Analyze the information brought by the polarization diversity (HH-VV-HV for ASAR, full-polarimetric for airborne radar) for wind and wave studies Validate.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

1 A B C
Scenario: EOT/EOT-R/COT Resident admitted March 10th Admitted for PT and OT following knee replacement for patient with CHF, COPD, shortness of breath.
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
AP STUDY SESSION 2.
1
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
David Burdett May 11, 2004 Package Binding for WS CDL.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
We need a common denominator to add these fractions.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
2. The WAM Model: Solves energy balance equation, including Snonlin
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
CALENDAR.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 10 second questions
Environmental Remote Sensing GEOG 2021 Lecture 2 Image display and enhancement.
Learning to show the remainder
ZMQS ZMQS
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
Chapter 7: Steady-State Errors 1 ©2000, John Wiley & Sons, Inc. Nise/Control Systems Engineering, 3/e Chapter 7 Steady-State Errors.
Break Time Remaining 10:00.
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
1 The Royal Doulton Company The Royal Doulton Company is an English company producing tableware and collectables, dating to Operating originally.
BEEF & VEAL MARKET SITUATION "Single CMO" Management Committee 22 November 2012.
VOORBLAD.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Page 1 ASAR Validatoin Review - ESRIN – 9-13 December 2002 Ocean geophysical results from ASAR  Geophysical overview  ocean spectra : the isidore case.
Page 1 ASAR Validation Workshop - ESRIN – December 2002 Preliminary Performance of the ASAR Wave Level WVS and WVW Product Frank Melger ARGOSS.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Page 1 ENVISAT Press Day - ESTEC, 1 February 2001 Fabio Rocca Dipartimento di Elettronica e Informazione Politecnico di Milano Envisat for the physics.
Squares and Square Root WALK. Solve each problem REVIEW:
1..
Adding Up In Chunks.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
1 Verification of wave forecast models Martin Holt Jim Gunson Damian Holmes-Bell.
Before Between After.
Addition 1’s to 20.
25 seconds left…...
: 3 00.
Januar MDMDFSSMDMDFSSS
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Week 1.
Let’s take a 15 minute break Please be back on time.
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
We will resume in: 25 Minutes.
Converting a Fraction to %
Clock will move after 1 minute
PSSA Preparation.
Slide: 1 Version 0.3, 20 January 2004 METEOSAT SECOND GENERATION (MSG) METEOROLOGICAL USE OF THE SEVIRI HIGH-RESOLUTION VISIBLE (HRV) CHANNEL Contact:Jochen.
Physics for Scientists & Engineers, 3rd Edition
Select a time to count down from the clock above
1.step PMIT start + initial project data input Concept Concept.
DOCUMENT OVERVIEW Title: Fully Polarimetric Airborne SAR and ERS SAR Observations of Snow: Implications For Selection of ENVISAT ASAR Modes Journal: International.
(2) Norut, Tromsø, Norway Improved measurement of sea surface velocity from synthetic aperture radar Morten Wergeland Hansen.
Envisat Validation Workshop
Presentation transcript:

Analyze the information brought by the polarization diversity (HH-VV-HV for ASAR, full-polarimetric for airborne radar) for wind and wave studies Validate and improve (if possible) the inversion algorithm used to estimate wave spectra from SAR (level 2 algorithm) Extend inversion algorithms to configurations other than IM2, VV The VALPARESO experiment Status and overview of the data set collected D. Hauser, A. Mouche (CETP) ENVISAT Calibration Review, Frascati, 9-13 December 2002 Objectives

Procedure: Flights performed with the airborne polarimetric radar STORM, in conjunction with ASAR acquisitions in Image Mode (IS1,IS2, IS3, AP3), different polarizations In situ measurements: wind and waves at two locations within the ASAR and STORM swath (PHAROS buoy + Scilly) Archive of wave model predictions (WAM, VAG) Location of the experiment: Near Atlantic and English Channel (flights from Brest, Brittany, France) Dates: 19 October-21 November 2002

ASAR: 21 set of ASAR data requested, 20 scheduled (One cancelled- orbit 3781) due to Leonides meteor 3 ASAR data sets already provided by ESA ( ) PHAROS BUOY: continuous measurements. Wind speed, and direction, Hs, 1D spectrum already available, 2D spectra to be processsed (and assessed) VALPARESO DATA SET STORM 21 Flights planned with STORM, 14 performed in conjunction with ASAR data 2 flights (3 Nov, 20 Nov) without SAR acquisition 6 cancellation of flights with STORM due to meteorological conditions (5) or aircraft problem (1)

=> Full polarimetric information => breaking?? STORM instrument: Polarimetric radar using a real-aperture system, same frequency as ASAR STORM data analysis => Wave spectra (without the limitation of SAR due to velocity bunching)- Hauser et al, 1992  - Radar Cross-section in HH, VV,HV at incidence angles from 5 to 35° or from 20 to 55° (more limited range in HV)  Wind speed (from empirical models such as C-mod)) and wind direction  Information on hydrodynamic modulation (Hauser et al, 1996), useful for SAR analysis at moderate incidence angles (≥20°)

Buoy at the Scilly IslandsPharos buoy Typical flight plan With the STORM radar 11 November 18:40-20:40 Coincident ASAR data: orbit 3662, 21:50 TU Im1,VV (waiting for the ASAR data to be processed

20 October 2002, orbit 3340, descending pass, 10:23:51, IM3-VV (Data received) Airborne radar measurements Pharos buoy

Wind and wave conditions At Pharos location 48°31’N, 5°49’W 26 October 10 cases of ASAR data sets (among 20) in conditions of wind > 10 m/s and wave height > 2 m 9 with STORM data

Significant period of the waves

Preliminary attempt to retrieve the wave spectrum from a subset of SLC image => orbit 3433 (Im2-HH) (A. Mouche) adaptation of the inversion algorithm provided by IFREMER and NORUT to the image case !! VERY PRELIMINARY

26 October 21:56, Orbit 3433

Extraction from ASAR SLC Image (IS2-HH) Orbit 3433, Location 49.15N, W Inverted spectrum Observed Wind: 17 m/s, 230° Retrieved waves: peak wavelength 220 m Peak direction 110° H SAR = 3.9 m

With ASAR (3340) and STORM With ASAR (3347) 1D wave weight spectra on October 26 from PHAROS

CONCLUSION Good data set (although less flights with STORM than planned) Good sea-state situations Present work analysis of ASAR images analysis of ASAR images STORM data processing (to obtain wave spectra and radar cross-section) STORM data processing (to obtain wave spectra and radar cross-section) Waiting for other ASAR data