Elmar Zilles Head Broadcasting, Federal Network Agency, Germany Transition to Digital Broadcasting and Digital Dividend ITU Regional Seminar for Europe,

Slides:



Advertisements
Similar presentations
WAPECS - A more flexible spectrum management approach Isolde Goggin Chairperson of COMREG, Ireland, and RSPG Rapporteur on WAPECS.
Advertisements

Digital Dividend in the UK Graham Louth, Director of Spectrum Markets Joint Acting Head of Spectrum Policy 9 June 2009 Baltic Sea Summit on Digital Dividend.
Regulation and Policy Challenges
European EAM related higher education in Europe: An overview Thomas Fischer & Urmila Jha-Thakur Presented in Seminar on Experiences in S Korea, Japan and.
About GSMA Europe We represent the interests of the worldwide mobile communications industry and have nearly 800 operator members covering over 200 countries.
A Radio Spectrum Policy Programme for Europe: Impact of the Digital Switchover on EU Citizens Nicola Frank Head of European Affairs Brussels, 12 January.
ADVANCED SATELLITE INTERNET SERVICES VIA BROADBAND IN CASTILLA Y LEÓN REGION promoting universal access to broadband, reaching the least populated rural.
1 European Commission DG TREN / C: Conventional Energy The Regional Electricity Market in South East Europe: Mechanisms and Aims in Unified.
Conversion of Analogue Assignments into Digital Allotments Conversion of Analogue Assignments into Digital Allotments The Channel Potential Method Dr.
Fundamental Considerations for the Deployment of DTT Transmission Facilities in South Africa F.Lindeque Pr. Tech Group Executive : Network Services Sentech.
International Telecommunication Union World Radiocommunication Seminar (Geneva, 6-10 December 2010)
RRC 04/05 ITU Information meeting September Computer methods for planning Ken Hunt Rapporteur for Chapter 10.
BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Planning Principles and Approaches Сентябрь 2004 Москва David Botha.
BR/TSD Dakar 2005 Workshop for the African Group of Countries BCD Planning Principles and Approaches 25 – 29 April 2005 Dakar David Botha.
IMPLEMENTATION OF TERRESTRIAL DIGITAL TELEVISION IN ROMANIA Ministry of Communications and Information Society (Romania)
ITU Regional Development Forum - Warsaw 7 May The Radio Spectrum Policy Programme & the Spectrum Inventory Pearse ODonohue Head of Radio Spectrum.
Pacific Regional Digital Strategy II Suella Hansen & Noelle Jones Presentation for APT 28 April 2010.
1 ITU Interconnection Workshop 17 August 2001 Role of the Regulator K S Wong Office of the Telecommunications Authority Hong Kong, China.
DIGITAL SWITCHOVER STRATEGY IN ALBANIA
1 Switchover from Analogue to Digital Terrestrial Television Broadcasting in Central and Eastern Europe Case study of Germany (based on MABB reports) Péter.
Wiktor Sęga, Office of Electronic Communications, Poland
ITU Case Studies for Serbia, Germany, Poland and Hungary Mr Peter Vari ITU Expert.
Wiktor Sęga, Office of Electronic Communications, Poland
Switchover from Analogue to Digital Terrestrial Television Broadcasting in Central and Eastern Europe Case study of Serbia Péter Vári Belgrade, 28th April.
1 Switchover from Analogue to Digital Terrestrial Television Broadcasting in Central and Eastern Europe Case Study of Poland Péter Vári Belgrade, 28th.
1 Switchover from Analogue to Digital Terrestrial Television Broadcasting in Central and Eastern Europe Case Study of Hungary Péter Vári Belgrade, 28th.
1 Brazilian Governments move to promote Broadband access throughout the country Cristina Coutinho Moreira 8 September 2008, ITU Headquarters, Geneva, Switzerland.
FIXED SATELLITE SERVICE and UAS (22 September 2010)
Shared Use of Radio Spectrum in the EU
RADIO FREQUENCY ASSIGNMENTS FOR WIRELESS BROADBAND Augutis Čėsna Deputy Director of Radio Communication Department Communications Regulatory Authority.
Regional Preparatory Workshop for the ITU WRC-2015
Implementing Geolocation: enabling white space devices in the UK Prof. H Nwana 5 October 2011 TV White Spaces Spectrum in Africa Workshop.
Soontai LTE Filter v1.0.
The need to harmonize spectrum for mobile
DEP – Pierre PETILLAULT, Didier GUILLOUX, Bernard CELLI – 20/10/ Mobile television Regulatory and Market Issues The French case François Rancy
Digital terrestrial TV Transition German Experience
