship Inspections.
World Meteorological OrganizationIntergovernmental Oceanographic Commission of UNESCO Ship Observations Team ~ integrating and coordinating international.
World Meteorological OrganizationIntergovernmental Oceanographic Commission of UNESCO Ship Observations Team ~ integrating and coordinating international.
TechStat Presented By, Agency Seal. TechStat Thesis 2 Point 2 Point 1 Point 3.
Tribunal User Group 25 th March Tribunal Activity 2013/2014 as at 24 March 2014 Benet Brodie, Secretary 25 March 2014.
Instructions for ??????????????????????????? What you will make What you will need What to do
Recipe for ??????????????????????????????? What you will make Ingredients What to do
20-21 March 2006E-SURFMAR VOS-TAG III Hamburg PMO/VOS status report The Netherlands: 2005.
© G. Rott Page 1 Career Development and Contexts: Reflecting Experiences, Identifying Common Ground and Exploring Opportunities - Workshop - EOPPEP - ELESYP.
Dorina Edgar Head Curriculum Entitlement Team Department of Education.
1 © Crown copyright 2003 GRAS SAF User Workshop Helsingør, Denmark, June 2003 WMO BUFR Format for NRT Dissemination of RO Data Dave Offiler.
Algebra Recap Solve the following equations (i) 3x + 7 = x (ii) 3x + 1 = 5x – 13 (iii) 3(5x – 2) = 4(3x + 6) (iv) 3(2x + 1) = 2x + 11 (v) 2(x + 2)
VOS data com. systems SystemServiceFormat Tranmitter + Anten. cost Cost per report Coverage Delivery way Remark Inmarsat-CStdASCII0 € (GMDSS)1.00 €Global.
1 Financial Mathematics Clicker review session, Midterm 01.
1 Financial Mathematics Clicker review session, Final.
1 Financial Mathematics Clicker review session, Midterm 01.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
Phase Difference = Phase Difference = 0.05.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
23-24 March 2006PMO-III Workshop Hamburg PMO/VOS status report The Netherlands: 2005.
8.1.4 Can it still be factored? Factoring Completely I can factor out a common factor.
基 督 再 來 (一). 經文: 1 你們心裡不要憂愁;你們信神,也當信我。 2 在我父的家裡有許多住處;若是沒有,我就早 已告訴你們了。我去原是為你們預備地去 。 3 我 若去為你們預備了地方,就必再來接你們到我那 裡去,我在 那裡,叫你們也在那裡, ] ( 約 14 : 1-3)
ΟΡΓΑΝΩΣΗ ΚΑΙ ΔΙΟΙΚΗΣΗ ΕΠΙΧΕΙΡΗΣΕΩΝ 3 Ο ΜΑΘΗΜΑ. ΟΙ ΜΕΓΑΛΕΣ ΕΠΙΧΕΙΡΗΣΕΙΣ Η δημιουργία μεγάλων επιχειρήσεων είναι ένα από τα χαρακτηριστικά του 20 ου αιώνα.
WIGOS Implementation Activities in RA IV
Management Thinking Tools
Binary Universal Form Representation (BUFR) Paul Hamer November, 2009
The Perfect Marriage! Ephesians 5:21-33.
Two way tables CoachRailCarAirTotals Jan Feb Mar Total
WMO, World Weather Watch, Data Processing and Forecasting Systems)
ФОНД ЗА РАЗВОЈ РЕПУБЛИКЕ СРБИЈЕ
1.
Слайд-дәріс Қарағанды мемлекеттік техникалық университеті
.. -"""--..J '. / /I/I =---=-- -, _ --, _ = :;:.
Gulf of Honduras Task Group 1 Process
PMO Advisor / Marine Networks
II //II // \ Others Q.
Как да кандидатстваме по НИФ
ОПЕРАТИВНА ПРОГРАМА “ИНОВАЦИИ И КОНКУРЕНТОСПОСОБНОСТ“ „Подобряване на производствения капацитет в МСП“
'III \-\- I ', I ,, - -
Coding issues BUFR Binary Universal code Form for the Representation of meteorological data Binary Table driven code form (BUFR, CREX) Efficient compression.
Figure 8. Stages within the Phases of the Process
Review Electronic Logbooks
Structure of the final report
Index Notation Sunday, 24 February 2019.
2) For each of the finite state machines above, use the sets derived in part 1) to produce the following:   i.                  a set of sequences that.
Solving Equations 3x+7 –7 13 –7 =.
Graphing Rational Functions
Example Make x the subject of the formula
A GUIDE TO EFFECTIVE PRACTICES FOR RCM MEMBER COUNTRIES
Gulf of Honduras Task Group 1 Process
,, 'III \-\-
U A B II III I IV 94.
Presentation transcript:

23-24 March 2006PMO-III workshop Hamburg BUFR… How it affects the PMO

23-24 March 2006PMO-III workshop Hamburg BUFR… How it affects the PMO IT DOESN’T How it affects the PMO IT DOESN’T

23-24 March 2006PMO-III workshop Hamburg BUFR… How it affects the PMO IT DOESN’T (well…, hardly) How it affects the PMO IT DOESN’T (well…, hardly)

23-24 March 2006PMO-III workshop Hamburg BUFR… What is BUFR? Binary Universal Form for the Representation of meteorological data What is BUFR? Binary Universal Form for the Representation of meteorological data

23-24 March 2006PMO-III workshop Hamburg BUFR… Why BUFR? Self descriptive Flexible Expandable Why BUFR? Self descriptive Flexible Expandable

23-24 March 2006PMO-III workshop Hamburg BUFR… Does not affect SHIP messages alone Will be in effect across the GTS in 2013 Transition period to migrate from SHIP to BUFR during During migration BUFR and SHIP on GTS Translation at NMC’s Does not affect SHIP messages alone Will be in effect across the GTS in 2013 Transition period to migrate from SHIP to BUFR during During migration BUFR and SHIP on GTS Translation at NMC’s

23-24 March 2006PMO-III workshop Hamburg BUFR… Phase I SHIPSHIP SHIPSHIPBUFRBUFR

23-24 March 2006PMO-III workshop Hamburg BUFR… Phase I SHIPSHIP Staticmeta-data(Pub47)Staticmeta-data(Pub47) BUFRBUFRSHIPSHIP

23-24 March 2006PMO-III workshop Hamburg BUFR… Chance to improve SHIP AND BUFR Add VOSClim elements Add static meta-data Add operational meta-data Chance to improve SHIP AND BUFR Add VOSClim elements Add static meta-data Add operational meta-data

23-24 March 2006PMO-III workshop Hamburg BUFR… Phase II SHIP*SHIP* BUFR*BUFR* All ship’s meta-data meta-data

23-24 March 2006PMO-III workshop Hamburg BUFR… During transition: 1 on 1 translation SHIP-BUFR, BUFR-SHIP Define final goal (SHIP* and/or BUFR*) Investigate expansion SHIP/BUFR What limitations Report to SOT-IV, V, … During transition: 1 on 1 translation SHIP-BUFR, BUFR-SHIP Define final goal (SHIP* and/or BUFR*) Investigate expansion SHIP/BUFR What limitations Report to SOT-IV, V, …

23-24 March 2006PMO-III workshop Hamburg BUFR… Phase III SHIP*SHIP*BUFR*BUFR* BUFR*BUFR* All ship’s meta-data meta-data