Defence Investment Investissement pour la Defense 1 AC/327 The CNAD “Life Cycle Management Group” AC/327 October 2008.

Slides:



Advertisements
Similar presentations
DoD Logistics Human Capital Strategy (HCS) Executive Overview 1 October 2008.
Advertisements

Innovation and Defence R&D: an Evolving Relationship Six Countries Programme Workshop Linking Defence and Security R&D to Innovation: the challenge ahead.
The 7 th Working Seminar on Performance Auditing Informatisation Performance Report of CNAO National Audit Office of the Peoples Republic of China.
Key Criteria/Principles in selecting indicators Follow-up consultation on TFI Recommendations on Communication for EPI/Polio Dakar - Senegal, 05 and 07.
HLF4 KNOWLEDGE AND INNOVATION SPACE The European Commission Reform for More Effective Capacity Development.
EA Demonstration Study : Dissemination Forum – 8 June EAEA Framework Proposal Paolo Monaco EA Unit.

Linking Technology and Defense. Introduction It stands for Product Life Cycle Support It is an International Standard It is an information standard It.
Achievement of CIS Interoperability – NATO Policy and Processes
Identity Management in a Federated Environment. NATO IdM Initiatives SC/4-SC/5 NATO IdM Workshop (2008/09) SC/4-SC/5 NATO IdM Workshop (2008/09) output:
MOTS & BORDER CONTROL James Kerr RMMV RSA. © Rheinmetall MAN Military Vehicles 2010.
1. Agenda Introduction Context & Scenario Enablers Needs & Requirements Architectural Framework & Methodology NEC Architecture Business Cases Questions.
Presentation to 2013 NA OmegaPS UGM Chris Mair General Manager - PSSL ILS Standards in Europe + UK !
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
NATIONAL PROGRAMME “Bulgaria in NATO and in the European Defence 2020” DOBROMIR TOTEV, PhD Permanent Undersecretary of Defence REPUBLIC OF BULGARIA MINISTRY.
DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
Recent Trends in DoD Systems and Software Engineering Processes Bruce Amato Acting Deputy Director, Software Engineering and Systems Assurance Office of.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Acquiring Information Systems and Applications
0 Mergers & Acquisitions No One Said It Was Easy - But You Can Do It Better 4200 Montrose, Suite 590  Houston, TX (713) Phone  (713)
DEVELOPING A RESULTS-ORIENTED MANAGEMENT FOR DEFENSE R&D, AS A PART OF THE IMPROVEMENT OF BULGARIAN DEFENSE RESOURCE MANAGEMENT’S TECHNOLOGY COL. DOBROMIR.
LAA Judging Criteria & Process 2015
WLE Greater Mekong project: Capacity building and professional development for inclusive governance and water and ecosystem services management of the.
1 Joint Programmes Require Joint Forces: the Management Aspect Francesco Girotti International Relations Division, Bologna University JOIMAN project‘s.
0 STRATEGIC ALLIANCES More Value / Fewer Problems IDENTIFYINVESTIGATEIMPLEMENTINTEGRATE “THE PATH TO SUCCESSFUL STRATEGIC ALLIANCES” 4200 Montrose, Suite.
NATO Unclassified Mr. Henrik DAM Chairman SWGI 10/12/2015 NATO Unclassified.
Page 1 ISO/IEC JTC 1/SC 7/WG 7 N Summary of the Alignment of System and Software Life Cycle Process Standards The material in this briefing.
© 04/08/20011 Logistics Systems Engineering System Cost Analysis NTU SY-521-N SMU SYS 7340 Dr. Jerrell T. Stracener, SAE Fellow.
MOBILITY MANAGEMENT INTRODUCTION MOBILITY MANAGEMENT & TRAVEL AWARENESS INTRODUCTION.
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Defense Acquisition University LOG 204 Configuration Management Course Migration Mr. Bob Cartwright LOG 204 Course Manager October 29, 2004.
Life Cycle Logistics.
D Appendix D.11. Toward Net-Centric Acquisition Oversight A Proposal for an Acquisition Community of Interest (COI) MID 905 Streamlined Acquisition.
Bill Fournier Nov 2014 Systems Engineer for Non SE Bill Fournier
1 | 2010 Lecture 3: Project processes. Covered in this lecture Project processes Project Planning (PP) Project Assessment & Control (PAC) Risk Management.
1 UNEP/IETC EST Initiative Proposed Cooperation Framework 4 December 2003 Otsu, Japan.
1 Presented by William Paggi Head, Contracts Office 15 March 2005.
Presented by Michael W. Sydow, PE Chief, Environmental and IIS Management Branch USAED Savannah Performance Based Contracting A USACE Perspective.
NATO CCMS Pilot Study Meeting, Athens 2006 | Slide 1 Applying Innovative Land Remediation Johan van Veen (TNO) NATO CCMS Pilot Study Meeting Athens, June.
National Innovation Model MOSTI 22 April Page 2 © MIGHT 2008 Proprietary & Confidential Looking Back, Moving Forward Agriculture Based Economy Production.
Objective 1 Development of NATO integrated R&D Management Concept and Model Presented by Assoc. Prof. Dr Tsvetan Tsvetkov UNWE-DNRS
1.1.Recovery strategic planning capacities are strengthened. 1.2.Local capacity for ER planning and implementation strengthened in areas of expertise where.
Sustainment Solutions Envelope (SSE) Sustainment Solutions Envelope (SSE) Presented at the Defense Standardization Program Conference, 16 March 2004.
LOGISTICS HUMAN CAPITAL DEVELOPMENT Randy Fowler DAU November 20, 2006.
U.S. Department of Agriculture eGovernment Program Smart Choice Pre-Select Phase Transition September 2002.
Acquisition Policy SCM-OC July Lesson Outline  US DOD Acquisition Policy and Authority  Acquisition Framework  USG, Foreign Government and Industry.
Joint Information Systems Committee 09/03/2016 | | Slide 1 Toolkit and Demonstrator Calls Section Title Tish Roberts JISC programme Manager.
LOG 235 Performance Based Logistics On the Move: Fielding Expected June 03 Dr. Russell A. Vacante CDSC DAU Thursday 24 October /02 LOG 235.
BOSNIA AND HERZEGOVINA MINISTRY OF DEFENSE Bosnia and Herzegovina Ministry of Defense Skopje, June 2005.
SETTING SECURITY AND DEFENSE R&T POLICY Sofia, UNWE, June 28, 2007 Nikolay Pavlov Centre for National Security and Defense Research – Bulgarian Academy.
SQA project process standards IEEE software engineering standards
DoD Template for Application of TLCSM and PBL
Cost Estimating Investment Planning and Project Management
Life Cycle Logistics.
NSS SMC/XR Template SMC April 2008; rev19 Program Management
CAD/PAD Life Cycle Sustainment Plan (LCSP) 2017 CAD/PAD International Logistics meeting Lee Manis USN/USMC CAD/PAD APML 23 May 2017.
SQA project process standards IEEE software engineering standards
Milestone A to Milestone B Requirements Management Activities
Acquisition Sustainment Tool Kit (ASTK
New Zealand Partnerships for International Development
Impact Reporting Framework Use with Impact Report Template
INCOSE – North Texas Chapter
Product Support Considerations
DoD Automatic Test Systems (ATS) Strategies
Swedish Defence Materiel Administration (FMV)
Software Development Process
Dr. Glenn Lamartin Director, Defense Systems Office of the Under Secretary of Defense (AT&L)
POLICY, CONTRACTING AND SYSTEMS ENGINEERING SUBCOMMITTEE
AM Supply Chain Integration
Capability Maturity Model
Presentation transcript:

Defence Investment Investissement pour la Defense 1 AC/327 The CNAD “Life Cycle Management Group” AC/327 October 2008

Defence Investment Investissement pour la Defense 2 AC/327 LCMG contribution to Armaments Activities LCMG DESIGN FOR NATO OPERATIONS Common standards quality, testing, etc. Materiel standards (joint) to support interoperability Integrated logistic support BEST PRACTICES in: Project Management Systems Engineering Using International Standards GUIDANCE FOR NATO/COOPERATIVE/NATIONAL PROGRAMMES System Life Cycle Management; Programme Management; Integrated Logistic Support – agreed guidance and templates. ACT requirements development CNAD programmes NATO Agencies Nations NATO Quality Assurance System

Defence Investment Investissement pour la Defense 3 AC/327 Supporting this in NATO: NATO Policy for System Life Cycle Management CNAD Life Cycle Management Group - AC/327 providing NATO with the tools to implement Systems Life Cycle Management in Defence Systems Acquisition Performance Schedule Cost Quality Operational Environments Integrated Logistic Support Obsolescence NATO Life Cycle Stages and Processes Acquisition Practices

Defence Investment Investissement pour la Defense 4 AC/327 AAP-48 NATO System Life Cycle Stages and Processes StagesStages Entry Criteria Exit Criteria ProcessesProcesses Activities Input/Output Tailoring Tools/Methods Life Cycle ModelLife Cycle Model Guidance Implementation GuidanceImplementation Guidance AAP-48 NATO System Life Cycle Stages and Processes StagesStages Entry Criteria Exit Criteria ProcessesProcesses Activities Input/Output Tailoring Tools/Methods Life Cycle ModelLife Cycle Model Guidance Implementation GuidanceImplementation Guidance Enterprise Processes Agreement Processes Project Processes Technical Processes Life Cycle DEVELOPMENT PRODUCTION UTILIZATION SUPPORT RETIREMENT CONCEPT Applying SLCM in NATO

Defence Investment Investissement pour la Defense 5 AC/327 System/Equipment Life Cycle Costs: Concept & Technology Development Pre-System Acquisition System Acquisition (Engineering, Development, Demonstration, Production) System Development & Demonstration Production & Deployment Sustainment & Disposal Operations, Sustainment & Disposal Dev Cost Disp Cost 60-80% of Total LCC Prod Cost Operate & Support Cost What you do here Has a Serious impacts here

Defence Investment Investissement pour la Defense 6 AC/327 Our Common Defence Need Acquisition of armament systems/equipment to REQUIRED PERFORMANCE AND QUALITY to REQUIRED PERFORMANCE AND QUALITY with proven NATO INTEROPERABLE with proven NATO INTEROPERABLE in a TIMELY manner in a TIMELY manner and within BUDGET and within BUDGET AC/327 Objective