Elmar Zilles Head Broadcasting, Federal Network Agency, Germany Transition to Digital Broadcasting and Digital Dividend ITU Regional Seminar for Europe,
István BOZSÓKI, ITU/BDT/TND
Transition to Digital Broadcasting and Digital Dividend 5-7 November 2012, Budapest, Hungary Momčilo Simić Adviser for International Relations Former President.
TRANSITION TO THE DIGITAL TERRESTRIAL TELEVISION BROADCASTING IN TURKEY 05 NOVEMBER 2012, BUDAPEST Information and Communication Technologies Authority.
Elmar Zilles Head Broadcasting, Federal Network Agency, Germany TRANSITION TO DIGITAL TERRESTRIAL TELEVISION BROADCASTING, BORDERLINE FREQUENCY COORDINATION.
BAU 2011 Europe’s building industry after the crisis – What now? Erich Gluch ifo Institute for Economic Research, Munich BAU Information Talks on 28 October.
DG Information Society PSC 1 The 1999 Communications Review Peter Scott DG Information Society Brussels EUROPEAN COMMISSION.
Directie Toezicht Energie, Bonn WS 8 february Bonn 1 SG Workshop: Secondary markets for interconnection capacity: way to adress contractual congestion.
Hungarian frequency tender Tender of spectrum licences for broadband services Emília Ulelay Deputy Head of Department Frequency- and Identifier Management.
Study on Digital Switchover Plan in SATRC Countries 2 nd SATRC Spectrum WG Meeting March, 2014 Tehran, I.R.Iran Rumana Haque Bangladesh Telecommunication.
Transition to Digital Broadcasting and Digital Dividend 6-7 October 2011, Belgrade, Serbia Sub-Regional Workshop on Transition to Digital Broadcasting.
March 2008 Spectrum policy and digital dividend Michel Azibert, deputy CEO, TDF PPE-DE hearing, Brussels, 5 March 2008.
Geolocation databases for spectrum sharing : ECC findings and studies EC DG CONNECT Workshop, 20 March 2015 Bruno Espinosa, Deputy Director, ECO.
UK Spectrum Management Strategy: tomorrow’s challenges today Chris Woolford Director, International Spectrum Policy Radcomms 2014.
10 th International Electronic Communications Regulators Conference 8 th May 2015 Future of mobile: 4G and Beyond Eric Fournier Chairman, Electronic Communications.
SECONDARY SPECTRUM TRADING. OPPORTUNITIES AND DIFFICULTIES IN EU Ana Gónzalez David Rojo Claudio Feijóo Sergio Ramos Grupo de Tecnologías de la Información.
Augutis Čėsna, RRTLatest Radio Spectrum Policy Developments1 Latest Radio Spectrum Policy Developments. Spectrum dividend Augutis Čėsna Deputy Director.
Regional Regulatory Seminar on Transition to Digital Terrestrial Television Broadcasting and Digital Dividend for Europe, Budapest, Hungary, 5-7 November.
LONG TERM VISION FOR THE UHF BROADCASTING BAND FORECAST 2014, Shaping future broadcasting EBU, Geneva 5-6 November 2014 Session 1 – How will the UHF band.
Strategy of efficient Frequency Usage in the Republic of Moldova. Digital Dividend and Transition to Digital TV Regional Meeting on Mobile Communications.
Program for Development of Broadband Internet Access in Republic of Moldova and results of its implementation.
1 Electronic Media Market in Poland and its Possible Changes as a Result of Digitalization of Terrestrial TV and Radio Broadcasting Andrzej Zieliński Polish.
Radio Frequency Spectrum Management in Indonesia - 3G/IMT 2000, TV Digital and other Wireless Activities And Issues - 3G/IMT 2000, TV Digital and other.
1 COMMUNICATIONS REGULATION COMMISSION Republic of Bulgaria MOBILE BROADBAND EUROPE – BULGARIAN EXPERIENCE IN THE DEVELOPMENT OF THE MOBILE BROADBAND ACCESS.
CHANGING TECHNOLOGIES: Implications for viewers & listeners Philip Laven VLV Autumn Conference November 2014.
Radio Spectrum Strategy Petr Zeman, International Relations Department Czech Telecommunication Office.
Conselheiro José Leite1 JOSÉ LEITE PEREIRA FILHO Member of the Board PORTO SEGURO, BA 4 JUNE 2001 ITU-T SEMINAR Multimedia in the 21st Century.
Federal Ministry of Economics and Technology, VII B 3 "Digital Broadcasting" Initiative 1 The Initiative „Digital Broadcasting“ of the German Government,
Transition to Digital Broadcasting and Digital Dividend 6-7 October 2011, Belgrade, Serbia 1 Sub-Regional Workshop on Transition to Digital Broadcasting.
Third Generation mobile Licensing: the UK approach Jane Humphreys Radiocommunications Agency, UK.
Fondazione Ugo Bordoni Evolution of Wireless Access systems Maria Missiroli.
PRESENTATION OF MONTENEGRO
Radio Spectrum Policy in Europe
Licensing the 800 MHz band in Sweden
Presentation transcript:

Elmar Zilles Head Broadcasting, Federal Network Agency, Germany Transition to Digital Broadcasting and Digital Dividend ITU Regional Seminar for Europe, Budapest, 05 – 07 November 2012

2 Digital Dividend – what’s that ?  Practical approach: The Digital Dividend is understood as the additional spectrum, which will become available as a consequence of the digitalisation and proper establishment of existing analogue services, based on new, efficient transmission and coding technologies  Origin The Digital Dividend results from a development on the technological, not on the political level! A proper establishment takes into account all societal needs and is based on political decisions.

< 10% Belgium, The Netherlands, Austria Switzerland 25-50% Denmark, Finland, Ireland, Norway, Poland, Hungary, Sweden > 60% France, Greece, Italy, Spain, Czech Republic, UK 3 “Facts” /History of Digital Dividend (1) Different relevance of terrestrial provision of broadcasting in different countries  Mentionable differences in terms of the primary terrestrial service (i. e. the provision for the main TV set in a household) Consequence Differences in terms of quality and of quantity of the Digital Dividend have to be considered

Number of independent networks  Capacity claim is caused by number of programmes, NOT by percentage of provision!  “Regulatory” impact! “Facts” /History of Digital Dividend (2)

Market development in the German country case  In 2006 first time that more flat screen were sold than CRT-devices  By middle of 2012 more than 45 million high resolution TV sets in German households  (Near) future fixed reception situation: more than 90 % of TV sets capable of “Full HD” need 8 to 20 Mbit/s programme streams  About 30 programmes needed to satisfy recipients to a 95 % extent,  via terrestrial reception very difficult even with DVB-T2 and H.264/AVC  Different conclusion for portable and/or mobile reception with smaller displays  Different feeds for different application situations? 5 “Facts” /History of Digital Dividend (3)

6 Transforming the Digital Dividend into consumers benefits (1)  More broadcasting  Added value within broadcasting  ”better broadcasting”  Additional services other than broadcasting  “better life”

7 Transforming the Digital Dividend into consumers benefits (2)  More broadcasting  3 nationwide networks DVB-T (public broadcasters)  up to 4 additional networks region-wise/cities (private broadcasters)  12 to 30 programmes instead of 3 to 7  Added value within broadcasting  possibly introduction of DVB-T2 including plans for HDTV for some programmes

Transforming the Digital Dividend into consumers benefits (3) 8  Provision was made in the economic stimulus package II  Federal government’s broadcasting strategy: 800 MHz band to be used promptly to provide sparsely populated areas with innovative mobile applications and broadband internet access [approx. 2.5 million households in Germany have no internet access with a minimum of 1 Mbit/s]  Original idea  No later than the end of 2010 efficient broadband connections should be available throughout Germany  No later than % of the households, until 2018 for all households connections with at least 50 Mbit/s should be available  Answers to current available dynamic demands due to improved offers  High speed radiocommunication high power networks; in addition further construction/expansion of wired high power networks as well as in seemingly non lucrative areas  Goal achieved with “mixed resources” (broadband atlas,

9 Approach and activities in Germany Objectives  Efficient usage  Guarantee for the development of broadcasting, though win-win-situation  Quickest possible expansion of the broadband supply in rural areas (IMT) No special path, but agreed approach in Europe under consideration of the different initial situations of the individual countries way

10 Approach and activities in Germany (2) Conclusion for the regulation  Technology neutrality  Flexibility  Regulation should and may business planning of the market participants not prejudice and narrow down  Planning certainty  Regulatory framework should not exclude, rather encourage incentives and secure investments  Consideration of the different long term initial scenarios in various European countries  In the short and medium time frame the different infrastructure conditions in the various countries have to be considered and developed in order to satisfy the existing and developing requirements of the users

11 Approach and activities in Germany (3) Overall concept for a more flexible use of spectrum  Liberalisation of existing licenses at 450 MHz (wideband trunked radio [PAMR], 900/1800 MHz (GSM), 2 GHz (IMT/UMTS) and 3.5 GHz (BWA) as quickly as possible  Award of MHz spectrum (decision published 21/10/2009)  combining award at 1.8/2/2.6 GHz with award at 800 MHz  spectrum auction  technology and service neutrality for Electronic Communications Services (ECS; can be used for mobile, fixed or nomadic systems or applications)  spectrum cap in the band 800 MHz (2 x 20 MHz, paired)  Applications for qualification to take part in the auction were to be submitted until 21/01/2010  Detailed information on all steps may be requested !!

12 Approach and activities in Germany (4) Additional Coverage Obligations  4 priority classes  General requirement for each assignee to meet the obligation with 800 MHz spectrum  Other technologies are credited  Degree of coverage: 90 % of the population by 2016 As of October 8 th, 2012: Obligation completely fulfilled in all but one federal state P 4 > 50k P 3 20k – 50k P 2 5k – 20k Priority 1 Inhabitants < 5k 90% P1 coverage 90% P2 90% P3

13 Approach and activities in Germany (5)  Spectrum cap of 2 x 20 MHz (paired) for the 800 MHz band, account to be taken of the spectrum assigned in the 900 MHz band  Possibility for each bidder to acquire more than 2 x 5 MHz  This means for 800 MHz:  newcomers: max. 2 x 20 MHz  E-Plus / O2:max. 2 x 15 MHz  Vodafone / Telekom: max. 2 x 10 MHz

14 The auction  Open ascending simultaneous multiround auction  Start date: 12 April 2010  Duration: 224 auction rounds  End of auction: 20 May 2010  Amount of minimum bids for total spectrum at the beginning: 90 million € Digital Dividend 1.8 GHz / 50 MHz MHz

15 The auction (2)

16 The auction (3)  Outcome 283,645,000 € 1,299,893,000 € 1,422,503,000 € 1,378,605,000 € 99.1 MHz 69.8 MHz 95 MHz 94.9 MHz 800 MHz 3,57 billion € (81.5% for 60 MHz) Other bands 0.81 billion € (18.5% for MHz) 800 MHz 3,57 billion € (81.5% for 60 MHz) Other bands 0.81 billion € (18.5% for MHz) in total 4.38 billion € MHz in total 4.38 billion € MHz

17 The auction (4) Spectrum price per hertz € / Hz 59,61 1,732,09 8,79 0,601,84 unpaired

18 The auction (5) Spectrum held by the network operator after the auction MHz 95,0 MHz 99,1 MHz (auctioned spectrum) 69,8 MHz 94,9 MHz 59,6 MHz 64,6 MHz (already assigned spectrum) 69,6 MHz 59,6 MHz 163,7 MHz 139,4 MHz 154,5 MHz 154,6 MHz

19 Fields tackled after the auction (1) Mainly:  Allotment of the abstract frequency blocks won  Compatibility issues between German use and use in adjacent countries  Compatibility issues between mobile and PMSE  Compatibility issues between mobile and broadcasting services

20 Fields tackled after the auction (2) Allotment of the abstract frequency blocks won  The abstract frequency blocks won were to be allotted to their highest bidders at the end of the auction with a view to assigning contiguous spectrum  The successful bidders had the opportunity to agree amongst themselves, within a period of three month of the close of the auction, the spectral position of their blocks in the particular frequency band  If agreement between the successful bidders was not reached within this period, BNetzA would concentrate initially on the aspect of assigning contiguous spectrum and will allot the abstract blocks won in the bands at 800 MHz and 2.6 GHz  Done !!!

21 Fields tackled after the auction (3) Compatibility issues between German use and use in adjacent countries  On the long run, harmonised approach preferred  Short-term problems to be solved on a bilateral basis  Common tackling of common issues !!  Very good progress made (e. g. in WEDDIP and NEDDIF)  Agreements exist with nearly all neighbouring countries, allowing for the application of appropriate field strength values for bilateral co-ordination  Only few cases left for co-ordination mobile versus broadcasting or other service

22 Fields tackled after the auction (4) Compatibility issues between mobile and PMSE  In principle, no legal basis for protection of PMSE, but huge political interest  Frequency allocation issues solved by new concept for PMSE  Compensation for necessary replacements of equipment approved by German Federal Council  Rules set

23 Fields tackled after the auction (5) Compatibility issues between mobile and broadcasting services  Roll-out mobile service has to protect broadcasting  Three-level-approach 1. Definition of Block Edge Mask in advance (How to construct devices ?) 2. Definition of sets of technical characteristics of mobile service stations (after auction, but in advance of each single use of a station) 3. Corrective steps in case of unforeseen problems  Re-channeling of existing broadcasting usage on channels 64–66 (done!)  Refunding approved by German Federal Council  Ongoing for 2. and 3.!!

24 Fields tackled after the auction (6) Computer-aided definition of sets of technical characteristics  Individually done per base station  Transparent algorithm, open to MNOs  Based on data relevant for frequency planning, also open to MNOs  Effect: issuing sets of technical characteristics transparent and predictable Corrective steps in case of unforeseen problems  Any appropriate measure welcome  MNOs take self-obligations for selection of measures INDIVIDUAL LY per base station  About 6000 base stations in operation in 800 MHz range  Interference disappeared in 5 cases after adjustments of receiving situation or application of filters  No more cases known!

25 And the future?  Simply more spectrum for MNOs (“Digital Dividend II”) or a sustainable approach for the supply of capacity for mobile and broadcasting services in the UHF-Band? All UHF band neither for MNOs nor for broadcasting sufficient Implementation of 700 MHz even easier than 800 MHz? Physical separation (“allocation”) versus logical separation (capacity per service in a common network structure) Collaboration instead of conflicts For all UHF?! Party to be joined at the earliest point of time possible! WRC-15 not to be taken as singular point, nor as a final stage, but as the first step in a binding process This time, it is not a “dividend”!

Elmar Zilles Transition to Digital Broadcasting and Digital Dividend ITU Regional Seminar for Europe, Budapest, 05 – 07 November 2012